Year |
Citation |
Score |
2019 |
Chou J, Cheng M, Hsieh Y, Yang I, Hsu H. Optimal path planning in real time for dynamic building fire rescue operations using wireless sensors and visual guidance Automation in Construction. 99: 1-17. DOI: 10.1016/J.Autcon.2018.11.020 |
0.342 |
|
2017 |
Cheng M, Chiu K, Hsieh Y, Yang I, Chou J, Wu Y. BIM integrated smart monitoring technique for building fire prevention and disaster relief Automation in Construction. 84: 14-30. DOI: 10.1016/J.Autcon.2017.08.027 |
0.317 |
|
2016 |
Lin YC, Lee HY, Yang IT. Developing as-built BIM model process management system for general contractors: A case study Journal of Civil Engineering and Management. 22: 608-621. DOI: 10.3846/13923730.2014.914081 |
0.358 |
|
2016 |
Ioannou PG, Yang IT. Repetitive Scheduling Method: Requirements, Modeling, and Implementation Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001107 |
0.639 |
|
2016 |
Yang IT, Hsieh YH, Kuo CG. Integrated multiobjective framework for reliability-based design optimization with discrete design variables Automation in Construction. 63: 162-172. DOI: 10.1016/J.Autcon.2015.12.010 |
0.356 |
|
2014 |
Yang I, Lin Y, Lee H. Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off Journal of Construction Engineering and Management-Asce. 140: 4013036-4013036. DOI: 10.1061/(Asce)Co.1943-7862.0000784 |
0.42 |
|
2013 |
Wang W, Yu W, Yang I, Lin C, Lee M, Cheng Y. Applying the AHP to support the best-value contractor selection-lessons learned from two case studies in Taiwan Journal of Civil Engineering and Management. 19: 24-36. DOI: 10.3846/13923730.2012.734851 |
0.351 |
|
2013 |
Yang I, Hsieh Y. Reliability-based design optimization with cooperation between support vector machine and particle swarm optimization Engineering With Computers. 29: 151-163. DOI: 10.1007/S00366-011-0251-9 |
0.342 |
|
2012 |
Yang IT, Hsieh YM, Kung LO. Parallel computing platform for multiobjective simulation optimization of bridge maintenance planning Journal of Construction Engineering and Management. 138: 215-226. DOI: 10.1061/(Asce)Co.1943-7862.0000421 |
0.437 |
|
2012 |
Lee H, Yang I, Lin Y. Laying out the occupant flows in public buildings for operating efficiency Building and Environment. 51: 231-242. DOI: 10.1016/J.Buildenv.2011.11.005 |
0.308 |
|
2012 |
Yang IT, Wang WC, Yang TI. Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy process Automation in Construction. 22: 290-297. DOI: 10.1016/J.Autcon.2011.09.004 |
0.337 |
|
2011 |
Yang IT. Stochastic time-cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance Automation in Construction. 20: 916-926. DOI: 10.1016/J.Autcon.2011.03.008 |
0.438 |
|
2011 |
Yang I, Hsieh Y. Reliability-based design optimization with discrete design variables and non-smooth performance functions: AB-PSO algorithm Automation in Construction. 20: 610-619. DOI: 10.1016/J.Autcon.2010.12.003 |
0.395 |
|
2011 |
Yang I, Chou J. Multiobjective optimization for manpower assignment in consulting engineering firms Applied Soft Computing. 11: 1183-1190. DOI: 10.1016/J.Asoc.2010.02.016 |
0.419 |
|
2009 |
Hsie M, Chang C, Yang I, Huang C. Resource-constrained scheduling for continuous repetitive projects with time-based production units Automation in Construction. 18: 942-949. DOI: 10.1016/J.Autcon.2009.04.006 |
0.458 |
|
2009 |
Chou JS, Yang IT, Chong WK. Probabilistic simulation for developing likelihood distribution of engineering project cost Automation in Construction. 18: 570-577. DOI: 10.1016/J.Autcon.2008.12.001 |
0.423 |
|
2008 |
Yang IT. Distribution-free Monte Carlo simulation: Premise and refinement Journal of Construction Engineering and Management. 134: 352-360. DOI: 10.1061/(Asce)0733-9364(2008)134:5(352) |
0.348 |
|
2007 |
Yang IT. Risk modeling of dependence among project task durations Computer-Aided Civil and Infrastructure Engineering. 22: 419-429. DOI: 10.1111/J.1467-8667.2007.00497.X |
0.423 |
|
2007 |
Yang IT. Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis Journal of Construction Engineering and Management. 133: 498-505. DOI: 10.1061/(Asce)0733-9364(2007)133:7(498) |
0.427 |
|
2007 |
Yang IT. Performing complex project crashing analysis with aid of particle swarm optimization algorithm International Journal of Project Management. 25: 637-646. DOI: 10.1016/J.Ijproman.2006.11.001 |
0.504 |
|
2006 |
Yang IT. Using Gaussian copula to simulate repetitive projects Construction Management and Economics. 24: 901-909. DOI: 10.1080/01446190600658784 |
0.384 |
|
2005 |
Yang IT. Impact of budget uncertainty on project time-cost tradeoff Ieee Transactions On Engineering Management. 52: 167-174. DOI: 10.1109/Tem.2005.844924 |
0.443 |
|
2005 |
Yang IT. Chance-constrained time-cost tradeoff analysis considering funding variability Journal of Construction Engineering and Management. 131: 1002-1012. DOI: 10.1061/(Asce)0733-9364(2005)131:9(1002) |
0.405 |
|
2005 |
Yang I, Chang C. Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding International Journal of Project Management. 23: 546-553. DOI: 10.1016/J.Ijproman.2005.03.003 |
0.461 |
|
2004 |
Yang IT, Ioannou PG. Scheduling system with focus on practical concerns in repetitive projects Construction Management and Economics. 22: 619-630. DOI: 10.1080/01446190310001649065 |
0.649 |
|
2003 |
Ioannou PG, Harris RB, Yang IT, Ammar MA, Elbeltagi E. Discussion of "algorithm for determining controlling path considering resource continuity" by Mohammed A. Ammar and Emad Elbeltagi Journal of Computing in Civil Engineering. 17: 68-73. DOI: 10.1061/(Asce)0887-3801(2003)17:1(68) |
0.582 |
|
Show low-probability matches. |