Year |
Citation |
Score |
2017 |
Li Z, Dao H, Patel H, Liu Y, Zhou B. Incorporating Traffic Control and Safety Hardware Performance Functions into Risk-based Highway Safety Analysis Promet-Traffic & Transportation. 29: 143-153. DOI: 10.7307/Ptt.V29I2.2041 |
0.318 |
|
2016 |
Liu Y, Li Z, Liu J, Patel H. Vehicular crash data used to rank intersections by injury crash frequency and severity. Data in Brief. 8: 930-3. PMID 27508245 DOI: 10.1016/J.Dib.2016.06.046 |
0.314 |
|
2016 |
Roshandeh AM, Li Z, Zhang S, Levinson HS, Lu X. Vehicle and pedestrian safety impacts of signal timing optimization in a dense urban street network Journal of Traffic and Transportation Engineering. 3: 16-27. DOI: 10.1016/J.Jtte.2016.01.001 |
0.312 |
|
2016 |
Xu L, Li ZF, Chao J, Li YX, Ge HL, Bai QJ. Dielectric anomalies and compositional inhomogeneity of (K,Na,Li)NbO3 ceramics Journal of Alloys and Compounds. 678: 147-152. DOI: 10.1016/j.jallcom.2016.03.278 |
0.442 |
|
2015 |
Bai Q, Ahmed A, Li Z, Labi S. A hybrid pareto frontier generation method for trade-off analysis in transportation asset management Computer-Aided Civil and Infrastructure Engineering. 30: 163-180. DOI: 10.1111/Mice.12079 |
0.703 |
|
2015 |
Roshandeh AM, Li Z, Neishapouri M, Patel H, Liu Y. Trade-off analysis approach for multiobjective transportation investment decision making Journal of Transportation Engineering. 141. DOI: 10.1061/(Asce)Te.1943-5436.0000747 |
0.466 |
|
2014 |
Wang Y, Li L, Wang L, Moore A, Staley S, Li Z. Modeling traveler mode choice behavior of a new high-speed rail corridor in China Transportation Planning and Technology. 37: 466-483. DOI: 10.1080/03081060.2014.912420 |
0.325 |
|
2014 |
Liu Y, Roshandeh AM, Li Z, Kepaptsoglou K, Patel H, Lu X. Heuristic Approach for Optimizing Emergency Medical Services in Road Safety within Large Urban Networks Journal of Transportation Engineering-Asce. 140: 4014043. DOI: 10.1061/(Asce)Te.1943-5436.0000684 |
0.347 |
|
2014 |
Wang J, Mao X, Li Z, Moore A, Staley S. Determining the Reasonable Scale of a Toll Highway Network in China Journal of Transportation Engineering-Asce. 140: 4014046-4014046. DOI: 10.1061/(Asce)Te.1943-5436.0000671 |
0.349 |
|
2014 |
Roshandeh AM, Levinson HS, Li Z, Patel H, Zhou B. New Methodology for Intersection Signal Timing Optimization to Simultaneously Minimize Vehicle and Pedestrian Delays Journal of Transportation Engineering-Asce. 140: 4014009-4014009. DOI: 10.1061/(Asce)Te.1943-5436.0000658 |
0.316 |
|
2014 |
Zhou B, Li Z, Patel H, Roshandeh AM, Wang Y. Risk-Based Two-Step Optimization Model for Highway Transportation Investment Decision-Making Journal of Transportation Engineering-Asce. 140: 4014007. DOI: 10.1061/(Asce)Te.1943-5436.0000652 |
0.404 |
|
2013 |
Ahmed A, Labi S, Li Z, Shields T. Aggregate and disaggregate statistical evaluation of the performance-based effectiveness of long-term pavement performance specific pavement study-5 (LTPP SPS-5) flexible pavement rehabilitation treatments Structure and Infrastructure Engineering. 9: 172-187. DOI: 10.1080/15732479.2010.524224 |
0.571 |
|
2013 |
Li Z, Roshandeh AM, Zhou B, Lee SH. Optimal Decision Making of Interdependent Tollway Capital Investments Incorporating Risk and Uncertainty Journal of Transportation Engineering-Asce. 139: 686-696. DOI: 10.1061/(Asce)Te.1943-5436.0000540 |
0.475 |
|
2013 |
Wang Y, Wang Z, Li Z, Staley SR, Moore AT, Gao Y. Study of Modal Shifts to Bus Rapid Transit in Chinese Cities Journal of Transportation Engineering-Asce. 139: 515-523. DOI: 10.1061/(Asce)Te.1943-5436.0000523 |
0.335 |
|
2012 |
Li Z, Kaul H, Kapoor S, Veliou E, Zhou B, Lee S. New methodology for transportation investment decisions with consideration of project interdependencies Transportation Research Record. 36-46. DOI: 10.3141/2285-05 |
0.45 |
|
2012 |
Ford KM, Arman MHR, Labi S, Sinha KC, Thompson PD, Shirole AM, Li Z. Estimating Life Expectancies of Highway Assets. Volume 2: Final Report Nchrp Report. 2. DOI: 10.17226/22783 |
0.678 |
|
2010 |
Li Z, Labi S, Karlaftis M, Kepaptsoglou K, Abbas M, Zhou B, Madanu S. Project-level life-cycle benefit-cost analysis approach for evaluating highway segment safety hardware improvements Transportation Research Record. 1-11. DOI: 10.3141/2160-01 |
0.594 |
|
2010 |
Li Z, Madanu S, Zhou B, Wang Y, Abbas MM. A Heuristic Approach for Selecting Highway Investment Alternatives Computer-Aided Civil and Infrastructure Engineering. 25: 427-439. DOI: 10.1111/J.1467-8667.2010.00653.X |
0.383 |
|
2010 |
Li Z. Highway work zone safety audits for safety improvements Engineering, Construction and Architectural Management. 17: 512-526. DOI: 10.1108/09699981011074592 |
0.309 |
|
2010 |
Madanu S, Li Z, Abbas M. Life-Cycle Cost Analysis of Highway intersection Safety Hardware Improvements Journal of Transportation Engineering-Asce. 136: 129-140. DOI: 10.1061/(Asce)Te.1943-5436.0000082 |
0.388 |
|
2009 |
Sinha KC, Patidar V, Li Z, Labi S, Thompson PD. Establishing the weights of performance criteria: Case studies in transportation facility management Journal of Transportation Engineering. 135: 619-631. DOI: 10.1061/(Asce)Te.1943-5436.0000039 |
0.716 |
|
2009 |
Li Z, Madanu S. Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study Journal of Transportation Engineering-Asce. 135: 516-526. DOI: 10.1061/(Asce)Te.1943-5436.0000012 |
0.442 |
|
2009 |
Li Z, Sinha KC. Methodology for the determination of relative weights of highway asset management system goals and of performance measures Journal of Infrastructure Systems. 15: 95-105. DOI: 10.1061/(Asce)1076-0342(2009)15:2(95) |
0.622 |
|
2009 |
Li Z. Stochastic Optimization Model and O(N2) Solution Algorithm for Highway Investment Decision Making under Budget Uncertainty Journal of Transportation Engineering-Asce. 135: 371-379. DOI: 10.1061/(Asce)0733-947X(2009)135:6(371) |
0.416 |
|
2009 |
Li Z, Sinha KC. Application of Shackle's model and system optimization for highway investment decision making under uncertainty Journal of Transportation Engineering. 135: 129-139. DOI: 10.1061/(Asce)0733-947X(2009)135:3(129) |
0.645 |
|
2008 |
Lamptey G, Labi S, Li Z. Decision support for optimal scheduling of highway pavement preventive maintenance within resurfacing cycle Decision Support Systems. 46: 376-387. DOI: 10.1016/j.dss.2008.07.004 |
0.585 |
|
2006 |
Rodriguez MM, Labi SA, Li Z. Enhanced bridge replacement cost models for Indiana's bridge management system Transportation Research Record. 1958: 13-23. DOI: 10.3141/1958-02 |
0.357 |
|
2006 |
Li Z, Sinha KC. Application of Shackle's model for highway project evaluation under uncertainty Applications of Advanced Technology in Transportation - Proceedings of the Ninth International Conference On Applications of Advanced Technology in Transportation. 67-73. DOI: 10.1061/40799(213)12 |
0.587 |
|
2006 |
Rodriguez MM, Labi S, Li Z. Enhanced bridge replacement cost models for Indiana's bridge management system Transportation Research Record. 13-23. |
0.561 |
|
2004 |
Li Z, Sinha KC. Methodology for multicriteria decision making in highway asset management Transportation Research Record. 79-87. DOI: 10.3141/1885-12 |
0.642 |
|
2003 |
Sinha KC, Bullock D, Hendrickson CT, Levinson HS, Lyles RW, Radwan AE, Li Z. Development of Transportation Engineering Research, Education, and Practice in a Changing Civil Engineering World Perspectives in Civil Engineering: Commemorating the 150th Anniversary of the American Society of Civil Engineers. 193-205. DOI: 10.1061/(Asce)0733-947X(2002)128:4(301) |
0.55 |
|
2001 |
Li Z, Sinha KC, McCarthy PS. Methodology to determine load- and non-load-related shares of highway pavement rehabilitation expenditures Transportation Research Record. 79-88. DOI: 10.3141/1747-10 |
0.553 |
|
Show low-probability matches. |