Year |
Citation |
Score |
2019 |
Roslin EN, Ahmed S, Ahamat MA, Bahrom MZ, Ibrahim N. The Impact of Employee Involvement and Empowerment in Lean Manufacturing System Implementation towards Organizational Performances International Journal On Advanced Science, Engineering and Information Technology. 9: 188-193. DOI: 10.18517/Ijaseit.9.1.7116 |
0.373 |
|
2018 |
Roslin EN, Ahmed S, Dawal SZM, Othman J, Ahamat MA, Zain NM. A Full-Blown Concept of Lean Manufacturing System in Automotive Industry Journal of Industrial and Intelligent Information. 14-22. DOI: 10.18178/Jiii.6.1.14-22 |
0.312 |
|
2016 |
Ahmed S, Shumon MRH, Falatoonitoosi E, Quader MA. A comparative decision-making model for sustainable end-of-life vehicle management alternative selection using AHP and extent analysis method on fuzzy AHP International Journal of Sustainable Development and World Ecology. 23: 83-97. DOI: 10.1080/13504509.2015.1062814 |
0.359 |
|
2016 |
Quader MA, Ahmed S, Raja Ghazilla RA, Dahari M. Evaluation of criteria for CO2 capture and storage in the iron and steel industry using the 2-tuple DEMATEL technique Journal of Cleaner Production. 120: 207-220. DOI: 10.1016/J.Jclepro.2015.10.056 |
0.326 |
|
2016 |
Ahmed S, Shumon MRH, Quader MA, Cho HM, Mahmud MI. Prioritizing Strategies for Sustainable End-of-Life Vehicle Management Using Combinatorial Multi-Criteria Decision Making Method International Journal of Fuzzy Systems. 18: 448-462. DOI: 10.1007/S40815-015-0061-0 |
0.324 |
|
2016 |
Quader MA, Ahmed S. A Hybrid Fuzzy MCDM Approach to Identify Critical Factors and CO2 Capture Technology for Sustainable Iron and Steel Manufacturing Arabian Journal For Science and Engineering. 41: 4411-4430. DOI: 10.1007/S13369-016-2134-2 |
0.31 |
|
2015 |
Mirmohammadsadeghi S, Ahmed S. Metaheuristic Approaches for Solving Truck and Trailer Routing Problems with Stochastic Demands: A Case Study in Dairy Industry Mathematical Problems in Engineering. 2015: 1-14. DOI: 10.1155/2015/494019 |
0.314 |
|
2015 |
Mirmohammadsadeghi S, Ahmed S. Memetic Heuristic Approach for Solving Truck and Trailer Routing Problems with Stochastic Demands and Time Windows Networks and Spatial Economics. 15: 1093-1115. DOI: 10.1007/S11067-014-9282-2 |
0.323 |
|
2014 |
Falatoonitoosi E, Ahmed S, Sorooshian S. Expanded DEMATEL for determining cause and effect group in bidirectional relations. Thescientificworldjournal. 2014: 103846. PMID 24693224 DOI: 10.1155/2014/103846 |
0.301 |
|
2014 |
Falatoonitoosi E, Ahmed S, Sorooshian S. A multicriteria framework to evaluate supplier's greenness Abstract and Applied Analysis. 2014. DOI: 10.1155/2014/396923 |
0.342 |
|
2014 |
Ariafar S, Ahmed S, Choudhury IA, Bakar MA. Application of fuzzy optimization to production-distribution planning in supply chain management Mathematical Problems in Engineering. 2014. DOI: 10.1155/2014/218132 |
0.395 |
|
2014 |
Shumon MRH, Ahmed S, Islam MT. Electronic waste: present status and future perspectives of sustainable management practices in Malaysia Environmental Earth Sciences. 72: 2239-2249. DOI: 10.1007/S12665-014-3129-5 |
0.329 |
|
2012 |
Ebrahim NA, Ahmed S, Rashid SHA, Taha Z. Effective Virtual Teams for New Product Development Scientific Research and Essays. 7: 1971-1985. DOI: 10.5897/Sre10.1005 |
0.611 |
|
2012 |
Ebrahim NA, Ahmed S, Rashid SHA, Wazed MA, Taha Z. Virtual collaborative R&D teams in Malaysia manufacturing SMEs Advanced Materials Research. 433: 1653-1659. DOI: 10.4028/Www.Scientific.Net/Amr.433-440.1653 |
0.631 |
|
2012 |
Wazed MA, Ahmed S, Nukman Y, Ale Ebrahim N. Models for component commonality in multistage production Applied Mechanics and Materials. 110: 258-266. DOI: 10.4028/Www.Scientific.Net/Amm.110-116.258 |
0.726 |
|
2012 |
Ebrahim NA, Ahmed S, Rashid SHA, Taha Z. Technology Use in the Virtual R&D Teams American Journal of Engineering and Applied Sciences. 5: 9-14. DOI: 10.3844/Ajeassp.2012.9.14 |
0.622 |
|
2012 |
Amindoust A, Ahmed S, Saghafinia A. Supplier selection and performance evaluation of telecommunication company American Journal of Engineering and Applied Sciences. 5: 49-52. DOI: 10.3844/Ajeassp.2012.49.52 |
0.331 |
|
2011 |
Ale Ebrahim N, Abdul Rashid SH, Ahmed S, Taha Z. The Effectiveness of Virtual R&D Teams in SMEs: Experiences of Malaysian SMEs Industrial Engineering and Management Systems. 10: 109-114. DOI: 10.7232/Iems.2011.10.2.109 |
0.733 |
|
2011 |
Wazed MA, Ahmed S, Nukman Y. A Review of Manufacturing Resources Planning Models Under Different Uncertainties: State-of-The-Art and Future Directions South African Journal of Industrial Engineering. 21: 17-34. DOI: 10.7166/21-1-63 |
0.401 |
|
2011 |
Wazed MA, Ahmed S, Nukman Y. Mathematical models for component commonality under quality and resources breakdown in multistage production International Journal of Physical Sciences. 6: 5202-5222. DOI: 10.5897/Ijps10.543 |
0.426 |
|
2011 |
Mohammadjafari M, Ahmed S, Dawal SZM, Zay H, ehroodi. The importance of project management in small- and medium-sized enterprises (SMEs) for the development of new products through E-collaboration African Journal of Business Management. 5: 11844-11855. DOI: 10.5897/Ajbm10.1265 |
0.401 |
|
2011 |
Wazed MA, Ahmed S, Nukman YB. Mathematical models for process commonality under quality and resources breakdown in multistage production Journal of Zhejiang University Science. 12: 837-848. DOI: 10.1631/Jzus.A1000477 |
0.42 |
|
2011 |
Wazed MA, Ahmed S, Nukman Y. Application of Taguchi method to analyse the impacts of common process and batch size in multistage production system under uncertain conditions European Journal of Industrial Engineering. 5: 215-231. DOI: 10.1504/Ejie.2011.039873 |
0.393 |
|
2011 |
Mohammadjafari M, Ahmed S, Dawal SZM, Zayandehroodi H. Reducing Time and Cost of New Product Development in SMEs by E-Collaboration Through Project Management Approach Advanced Science Letters. 4: 2513-2516. DOI: 10.1166/Asl.2011.1540 |
0.342 |
|
2011 |
Ahmed S. Application of Taguchi Method to analyze the impacts of commonality in multistage production under uncertainty Advanced Science Letters. 4: 415-423. DOI: 10.1166/Asl.2011.1239 |
0.415 |
|
2011 |
Ahmed S, Taha Z. Virtual R&D teams: A potential growth of education-industry collaboration Academic Leadership. 9. DOI: 10.1109/Iceed.2010.5940754 |
0.578 |
|
2010 |
Ebrahim NA, Ahmed S, Taha Z. SMEs; Virtual research and development (R&D) teams and new product development: A literature review International Journal of Physical Sciences. 5: 916-930. DOI: 10.6084/M9.Figshare.104523 |
0.614 |
|
2010 |
Wazed MA, Ahmed S, Yusoff N. Impacts of common processes in multistage production system under machine breakdown and quality uncertainties African Journal of Business Management. 4: 979-986. DOI: 10.5897/Ajbm.9000339 |
0.403 |
|
2010 |
Ebrahim NA, Ahmed S, Taha Z. Critical Factors for New Product Developments in SMEs Virtual Team African Journal of Business Management. 4: 2247-2257. DOI: 10.5897/Ajbm.9000166 |
0.62 |
|
2010 |
Wazed MA, Ahmed S, Nukman Y. Component and process commonalities in production system under various uncertain factors African Journal of Business Management. 4: 3697-3707. DOI: 10.5897/Ajbm.9000143 |
0.402 |
|
2010 |
Wazed MA, Ahmed S, Nukman Y. Commonality in Manufacturing Resources Planning - Issues and Models: A Review European Journal of Industrial Engineering. 4: 167-188. DOI: 10.1504/Ejie.2010.031076 |
0.422 |
|
2010 |
Ahmed S, Amagoh F. Application of QFD in product development of a glass manufacturing company in Kazakhstan Benchmarking: An International Journal. 17: 195-213. DOI: 10.1108/14635771011036302 |
0.419 |
|
2009 |
Ebrahim NA, Ahmed S, Taha Z. Virtual teams: A literature review Australian Journal of Basic and Applied Sciences. 3: 2653-2669. DOI: 10.5281/Zenodo.10632 |
0.601 |
|
2009 |
Wazed MA, Ahmed S, Nukman Y. Commonality and its Measurement in Manufacturing Resources Planning Journal of Applied Sciences. 9: 69-78. DOI: 10.3923/Jas.2009.69.78 |
0.407 |
|
2009 |
Ebrahim NA, Ahmed S, Taha Z. SMEs and virtual R&D teams: A motive channel for relationship between SMEs International Conference For Technical Postgraduates 2009, Techpos 2009. DOI: 10.1109/TECHPOS.2009.5412112 |
0.497 |
|
2009 |
Ahmed S. Supply chain planning for water distribution in Central Asia Industrial Management and Data Systems. 109: 53-73. DOI: 10.1108/02635570910926591 |
0.308 |
|
2005 |
Ahmed S, Mohiuddin AKM. The Successful Implementation of TPM in Conjunction with EOM and 5S: A Case Presentation Journal of Applied Sciences. 5: 938-951. DOI: 10.3923/Jas.2005.938.951 |
0.398 |
|
2005 |
Ahmed S, Hassan MH, Fen YH. Performance Measurement and Evaluation in an Innovative Modern Manufacturing System Journal of Applied Sciences. 5: 385-401. DOI: 10.3923/Jas.2005.385.401 |
0.41 |
|
2005 |
Ahmed S, Hassan MH, Taha Z. TPM can go beyond maintenance: Excerpt from a case implementation Journal of Quality in Maintenance Engineering. 11: 19-42. DOI: 10.1108/13552510510589352 |
0.615 |
|
2004 |
Ahmed S, Hassan MH, Taha Z. State of implementation of TPM in SMIs: A survey study in Malaysia Journal of Quality in Maintenance Engineering. 10: 93-106. DOI: 10.1108/13552510410539178 |
0.608 |
|
2003 |
Ahmed S, Hassan M. Survey and case investigations on application of quality management tools and techniques in SMIs International Journal of Quality & Reliability Management. 20: 795-826. DOI: 10.1108/02656710310491221 |
0.336 |
|
Show low-probability matches. |