Year |
Citation |
Score |
2019 |
Mock B, O'Connor JT. High-value, low-effort industrial plant commissioning solution strategies Construction Innovation: Information, Process, Management. 19: 653-671. DOI: 10.1108/Ci-09-2018-0072 |
0.425 |
|
2017 |
Han S, Choi JO, O'Connor JT. Quality of Baseline Schedules: Lessons from Higher Education Capital Facility Projects Journal of Professional Issues in Engineering Education and Practice. 143: 4016017. DOI: 10.1061/(Asce)Ei.1943-5541.0000302 |
0.587 |
|
2016 |
O'Connor JT, O'Brien WJ, Choi JO. Industrial Project Execution Planning: Modularization versus Stick-Built Practice Periodical On Structural Design and Construction. 21. DOI: 10.1061/(ASCE)SC.1943-5576.0000270 |
0.468 |
|
2016 |
O'Connor JT, Choi JO, Winkler M. Critical Success Factors for Commissioning and Start-Up of Capital Projects Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001179 |
0.536 |
|
2016 |
Choi JO, O'Connor JT, Kim TW. Recipes for Cost and Schedule Successes in Industrial Modular Projects: Qualitative Comparative Analysis Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001171 |
0.601 |
|
2015 |
Caldas CH, Elkington RWT, O'Connor JT, Kim JY. Development of a method to retain experiential knowledge in capital projects organizations Journal of Management in Engineering. 31. DOI: 10.1061/(Asce)Me.1943-5479.0000322 |
0.443 |
|
2015 |
Kang Y, O'Brien WJ, O'Connor JT. Information-integration maturity model for the capital projects industry Journal of Management in Engineering. 31. DOI: 10.1061/(Asce)Me.1943-5479.0000274 |
0.514 |
|
2015 |
Kim DY, Menches CL, O'Connor JT. Stringing construction planning and execution tasks together for effective project management Journal of Management in Engineering. 31. DOI: 10.1061/(ASCE)ME.1943-5479.0000267 |
0.378 |
|
2015 |
O'Connor JT, O'Brien WJ, Choi JO. Standardization strategy for modular industrial plants Journal of Construction Engineering and Management. 141. DOI: 10.1061/(Asce)Co.1943-7862.0001001 |
0.363 |
|
2014 |
Choi JO, O'Connor JT. Modularization critical success factors accomplishment: Learning from case studies Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. 1636-1645. DOI: 10.1061/9780784413517.0167 |
0.386 |
|
2014 |
Sohn T, Azambuja M, O'Connor JT, O'Brien WJ. Empirical study on the key drivers affecting durations for right-of-way acquisition on highway projects Journal of Management in Engineering. 30. DOI: 10.1061/(Asce)Me.1943-5479.0000264 |
0.639 |
|
2014 |
O'Connor JT, O'Brien WJ, Choi JO. Critical success factors and enablers for optimum and maximum industrial modularization Journal of Construction Engineering and Management. 140. DOI: 10.1061/(Asce)Co.1943-7862.0000842 |
0.553 |
|
2012 |
O'connor JT, Wang CY. Owner and Contractor jobsite organizations Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 2489-2498. DOI: 10.1061/9780784412329.250 |
0.416 |
|
2012 |
Kang Y, O'Brien WJ, O'Connor JT. IOP tool: Assessing the benefits and hindrances of information integration implementation opportunities Journal of Management in Engineering. 28: 160-169. DOI: 10.1061/(Asce)Me.1943-5479.0000066 |
0.375 |
|
2012 |
Shrestha PP, O'Connor JT, Gibson GE. Performance comparison of large design-build and design-bid-build highway projects Journal of Construction Engineering and Management. 138: 1-13. DOI: 10.1061/(Asce)Co.1943-7862.0000390 |
0.777 |
|
2012 |
Kang Y, O'Brien WJ, O'Connor JT. Analysis of information integration benefit drivers and implementation hindrances Automation in Construction. 22: 277-289. DOI: 10.1016/J.Autcon.2011.09.003 |
0.462 |
|
2011 |
Chong WK, Lee SH, O'Connor JT. Estimating highway construction production rates during design: Elements of a useful estimation tool Leadership and Management in Engineering. 11: 258-266. DOI: 10.1061/(Asce)Lm.1943-5630.0000135 |
0.559 |
|
2009 |
Sohn T, O'Connor JT, O'Brien W, Azambuja M. An implementation study of the right-of-way acquisition and utility adjustment process duration information (RUDI) tool Proceedings of the 2009 Asce International Workshop On Computing in Civil Engineering. 346: 643-655. DOI: 10.1061/41052(346)64 |
0.501 |
|
2009 |
Migliaccio GC, Gibson GE, O'connor JT. Procurement of design-build services: Two-phase selection for highway projects Journal of Management in Engineering. 25: 29-39. DOI: 10.1061/(Asce)0742-597X(2009)25:1(29) |
0.705 |
|
2009 |
Chou CC, Caldas CH, O'Connor JT, Sroka AW, Goldman GK. Identification of decision drivers for the strategy of incorporating utility relocations into highway construction contracts Journal of Construction Engineering and Management. 135: 812-818. DOI: 10.1061/(Asce)0733-9364(2009)135:9(812) |
0.445 |
|
2009 |
O'Connor JT, Damiano VP, Kulkarni R, Clark P. Executing a standard plant design using the 4X model - Case study: A low-sulfur gasoline project on four identical process units Hydrocarbon Processing. 88. |
0.335 |
|
2009 |
O'Connor JT, Damiano VP, Kulkarni R, Clark P. Executing a standard plant design using the 4X model Hydrocarbon Processing. 88. |
0.313 |
|
2008 |
Migliaccio GC, Gibson GE, O'Connor JT. Changing Project Delivery Strategy: An Implementation Framework Public Works Management & Policy. 12: 483-502. DOI: 10.1177/1087724X07311805 |
0.687 |
|
2008 |
Caldas CH, Chou CC, O'connor J. Negotiation-based decision support model for utility relocations in transportation infrastructure projects Construction Management and Economics. 26: 1079-1090. DOI: 10.1080/01446190802331388 |
0.504 |
|
2007 |
Shrestha PP, Migliaccio GC, O'Connor JT, Gibson GE. Benchmarking of large design-build highway projects one-to-one comparison and comparison with design-bid-build projects Transportation Research Record. 17-25. DOI: 10.3141/1994-03 |
0.802 |
|
2007 |
Chou CC, Caldas CH, O'Connor JT. Decision support system for combined transportation and utility construction strategy Transportation Research Record. 9-16. DOI: 10.3141/1994-02 |
0.431 |
|
2007 |
Kallantzis AC, Borcherding JD, O'Connor JT. Evaluation of differing subsurface ground conditions in construction contracts Journal of Professional Issues in Engineering Education and Practice. 133: 53-59. DOI: 10.1061/(Asce)1052-3928(2007)133:1(53) |
0.309 |
|
2007 |
Yang LR, O'Connor JT, Huang CF. Comparison of technology utilization and benefits in taiwanese and U.S. industries Journal of Management in Engineering. 23: 147-155. DOI: 10.1061/(Asce)0742-597X(2007)23:3(147) |
0.503 |
|
2007 |
Jarrah R, Kulkarni D, O'Connor JT. Cash flow projections for selected TxDoT highway projects Journal of Construction Engineering and Management. 133: 235-241. DOI: 10.1061/(Asce)0733-9364(2007)133:3(235) |
0.678 |
|
2007 |
Chou JS, O'Connor JT. Internet-based preliminary highway construction cost estimating database Automation in Construction. 17: 65-74. DOI: 10.1016/J.Autcon.2007.03.001 |
0.474 |
|
2007 |
Yang LR, O'Connor JT, Chen JH. Assessment of automation and integration technology's impacts on project stakeholder success Automation in Construction. 16: 725-733. DOI: 10.1016/J.Autcon.2006.11.005 |
0.547 |
|
2006 |
Chou JS, Peng M, Persad KR, O'Connor JT. Quantity-based approach to preliminary cost estimates for highway projects Transportation Research Record. 22-30. DOI: 10.3141/1946-03 |
0.654 |
|
2006 |
Chou CC, Caldas CH, O'Connor JT, Goldman GK. Development of group decision-support model and system for combined transportation and utility construction Applications of Advanced Technology in Transportation - Proceedings of the Ninth International Conference On Applications of Advanced Technology in Transportation. 786-791. DOI: 10.1061/40799(213)126 |
0.306 |
|
2006 |
Migliaccio GC, Goel S, O'Connor JT. Life-cycle cost analysis for selection of energy-efficient building components in lodging facilities Aei 2006: Building Integration Solutions - Proceedings of the 2006 Architectural Engineering National Conference. 2006: 54. DOI: 10.1061/40798(190)54 |
0.527 |
|
2006 |
Cha HS, O'Connor JT. Characteristics for leveraging value management processes on capital facility projects Journal of Management in Engineering. 22: 135-147. DOI: 10.1061/(Asce)0742-597X(2006)22:3(135) |
0.732 |
|
2006 |
O'Connor JT, Huh Y. Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges Journal of Construction Engineering and Management. 132: 408-415. DOI: 10.1061/(ASCE)0733-9364(2006)132:4(408) |
0.531 |
|
2006 |
Yang LR, O'Connor JT, Wang CC. Technology utilization on different sizes of projects and associated impacts on composite project success International Journal of Project Management. 24: 96-105. DOI: 10.1016/J.Ijproman.2005.06.008 |
0.609 |
|
2006 |
Yang LR, Huang CF, O'Connor JT. Assessment and comparison of technology utilization in the Taiwanese and American industries 2006 Proceedings of the 23rd International Symposium On Robotics and Automation in Construction, Isarc 2006. 130-133. |
0.391 |
|
2005 |
O'Connor JT, Huh Y. Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges Journal of Construction Engineering and Management. 131: 1013-1020. DOI: 10.1061/(ASCE)0733-9364(2005)131:9(1013) |
0.501 |
|
2005 |
Cha HS, O'Connor JT. Optimizing implementation of value management processes for capital projects Journal of Construction Engineering and Management. 131: 239-251. DOI: 10.1061/(Asce)0733-9364(2005)131:2(239) |
0.733 |
|
2005 |
Chong WK, O'Connor JT, Chou JS, Lee SH. Predicting the production rates of foundation construction using factor and regression analysis Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress. 567-576. |
0.598 |
|
2005 |
Migliaccio GC, Gibson GE, O'Connor JT. Delivering highway projects through design-build: Analysis of the comprehensive development agreement (CDA) procurement process in Texas Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress. 919-928. |
0.696 |
|
2005 |
Chou JS, Wang L, Chong WK, O'Connor JT. Preliminary cost estimates using probabilistic simulation for highway bridge replacement projects Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress. 939-948. |
0.692 |
|
2005 |
Migliaccio GC, Gibson GE, O'Connor JT. Design-build procurement process model for delivering highways in Texas Proceedings of the 2005 Asce International Conference On Computing in Civil Engineering. 1639-1646. |
0.542 |
|
2005 |
Chong WK, O'Connor JT. Modeling construction production rates for pipes and culverts Proceedings of the Pipeline Division Specialty Conference. 228-240. |
0.613 |
|
2005 |
Yang LR, O'Connor JT. Associations of technology utilization with project stakeholder success Proceedings of the 2005 Asce International Conference On Computing in Civil Engineering. 1225-1230. |
0.51 |
|
2005 |
O'Connor JT, Thorsen WC. CII'S new on-line value management toolkit 45th Annual Conference of Save International 2005. 361-374. |
0.355 |
|
2004 |
El-Diraby TE, O'Connor JT. Lessons learned in designing research methodology in field-based construction research Journal of Professional Issues in Engineering Education and Practice. 130: 109-114. DOI: 10.1061/(ASCE)1052-3928(2004)130:2(109) |
0.345 |
|
2004 |
O'Connor JT, Yang LR. Project performance versus use of technologies at project and phase levels Journal of Construction Engineering and Management. 130: 322-329. DOI: 10.1061/(Asce)0733-9364(2004)130:3(322) |
0.565 |
|
2003 |
O'Connor JT, Yang LR. Impact of Integration and Automation Technology on Project Success Measures Towards a Vision For Information Technology in Civil Engineering. 19-30. |
0.539 |
|
2003 |
O'Connor JT, Yang LR. Technology utilization on building projects and associated impacts on project success Architectural Engineering, Building Integration Solutions. 220-223. |
0.535 |
|
2002 |
Popescu A, O'Connor JT, Borcherding JD. Project scheduling enhancements for avoiding litigation Aace International. Transactions of the Annual Meeting. |
0.37 |
|
2001 |
Khwaja NA, O'Connor JT. Lessons-learned system for highway constructibility Transportation Research Record. 116-123. DOI: 10.3141/1761-15 |
0.482 |
|
2001 |
El-Diraby TE, O'Connor JT. Model for evaluating bridge construction plans Journal of Construction Engineering and Management. 127: 399-405. DOI: 10.1061/(Asce)0733-9364(2001)127:5(399) |
0.472 |
|
2000 |
O'Connor JT, El-Diraby TE. Urban freeway bridge reconstruction planning: case of Mockingbird bridge Journal of Construction Engineering and Management. 126: 61-67. DOI: 10.1061/(Asce)0733-9364(2000)126:1(61) |
0.621 |
|
2000 |
O'Connor JT, Dodd SC. Achieving integration on capital projects with enterprise resource planning systems Automation in Construction. 9: 515-524. DOI: 10.1016/S0926-5805(00)00062-5 |
0.493 |
|
1997 |
Varghese K, Dharwadkar P, Wolfhope J, O'Connor JT. A heavy lift planning system for crane lifts Microcomputers in Civil Engineering. 12: 31-42. DOI: 10.1111/0885-9507.00044 |
0.35 |
|
1996 |
Goucha HY, O'Connor JT. Redesign of vendor-data processes for industrial projects Journal of Management in Engineering. 12: 53-61. DOI: 10.1061/(Asce)0742-597X(1996)12:5(53) |
0.407 |
|
1996 |
Cheng MY, O'Connor JT. Arcsite: Enhanced GIS for construction site layout Journal of Construction Engineering and Management. 122: 329-336. DOI: 10.1061/(Asce)0733-9364(1996)122:4(329) |
0.385 |
|
1995 |
O'Connor JT, Miller SJ. overcoming barriers to successful constructability implementation efforts Journal of Performance of Constructed Facilities. 9: 117-128. DOI: 10.1061/(Asce)0887-3828(1995)9:2(117) |
0.505 |
|
1995 |
Persad KR, O'Connor JT, Varghese K. Forecastng Engineering Manpower Requirements for Highway Preconstruction Activities Journal of Management in Engineering. 11: 41-47. DOI: 10.1061/(Asce)0742-597X(1995)11:3(41) |
0.476 |
|
1995 |
Varghese K, O'Connor JT. Routing large vehicles on industrial construction sites Journal of Construction Engineering and Management. 121: 1-12. DOI: 10.1061/(Asce)0733-9364(1995)121:1(1) |
0.403 |
|
1995 |
O'Connor JT, Caraway PH. Need for specification format that accommodates engineered projects Journal of Construction Engineering and Management. 121: 157-158. DOI: 10.1061/(Asce)0733-9364(1993)119:4(757) |
0.537 |
|
1994 |
Tucker RL, O'Connor JT, Gatton TM, Gibson GE, Haas CT, Hudson DN. The Impact of Computer Technology on Construction's Future Computer‐Aided Civil and Infrastructure Engineering. 9: 3-11. DOI: 10.1111/J.1467-8667.1994.Tb00357.X |
0.469 |
|
1994 |
Cheng MY, O'Connor JT. Site layout of construction temporary facilities using an enhanced-geographic information system (GIS) Automation in Construction. 3: 11-19. DOI: 10.1016/0926-5805(94)90028-0 |
0.416 |
|
1993 |
O'Connor JT, Norwich WT. Fossil power plant constructability: applications of CII concepts Journal of Energy Engineering-Asce. 119: 55-73. DOI: 10.1061/(Asce)0733-9402(1993)119:1(55) |
0.446 |
|
1991 |
O'Connor JT, Hugo F, Stamm EM. Improving Highway Specifications for Constructibility Journal of Construction Engineering and Management-Asce. 117: 242-258. DOI: 10.1061/(Asce)0733-9364(1991)117:2(242) |
0.426 |
|
1989 |
Hughes PJ, O'Connor JT, Traver AE. Pipe manipulator enhancements for increased automation J. Construction Engineering &Amp; Management. 115. DOI: 10.1061/(Asce)0733-9364(1989)115:3(412) |
0.311 |
|
1986 |
O'connor JT, Larimore MA, Tucker RL. Collecting constructability improvement ideas Journal of Construction Engineering and Management. 112: 463-475. DOI: 10.1061/(Asce)0733-9364(1986)112:4(463) |
0.528 |
|
1986 |
O'connor JT, Tucker RL. Industrial project constructability improvement Journal of Construction Engineering and Management. 112: 69-82. DOI: 10.1061/(ASCE)0733-9364(1986)112:1(69) |
0.49 |
|
1985 |
O'Connor JT. Impacts Of Constructability Improvement. Journal of Construction Engineering and Management-Asce. 111: 404-410. DOI: 10.1061/(Asce)0733-9364(1985)111:4(404) |
0.479 |
|
Show low-probability matches. |