Eric Blanco
Affiliations: | Grenoble INPG |
Area:
Base of the Pyramide (BOP), Scenarios, Requirement, International and ‘scattered context’, Information and Knowledge Management, Global collaboration, Multi-agents systems, Decentralized control, LMI optimization, PLL network designGoogle:
"Eric Blanco"Children
Sign in to add traineeTetsu Koike | grad student | 2005 | Grenoble INPG |
Khadidja Grebici | grad student | 2007 | Grenoble INPG |
Nicolas Veyrat | grad student | 2008 | Université Pierre Mendès France (Grenoble) |
Charlotte Wieder | grad student | 2009 | Grenoble INPG |
Emine Serap Arikoglu | grad student | 2011 | Grenoble University |
Anton Korniienko | grad student | 2011 | Ecully, Ecole centrale de Lyon |
Benoît Bayon | grad student | 2012 | Ecully, Ecole centrale de Lyon |
Marie Fraslin | grad student | 2013 | Grenoble University |
Chloé Lecomte | grad student | 2014 | Grenoble University |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Lalevée A, Troussier N, Blanco É, et al. (2020) The interest of an evolution of value management methodology in complex technical projects for improving project management Procedia Cirp. 90: 411-415 |
Laing C, David P, Blanco E, et al. (2020) Questioning integration of verification in model-based systems engineering: an industrial perspective⋆ Computers in Industry. 114: 103163 |
Salmi A, David P, Blanco E, et al. (2018) A cost estimation model to support automation decision in assembly systems design International Journal of Production Research. 56: 7426-7443 |
Mokammel F, Coatanéa E, Coatanéa J, et al. (2018) Automatic requirements extraction, analysis, and graph representation using an approach derived from computational linguistics Systems Engineering. 21: 555-575 |
Salmi A, David P, Blanco E, et al. (2016) A review of cost estimation models for determining assembly automation level Computers & Industrial Engineering. 98: 246-259 |
Salmi A, David P, Blanco E, et al. (2015) Assembly modelling and time estimating during the early phase of assembly systems design Ifac Proceedings Volumes (Ifac-Papersonline). 48: 81-87 |
Surbier L, Alpan G, Blanco E. (2010) Interface modeling and analysis during production ramp-up Cirp Journal of Manufacturing Science and Technology. 2: 247-254 |
Veyrat N, Blanco E, Trompette P. (2008) Social Embodiment of Technical Devices: Eyeglasses Over the Centuries and According to their Uses Mind, Culture, and Activity. 15: 185-207 |
Veyrat N, Blanco E, Trompette P. (2007) L'objet incorporé et la logique des situations (Les lunettes au fil de l'histoire et au gré des usages) Revue D'Anthropologie Des Connaissances. 59-83 |
Blanco E, Grebici K, Rieu D. (2007) A unified framework to manage information maturity in design process International Journal of Product Development. 4: 255-279 |