David Arditi
Affiliations: | Illinois Institute of Technology, Chicago, IL, United States |
Area:
Civil Engineering, Operations Research, Computer ScienceGoogle:
"David Arditi"Children
Sign in to add traineeJorge Abeid | grad student | 2000 | Illinois Institute of Technology |
Mehmet M. Bolukbasi | grad student | 2000 | Illinois Institute of Technology |
Krishna Mochtar | grad student | 2000 | Illinois Institute of Technology |
Obaid S. Al-Sobiei | grad student | 2001 | Illinois Institute of Technology |
Almula Koksal | grad student | 2002 | Illinois Institute of Technology |
Suat M. Gunhan | grad student | 2003 | Illinois Institute of Technology |
Onur B. Tokdemir | grad student | 2003 | Illinois Institute of Technology |
Saim B. Kaplanoglu | grad student | 2007 | Illinois Institute of Technology |
Thaveeporn Pulket | grad student | 2008 | Illinois Institute of Technology |
Gozde Basak Ozturk | grad student | 2006-2010 | Illinois Institute of Technology |
Ranon Chotibhongs | grad student | 2011 | Illinois Institute of Technology |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Türkakın OH, Manisalı E, Arditi D. (2020) Delay analysis in construction projects with no updated work schedules Engineering, Construction and Architectural Management |
Akcay EC, Dikmen I, Birgonul MT, et al. (2019) NEGOTIATING THE SELLING PRICE OF HYDROPOWER ENERGY USING MULTI-AGENT SYSTEMS IN BOT Journal of Civil Engineering and Management. 25: 441-450 |
Alavipour SR, Arditi D. (2019) Maximizing expected contractor profit using an integrated model Engineering, Construction and Architectural Management. 26: 118-138 |
Arditi D, Alavipour SMR, null n. (2019) Trends in Expectations about Duties and Responsibilities of Construction Managers Journal of Construction Engineering and Management-Asce. 145: 4019037 |
Alavipour SR, Arditi D. (2019) Time-cost tradeoff analysis with minimized project financing cost Automation in Construction. 98: 110-121 |
Gurgun A, Arditi D. (2018) Assessment of Energy Credits in LEED-Certified Buildings Based on Certification Levels and Project Ownership Buildings. 8: 29 |
Alavipour SMR, Arditi D. (2018) Optimizing Financing Cost in Construction Projects with Fixed Project Duration Journal of Construction Engineering and Management. 144: 04018012 |
Alavipour SR, Arditi D. (2018) Impact of contractor's optimized financing cost on project bid price International Journal of Project Management. 36: 808-818 |
Akcay EC, Dikmen I, Birgonul MT, et al. (2017) Estimating the profitability of hydropower investments with a case study from Turkey Journal of Civil Engineering and Management. 23: 1002-1012 |
AKCAY EC, ARDITI D. (2017) Desired points at minimum cost in the “Optimize Energy Performance” credit of leed certification Journal of Civil Engineering and Management. 23: 796-805 |