Hamed Samarghandi, Ph.D.
Affiliations: | 2013 | Mechanical and Manufacturing Engineering | University of Manitoba, Winnipeg, Manitoba, Canada |
Area:
Plastics Technology, Industrial Engineering, Mechanical EngineeringGoogle:
"Hamed Samarghandi"Parents
Sign in to add mentorTarek ElMekkawy | grad student | 2013 | University of Manitoba | |
(Scheduling optimization of manufacturing systems with no-wait constraints.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Samarghandi H. (2019) Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach Computers & Industrial Engineering. 136: 635-662 |
Samarghandi H. (2019) Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints Computers & Industrial Engineering. 136: 614-634 |
Samarghandi H, Behroozi M. (2017) On the exact solution of the no-wait flow shop problem with due date constraints Computers & Operations Research. 81: 141-159 |
Samarghandi H, Behroozi M. (2016) An Enumeration Algorithm for the No-Wait Flow Shop Problem with Due Date Constraints Ifac-Papersonline. 49: 1803-1808 |
Samarghandi H. (2015) A particle swarm optimisation for the no-wait flow shop problem with due date constraints International Journal of Production Research. 53: 2853-2870 |
Samarghandi H. (2015) Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times International Journal of Production Research. 53: 2652-2673 |
Samarghandi H. (2015) A no-wait flow shop system with sequence dependent setup times and server constraints Ifac-Papersonline. 48: 1604-1609 |
Samarghandi H, Elmekkawy TY. (2014) Solving the no-wait flow-shop problem with sequence-dependent set-up times International Journal of Computer Integrated Manufacturing. 27: 213-228 |
Samarghandi H, Elmekkawy TY, Ibrahem AMM. (2013) Studying the effect of different combinations of timetabling with sequencing algorithms to solve the no-wait job shop scheduling problem International Journal of Production Research. 51: 4942-4965 |
Samarghandi H, Taabayan P, Behroozi M. (2013) Metaheuristics for fuzzy dynamic facility layout problem with unequal area constraints and closeness ratings International Journal of Advanced Manufacturing Technology. 67: 2701-2715 |