Yi-Chi Wang, Ph.D.
Affiliations: | 2003 | Mississippi State University, Starkville, MS, United States |
Area:
Industrial Engineering, Computer ScienceGoogle:
"Yi-Chi Wang"Parents
Sign in to add mentorJohn M. Usher | grad student | 2003 | Mississippi State University | |
(Application of reinforcement learning to multi-agent production scheduling.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Chen TT, Wang Y. (2019) An incremental learning and integer-nonlinear programming approach to mining users' unknown preferences for ubiquitous hotel recommendation Journal of Ambient Intelligence and Humanized Computing. 10: 2771-2780 |
Wang Y, Chen TT. (2018) A Direct-solution Fuzzy Collaborative Intelligence Approach for Yield Forecasting in Semiconductor Manufacturing Procedia Manufacturing. 17: 110-117 |
Wang Y, Kim D, Katayama H, et al. (2018) Optimization of machining economics and energy consumption in face milling operations The International Journal of Advanced Manufacturing Technology. 99: 2093-2100 |
Chen T, Wang Y. (2017) A nonlinearly normalized back propagation network and cloud computing approach for determining cycle time allowance during wafer fabrication Robotics and Computer-Integrated Manufacturing. 45: 144-156 |
Chen T, Wang Y, Lin Z. (2017) Predictive distant operation and virtual control of computer numerical control machines Journal of Intelligent Manufacturing. 28: 1061-1077 |
Wang YC, Wang MJ, Lin SC. (2015) Selection of cutting conditions for power constrained parallel machine scheduling Robotics and Computer-Integrated Manufacturing |
Chen T, Wang Y. (2014) An Agent-Based Fuzzy Collaborative Intelligence Approach for Precise and Accurate Semiconductor Yield Forecasting Ieee Transactions On Fuzzy Systems. 22: 201-211 |
Chen T, Lin C, Wang Y. (2013) A Fuzzy Collaborative Forecasting Approach for WIP Level Estimation in a Wafer Fabrication Factory Applied Mathematics & Information Sciences. 7: 1465-1470 |
Chen T, Wang Y. (2013) A Fuzzy Rule for Improving the Performance of Multiobjective Job Dispatching in a Wafer Fabrication Factory Journal of Applied Mathematics. 2013: 1-18 |
Chen T, Wang Y. (2013) Enhancing the Long-Term Yield Competitiveness of a Semiconductor Manufacturing Factory Using a Multiobjective Fuzzy Nonlinear Programming Approach Mathematical Problems in Engineering. 2013: 1-11 |