Ian Flood
Affiliations: | University of Florida, Gainesville, Gainesville, FL, United States |
Area:
Architecture, Civil Engineering, Computer ScienceGoogle:
"Ian Flood"Children
Sign in to add traineeHuanqing Lu | grad student | 2002 | UF Gainesville |
Caesar Abi Shdid | grad student | 2005 | UF Gainesville |
Ivan A. Mutis-Sin | grad student | 2007 | UF Gainesville |
Sang C. Lhee | grad student | 2009 | UF Gainesville |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Zhang X, Flood I, Zhang Y, et al. (2019) A Cost Model to Evaluate the Economic Performance of Contour Crafting Computing in Civil Engineering. 618-625 |
Shojaei A, Flood I. (2017) Stochastic forecasting of project streams for construction project portfolio management Visualization in Engineering. 5: 1-13 |
Pereira RE, Flood I. (2017) Impact of linear correlation on construction project performance using stochastic linear scheduling Visualization in Engineering. 5: 8 |
Wao JO, Flood I. (2016) The role of quantity surveyors in the international construction arena International Journal of Construction Management. 1-12 |
Flood I. (2015) Modeling construction processes: A structured graphical approach compared to construction simulation Congress On Computing in Civil Engineering, Proceedings. 2015: 491-498 |
Zhang Y, Flood I. (2014) Planning and scheduling prefabrication construction projects using dependency structure matrix (DSM) Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference On Computing in Civil and Building Engineering. 1457-1464 |
Lhee SC, Flood I, Issa RRA. (2014) Development of a two-step neural network-based model to predict construction cost contingency Journal of Information Technology in Construction. 19: 399-411 |
Hu J, Flood I. (2012) A multi-objective scheduling model for solving the resource-constrained project scheduling and resource leveling problems Congress On Computing in Civil Engineering, Proceedings. 49-56 |
Lhee SC, Issa RRA, Flood I. (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks Journal of Construction Engineering and Management. 138: 22-30 |
Ibrahim A, Salim H, Flood I. (2011) Damage prediction for RC slabs under near-field blasts using artificial neural network International Journal of Protective Structures. 2: 315-332 |