Murat C. Testik, Ph.D.
Affiliations: | 2003 | Arizona State University, Tempe, AZ, United States |
Area:
Industrial EngineeringGoogle:
"Murat Testik"Parents
Sign in to add mentorJeffery K. Cochran | grad student | 2003 | Arizona State (E-Tree) | |
(Univariate and multivariate statistical process control: A generalized likelihood ratio approach.) | ||||
George C. Runger | grad student | 2003 | Arizona State | |
(Univariate and multivariate statistical process control: A generalized likelihood ratio approach.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Weiß CH, Testik MC, Homburg A. (2021) On the design of Shewhart control charts for count time series under estimation uncertainty Computers & Industrial Engineering. 157: 107331 |
Atalay M, Testik MC, Duran S, et al. (2020) Guidelines for automating Phase I of control charts by considering effects on Phase-II performance of individuals control chart Quality Engineering. 32: 223-243 |
Testik MC, Kara O, Knoth S. (2020) An algorithmic approach to outlier detection and parameter estimation in Phase I for designing Phase II EWMA control chart Computers & Industrial Engineering. 144: 106440 |
Weiß CH, Testik MC. (2019) Risk‐based metrics for performance evaluation of control charts Quality and Reliability Engineering International. 35: 280-291 |
Weiß CH, Steuer D, Jentsch C, et al. (2018) Guaranteed conditional ARL performance in the presence of autocorrelation Computational Statistics & Data Analysis. 128: 367-379 |
Sonmez V, Testik MC, Testik OM. (2018) Overall equipment effectiveness when production speeds and stoppage durations are uncertain The International Journal of Advanced Manufacturing Technology. 95: 121-130 |
Testik MC, Weiß CH, Koca Y, et al. (2018) Effectiveness of phase I applications for identifying randomly scattered out‐of‐control observations and estimating control chart parameters Quality and Reliability Engineering International. 34: 78-92 |
Dasdemir E, Weiß C, Testik MC, et al. (2016) Evaluation of Phase I analysis scenarios on Phase II performance of control charts for autocorrelated observations Quality Engineering. 28: 293-304 |
Weiß CH, Testik MC. (2015) On the Phase i analysis for monitoring time-dependent count processes Iie Transactions (Institute of Industrial Engineers). 47: 294-306 |
Weiß CH, Testik MC. (2015) Residuals-Based CUSUM Charts for Poisson INAR(1) Processes Journal of Quality Technology. 47: 30-42 |