Murat C. Testik, Ph.D.

Affiliations: 
2003 Arizona State University, Tempe, AZ, United States 
Area:
Industrial Engineering
Google:
"Murat Testik"

Parents

Sign in to add mentor
Jeffery K. Cochran grad student 2003 Arizona State (E-Tree)
 (Univariate and multivariate statistical process control: A generalized likelihood ratio approach.)
George C. Runger grad student 2003 Arizona State
 (Univariate and multivariate statistical process control: A generalized likelihood ratio approach.)
BETA: Related publications

Publications

You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect.

Weiß CH, Testik MC, Homburg A. (2021) On the design of Shewhart control charts for count time series under estimation uncertainty Computers & Industrial Engineering. 157: 107331
Atalay M, Testik MC, Duran S, et al. (2020) Guidelines for automating Phase I of control charts by considering effects on Phase-II performance of individuals control chart Quality Engineering. 32: 223-243
Testik MC, Kara O, Knoth S. (2020) An algorithmic approach to outlier detection and parameter estimation in Phase I for designing Phase II EWMA control chart Computers & Industrial Engineering. 144: 106440
Weiß CH, Testik MC. (2019) Risk‐based metrics for performance evaluation of control charts Quality and Reliability Engineering International. 35: 280-291
Weiß CH, Steuer D, Jentsch C, et al. (2018) Guaranteed conditional ARL performance in the presence of autocorrelation Computational Statistics & Data Analysis. 128: 367-379
Sonmez V, Testik MC, Testik OM. (2018) Overall equipment effectiveness when production speeds and stoppage durations are uncertain The International Journal of Advanced Manufacturing Technology. 95: 121-130
Testik MC, Weiß CH, Koca Y, et al. (2018) Effectiveness of phase I applications for identifying randomly scattered out‐of‐control observations and estimating control chart parameters Quality and Reliability Engineering International. 34: 78-92
Dasdemir E, Weiß C, Testik MC, et al. (2016) Evaluation of Phase I analysis scenarios on Phase II performance of control charts for autocorrelated observations Quality Engineering. 28: 293-304
Weiß CH, Testik MC. (2015) On the Phase i analysis for monitoring time-dependent count processes Iie Transactions (Institute of Industrial Engineers). 47: 294-306
Weiß CH, Testik MC. (2015) Residuals-Based CUSUM Charts for Poisson INAR(1) Processes Journal of Quality Technology. 47: 30-42
See more...