Year |
Citation |
Score |
2020 |
Fu Y, Zhu X, Ma X. Optimum component reallocation and system replacement maintenance for a used system with increasing minimal repair cost Reliability Engineering & System Safety. 204: 107137. DOI: 10.1016/J.Ress.2020.107137 |
0.308 |
|
2020 |
Wang J, Zhu X. Joint optimization of condition-based maintenance and inventory control for a k-out-of-n:F system of multi-state degrading components European Journal of Operational Research. DOI: 10.1016/J.Ejor.2020.08.016 |
0.349 |
|
2020 |
Yousefi N, Coit DW, Zhu X. Dynamic maintenance policy for systems with repairable components subject to mutually dependent competing failure processes Computers & Industrial Engineering. 143: 106398. DOI: 10.1016/J.Cie.2020.106398 |
0.305 |
|
2019 |
Fu Y, Yuan T, Zhu X. Optimum Periodic Component Reallocation and System Replacement Maintenance Ieee Transactions On Reliability. 68: 753-763. DOI: 10.1109/Tr.2018.2874187 |
0.313 |
|
2019 |
Zhu X, Wang J, Yuan T. Design and maintenance for the data storage system considering system rebuilding process Reliability Engineering & System Safety. 191: 106576. DOI: 10.1016/J.Ress.2019.106576 |
0.33 |
|
2019 |
Fu Y, Yuan T, Zhu X. Importance-measure based methods for component reassignment problem of degrading components Reliability Engineering & System Safety. 190: 106501. DOI: 10.1016/J.Ress.2019.106501 |
0.36 |
|
2019 |
Bei X, Zhu X, Coit DW. A risk-averse stochastic program for integrated system design and preventive maintenance planning European Journal of Operational Research. 276: 536-548. DOI: 10.1016/J.Ejor.2019.01.038 |
0.328 |
|
2018 |
Zhu X, Bei X, Chatwattanasiri N, Coit DW. Optimal System Design and Sequential Preventive Maintenance Under Uncertain Aperiodic-Changing Stresses Ieee Transactions On Reliability. 67: 907-919. DOI: 10.1109/Tr.2018.2798298 |
0.333 |
|
2018 |
Jiao C, Zhu X. Optimal design of sales and maintenance under the renewable warranty Rairo-Operations Research. 52: 529-542. DOI: 10.1051/Ro/2017077 |
0.307 |
|
2017 |
Bei X, Chatwattanasiri N, Coit DW, Zhu X. Combined Redundancy Allocation and Maintenance Planning Using a Two-Stage Stochastic Programming Model for Multiple Component Systems Ieee Transactions On Reliability. 66: 950-962. DOI: 10.1109/Tr.2017.2715172 |
0.359 |
|
2017 |
Zhu X, Fu Y, Yuan T, Wu X. Birnbaum importance based heuristics for multi-type component assignment problems Reliability Engineering & System Safety. 165: 209-221. DOI: 10.1016/J.Ress.2017.04.018 |
0.345 |
|
2014 |
Xie W, Liao H, Zhu X. Estimation of gross profit for a new durable product considering warranty and post-warranty repairs Iie Transactions. 46: 87-105. DOI: 10.1080/0740817X.2012.761370 |
0.304 |
|
2014 |
Zhu X, Garcia-Diaz A, Jin M, Zhang Y. Vehicle fuel consumption minimization in routing over-dimensioned and overweight trucks in capacitated transportation networks Journal of Cleaner Production. 85: 331-336. DOI: 10.1016/J.Jclepro.2013.10.036 |
0.305 |
|
2014 |
Yao Q, Zhu X, Kuo W. A Birnbaum-importance based genetic local search algorithm for component assignment problems Annals of Operations Research. 212: 185-200. DOI: 10.1007/S10479-012-1223-1 |
0.325 |
|
2014 |
Zhu X, Kuo W. Importance measures in reliability and mathematical programming Annals of Operations Research. 212: 241-267. DOI: 10.1007/S10479-012-1127-0 |
0.311 |
|
2013 |
Zhu X, Wilhelm WE. Implementation of a three-stage approach for the dynamic resource-constrained shortest-path sub-problem in branch-and-price Computers and Operations Research. 40: 385-394. DOI: 10.1016/J.Cor.2012.07.007 |
0.595 |
|
2012 |
Zhu X, Wilhelm WE. A three-stage approach for the resource-constrained shortest path as a sub-problem in column generation Computers and Operations Research. 39: 164-178. DOI: 10.1016/J.Cor.2011.03.008 |
0.588 |
|
2011 |
Zhu X, Li X, Yao Q, Chen Y. Challenges and models in supporting logistics system design for dedicated-biomass-based bioenergy industry. Bioresource Technology. 102: 1344-51. PMID 20863690 DOI: 10.1016/J.Biortech.2010.08.122 |
0.302 |
|
2011 |
Yao Q, Zhu X, Kuo W. Heuristics for component assignment problems based on the Birnbaum importance Iie Transactions. 43: 633-646. DOI: 10.1080/0740817X.2010.532856 |
0.371 |
|
2011 |
Li X, Zhao Z, Zhu X, Wyatt T. Covering models and optimization techniques for emergency response facility location and planning: a review Mathematical Methods of Operations Research. 74: 281-310. DOI: 10.1007/S00186-011-0363-4 |
0.335 |
|
2009 |
Wilhelm WE, Zhu X. Enabling flexibility on a dual head placement machine by optimizing platform-tray-feeder picking operations Flexible Services and Manufacturing Journal. 21: 1-30. DOI: 10.1007/S10696-010-9059-Y |
0.57 |
|
2007 |
Zhu X, Wilhelm WE. Three-stage approaches for optimizing some variations of the resource constrained shortest-path sub-problem in a column generation context European Journal of Operational Research. 183: 564-577. DOI: 10.1016/J.Ejor.2006.10.012 |
0.591 |
|
Show low-probability matches. |