Awad S. Hanna
Affiliations: | University of Wisconsin, Madison, Madison, WI |
Area:
Civil Engineering, Industrial Engineering, Artificial IntelligenceWebsite:
https://directory.engr.wisc.edu/cee/Faculty/Hanna_Awad/Google:
"Awad Hanna"Bio:
https://www.proquest.com/openview/07bd7fbbbf965784ec07dd72a1d515be/1
Parents
Sign in to add mentorVictor E. Sanvido | grad student | 1989 | Penn State | |
(An interactive knowledge-based formwork selection system for buildings) |
Children
Sign in to add traineeAbdurahman I. Ammar | grad student | 2001 | UW Madison |
Murat Gunduz | grad student | 2002 | UW Madison |
Min-Jae Lee | grad student | 2002 | UW Madison |
Chul-Ki Chang | grad student | 2004 | UW Madison |
Cindy L. Menches | grad student | 2006 | UW Madison |
Mounir El Asmar | grad student | 2012 | UW Madison |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Ibrahim MW, Labib Y, Veeramani D, et al. (2021) Comprehensive Model for Construction Readiness Assessment Journal of Management in Engineering. 37: 4020088 |
Ibrahim MW, Hanna A, Kievet D. (2020) Quantitative Comparison of Project Performance between Project Delivery Systems Journal of Management in Engineering. 36: 4020082 |
Ibrahim MW, Hanna AS, Russell JS, et al. (2020) Comprehensive Analysis of Factors Associated with Out-of-Sequence Construction Journal of Management in Engineering. 36: 4020031 |
Abotaleb IS, El-adaway IH, Ibrahim MW, et al. (2020) Developing a Rating Score for Out-of-Sequence Construction Journal of Management in Engineering. 36: 4020013 |
Ibrahim MW, Hanna AS, Russell JS, et al. (2020) Quantitative Analysis of the Impacts of Out-of-Sequence Work on Project Performance Journal of Construction Engineering and Management-Asce. 146: 4020090 |
Rezk S, Whited GC, Ibrahim M, et al. (2019) Competency Assessment for State Highway Agency Project Managers Transportation Research Record. 2673: 658-666 |
Iskandar KA, Hanna AS, Lotfallah W. (2019) Modeling the performance of healthcare construction projects Engineering, Construction and Architectural Management. 26: 2023-2039 |
Hanna AS, Iskandar KA, Lotfallah W. (2019) Benchmarking project performance: a guideline for assessing vulnerability of mechanical and electrical projects to productivity loss Construction Management and Economics. 37: 101-111 |
Abotaleb IS, El-adaway IH, Ibrahim MW, et al. (2019) Causes, Early Warning Signs, and Impacts of Out-of-Sequence Construction: Expert-Based Survey Analysis Journal of Management in Engineering. 35: 4019030 |
Chang C, Hanna AS, Woo S, et al. (2019) Logistic Regression Modeling to Determine Projects impacted by Schedule Compression Ksce Journal of Civil Engineering. 23: 1493-1500 |