Hamed Samarghandi, Ph.D.

Affiliations: 
2013 Mechanical and Manufacturing Engineering University of Manitoba, Winnipeg, Manitoba, Canada 
Area:
Plastics Technology, Industrial Engineering, Mechanical Engineering
Google:
"Hamed Samarghandi"

Parents

Sign in to add mentor
Tarek ElMekkawy grad student 2013 University of Manitoba
 (Scheduling optimization of manufacturing systems with no-wait constraints.)
BETA: Related publications

Publications

You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect.

Samarghandi H. (2019) Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach Computers & Industrial Engineering. 136: 635-662
Samarghandi H. (2019) Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints Computers & Industrial Engineering. 136: 614-634
Samarghandi H, Behroozi M. (2017) On the exact solution of the no-wait flow shop problem with due date constraints Computers & Operations Research. 81: 141-159
Samarghandi H, Behroozi M. (2016) An Enumeration Algorithm for the No-Wait Flow Shop Problem with Due Date Constraints Ifac-Papersonline. 49: 1803-1808
Samarghandi H. (2015) A particle swarm optimisation for the no-wait flow shop problem with due date constraints International Journal of Production Research. 53: 2853-2870
Samarghandi H. (2015) Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times International Journal of Production Research. 53: 2652-2673
Samarghandi H. (2015) A no-wait flow shop system with sequence dependent setup times and server constraints Ifac-Papersonline. 48: 1604-1609
Samarghandi H, Elmekkawy TY. (2014) Solving the no-wait flow-shop problem with sequence-dependent set-up times International Journal of Computer Integrated Manufacturing. 27: 213-228
Samarghandi H, Elmekkawy TY, Ibrahem AMM. (2013) Studying the effect of different combinations of timetabling with sequencing algorithms to solve the no-wait job shop scheduling problem International Journal of Production Research. 51: 4942-4965
Samarghandi H, Taabayan P, Behroozi M. (2013) Metaheuristics for fuzzy dynamic facility layout problem with unequal area constraints and closeness ratings International Journal of Advanced Manufacturing Technology. 67: 2701-2715
See more...