Carl T. Haas
Affiliations: | University of Texas at Austin, Austin, Texas, U.S.A. |
Area:
Civil Engineering, Industrial Engineering, Labor EconomicsGoogle:
"Carl Haas"Children
Sign in to add traineeYong-Kwon Cho | grad student | 2000 | UT Austin |
Dingshan S. Zhou | grad student | 2000 | UT Austin |
Hyoungkwan Kim | grad student | 2002 | UT Austin |
Kamel Saidi | grad student | 2002 | UT Austin |
Soon-Wook Kwon | grad student | 2003 | UT Austin |
Stefanie G. Brandenburg | grad student | 2004 | UT Austin |
Michael P. Pappas | grad student | 2004 | UT Austin |
Salwa M. Beheiry | grad student | 2005 | UT Austin |
Jongchul Song | grad student | 2005 | UT Austin |
Issam M. Srour | grad student | 2005 | UT Austin |
Jonathan R. Sylvie | grad student | 2005 | UT Austin |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Shahi S, Esfahani ME, Bachmann C, et al. (2020) A definition framework for building adaptation projects. Sustainable Cities and Society. 63: 102345 |
Rausch C, Edwards C, Haas C. (2020) Benchmarking and Improving Dimensional Quality on Modular Construction Projects – A Case Study International Journal of Integrated Care. 1: 2-21 |
Chen Q, Adey BT, Haas CT, et al. (2020) Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies Construction Innovation: Information, Process, Management. 20: 471-508 |
Enshassi MSA, Walbridge S, West JS, et al. (2020) Probabilistic Risk Management Framework for Tolerance-Related Issues in Modularized Projects: Local and Global Perspectives Asce-Asme Journal of Risk and Uncertainty in Engineering Systems, Part a: Civil Engineering. 6: 4019022 |
Esfahani ME, Rausch C, Haas C, et al. (2020) Prioritizing Preproject Planning Activities Using Value of Information Analysis Journal of Management in Engineering. 36: 4020064 |
Enshassi MSA, Walbridge S, West JS, et al. (2020) Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory Journal of Construction Engineering and Management-Asce. 146: 4019096 |
Sanchez B, Rausch C, Haas C, et al. (2020) A selective disassembly multi-objective optimization approach for adaptive reuse of building components Resources Conservation and Recycling. 154: 104605 |
Chan J, Bachmann C, Haas C. (2020) Potential economic and energy impacts of substituting adaptive reuse for new building construction: A case study of Ontario Journal of Cleaner Production. 259: 120939 |
Ryu J, McFarland T, Banting B, et al. (2020) Health and productivity impact of semi-automated work systems in construction Automation in Construction. 120: 103396 |
Eray E, Sanchez B, Haas C. (2019) Usage of Interface Management System in Adaptive Reuse of Buildings Buildings. 9: 105 |