Year |
Citation |
Score |
2020 |
Manda AB, Uzsoy R. A Simple Model of Capacity Contention During New Product Introductions Ieee Transactions On Semiconductor Manufacturing. 33: 240-251. DOI: 10.1109/Tsm.2020.2981412 |
0.453 |
|
2020 |
Ziarnetzky T, Monch L, Uzsoy R. Simulation-Based Performance Assessment of Production Planning Models With Safety Stock and Forecast Evolution in Semiconductor Wafer Fabrication Ieee Transactions On Semiconductor Manufacturing. 33: 1-12. DOI: 10.1109/Tsm.2019.2958526 |
0.444 |
|
2020 |
Bansal A, Uzsoy R. Constraint violation reduction search for 0–1 mixed integer linear programming problems Engineering Optimization. 1-18. DOI: 10.1080/0305215X.2020.1742710 |
0.342 |
|
2019 |
Uzsoy R. Editorial 2018 Best Paper Award Ieee Transactions On Semiconductor Manufacturing. 32: 139-139. DOI: 10.1109/Tsm.2019.2910984 |
0.348 |
|
2019 |
Gopalswamy K, Uzsoy R. A data-driven iterative refinement approach for estimating clearing functions from simulation models of production systems International Journal of Production Research. 57: 6013-6030. DOI: 10.1080/00207543.2018.1557351 |
0.35 |
|
2019 |
Kapadia MS, Starly B, Thomas A, Uzsoy R, Warsing D. Impact of Scheduling Policies on the Performance of an Additive Manufacturing Production System Procedia Manufacturing. 39: 447-456. DOI: 10.1016/J.Promfg.2020.01.388 |
0.403 |
|
2019 |
Gopalswamy K, Fathi Y, Uzsoy R. Valid inequalities for concave piecewise linear regression Operations Research Letters. 47: 52-58. DOI: 10.1016/J.Orl.2018.12.004 |
0.351 |
|
2018 |
Uzsoy R. Editorial 2017 Best Paper Award Ieee Transactions On Semiconductor Manufacturing. 31: 325-325. DOI: 10.1109/Tsm.2018.2852818 |
0.381 |
|
2018 |
Ziarnetzky T, Mönch L, Uzsoy R. Rolling horizon, multi-product production planning with chance constraints and forecast evolution for wafer fabs International Journal of Production Research. 56: 6112-6134. DOI: 10.1080/00207543.2018.1478461 |
0.407 |
|
2018 |
Uzsoy R, Fowler JW, Mönch L. A survey of semiconductor supply chain models Part II: demand planning, inventory management, and capacity planning International Journal of Production Research. 56: 4546-4564. DOI: 10.1080/00207543.2018.1424363 |
0.388 |
|
2018 |
Mönch L, Uzsoy R, Fowler JW. A survey of semiconductor supply chain models part III: master planning, production planning, and demand fulfilment International Journal of Production Research. 56: 4565-4584. DOI: 10.1080/00207543.2017.1401234 |
0.366 |
|
2018 |
Mönch L, Uzsoy R, Fowler JW. A survey of semiconductor supply chain models part I: semiconductor supply chains, strategic network design, and supply chain simulation International Journal of Production Research. 56: 4524-4545. DOI: 10.1080/00207543.2017.1401233 |
0.39 |
|
2018 |
Karagul HF, Warsing DP, Hodgson TJ, Kapadia MS, Uzsoy R. A comparison of mixed integer programming formulations of the capacitated lot-sizing problem International Journal of Production Research. 56: 7064-7084. DOI: 10.1080/00207543.2017.1401232 |
0.388 |
|
2018 |
Sengul Orgut I, Ivy JS, Uzsoy R, Hale C. Robust optimization approaches for the equitable and effective distribution of donated food European Journal of Operational Research. 269: 516-531. DOI: 10.1016/J.Ejor.2018.02.017 |
0.641 |
|
2018 |
Kang Y, Albey E, Uzsoy R. Rounding heuristics for multiple product dynamic lot-sizing in the presence of queueing behavior Computers & Operations Research. 100: 54-65. DOI: 10.1016/J.Cor.2018.07.019 |
0.48 |
|
2017 |
Albey E, Bilge Ü, Uzsoy R. Multi-dimensional clearing functions for aggregate capacity modelling in multi-stage production systems International Journal of Production Research. 55: 4164-4179. DOI: 10.1080/00207543.2016.1257169 |
0.381 |
|
2016 |
Albey E, Uzsoy R. Lead time modeling in production planning Proceedings - Winter Simulation Conference. 2016: 1996-2007. DOI: 10.1109/WSC.2015.7408315 |
0.308 |
|
2016 |
Kacar NB, Mönch L, Uzsoy R. Modeling Cycle Times in Production Planning Models for Wafer Fabrication Ieee Transactions On Semiconductor Manufacturing. 29: 153-167. DOI: 10.1109/Tsm.2016.2546314 |
0.455 |
|
2016 |
Fanti MP, Zhou U, Uzsoy R. Guest Editorial Special Section on Emerging Advances in Logistics Systems: Integrating Remote Sensing, IT, and Autonomy Ieee Transactions On Automation Science and Engineering. 13: 1420-1421. DOI: 10.1109/Tase.2016.2606861 |
0.35 |
|
2016 |
Lin PC, Uzsoy R. Chance-constrained formulations in rolling horizon production planning: an experimental study International Journal of Production Research. 1-16. DOI: 10.1080/00207543.2016.1165356 |
0.424 |
|
2016 |
Kefeli A, Uzsoy R. Identifying potential bottlenecks in production systems using dual prices from a mathematical programming model International Journal of Production Research. 54: 2000-2018. DOI: 10.1080/00207543.2015.1076182 |
0.426 |
|
2016 |
Yaylali E, Ivy JS, Uzsoy R, Samoff E, Meyer AM, Maillard JM. Modeling the effect of public health resources and alerting on the dynamics of pertussis spread Health Systems. 5: 81-97. DOI: 10.1057/Hs.2015.6 |
0.646 |
|
2016 |
Li M, Yang F, Uzsoy R, Xu J. A metamodel-based Monte Carlo simulation approach for responsive production planning of manufacturing systems Journal of Manufacturing Systems. 38: 114-133. DOI: 10.1016/j.jmsy.2015.11.004 |
0.308 |
|
2015 |
Albey E, Norouzi A, Kempf KG, Uzsoy R. Demand Modeling with Forecast Evolution: An Application to Production Planning Ieee Transactions On Semiconductor Manufacturing. 28: 374-384. DOI: 10.1109/Tsm.2015.2453792 |
0.435 |
|
2015 |
Orgut IS, Ivy J, Uzsoy R, Wilson JR. Modeling for the equitable and effective distribution of donated food under capacity constraints Iie Transactions (Institute of Industrial Engineers). 1-15. DOI: 10.1080/0740817X.2015.1063792 |
0.625 |
|
2015 |
Aouam T, Uzsoy R. Zero-order production planning models with stochastic demand and workload-dependent lead times International Journal of Production Research. 53: 1661-1679. DOI: 10.1080/00207543.2014.935514 |
0.471 |
|
2014 |
Kacar NB, Uzsoy R. Estimating Clearing Functions for Production Resources Using Simulation Optimization Ieee Transactions On Automation Science and Engineering. DOI: 10.1109/Tase.2014.2303316 |
0.358 |
|
2014 |
Norouzi A, Uzsoy R. Modeling the evolution of dependency between demands, with application to inventory planning Iie Transactions (Institute of Industrial Engineers). 46: 55-66. DOI: 10.1080/0740817X.2013.803637 |
0.416 |
|
2014 |
Albey E, Bilge U, Uzsoy R. An exploratory study of disaggregated clearing functions for production systems with multiple products International Journal of Production Research. 52: 5301-5322. DOI: 10.1080/00207543.2014.899442 |
0.397 |
|
2014 |
Kacar NB, Uzsoy R. A comparison of multiple linear regression approaches for fitting clearing functions to empirical data International Journal of Production Research. 52: 3164-3184. DOI: 10.1080/00207543.2013.864052 |
0.346 |
|
2014 |
Godinho Filho M, Uzsoy R. Assessing the impact of alternative continuous improvement programmes in a flow shop using system dynamics International Journal of Production Research. 52: 3014-3031. DOI: 10.1080/00207543.2013.860249 |
0.365 |
|
2014 |
Kang Y, Albey E, Hwang S, Uzsoy R. The impact of lot-sizing in multiple product environments with congestion Journal of Manufacturing Systems. 33: 436-444. DOI: 10.1016/J.Jmsy.2014.04.003 |
0.703 |
|
2014 |
Giddings AP, Rardin RL, Uzsoy R. Statistical optimum estimation techniques for combinatorial optimization problems: A review and critique Journal of Heuristics. 20: 329-358. DOI: 10.1007/S10732-014-9243-4 |
0.325 |
|
2013 |
Kacar NB, Monch L, Uzsoy R. A comparison of production planning formulations with exogenous cycle time estimates using a large-scale wafer fab model Proceedings of the 2013 Winter Simulation Conference - Simulation: Making Decisions in a Complex World, Wsc 2013. 3731-3744. DOI: 10.1109/WSC.2013.6721733 |
0.316 |
|
2013 |
Kacar NB, Mönch L, Uzsoy R. Planning wafer starts using nonlinear clearing functions: A large-scale experiment Ieee Transactions On Semiconductor Manufacturing. 26: 602-612. DOI: 10.1109/Tsm.2013.2283038 |
0.41 |
|
2013 |
Filho MG, Uzsoy R. The impact of simultaneous continuous improvement in setup time and repair time on manufacturing cycle times under uncertain conditions International Journal of Production Research. 51: 447-464. DOI: 10.1080/00207543.2011.652261 |
0.412 |
|
2012 |
Kim S, Uzsoy R. Modeling and analysis of integrated planning of production and engineering process improvement Asmc (Advanced Semiconductor Manufacturing Conference) Proceedings. 201-207. DOI: 10.1109/Tsm.2013.2261099 |
0.373 |
|
2012 |
Kacar NB, Irdem DF, Uzsoy R. An experimental comparison of production planning using clearing functions and iterative linear programming-simulation algorithms Ieee Transactions On Semiconductor Manufacturing. 25: 104-117. DOI: 10.1109/Tsm.2011.2176560 |
0.417 |
|
2011 |
Liu J, Li C, Yang F, Wan H, Uzsoy R. Production planning for semiconductor manufacturing via simulation optimization Proceedings - Winter Simulation Conference. 3612-3622. DOI: 10.1109/WSC.2011.6148055 |
0.341 |
|
2011 |
Crist K, Uzsoy R. Prioritising production and engineering lots in wafer fabrication facilities: A simulation study International Journal of Production Research. 49: 3105-3125. DOI: 10.1080/00207541003801259 |
0.386 |
|
2011 |
Kefeli A, Uzsoy R, Fathi Y, Kay M. Using a mathematical programming model to examine the marginal price of capacitated resources International Journal of Production Economics. 131: 383-391. DOI: 10.1016/J.Ijpe.2010.03.018 |
0.394 |
|
2011 |
Godinho Filho M, Uzsoy R. The effect of shop floor continuous improvement programs on the lot size-cycle time relationship in a multi-product single-machine environment International Journal of Advanced Manufacturing Technology. 52: 669-681. DOI: 10.1007/S00170-010-2770-8 |
0.39 |
|
2011 |
Missbauer H, Uzsoy R. Optimization models of production planning problems International Series in Operations Research and Management Science. 151: 437-507. DOI: 10.1007/978-1-4419-6485-4_16 |
0.305 |
|
2011 |
Jarugumilli K, Uzsoy R. A nonlinear knapsack problem arising in location problems with safety stocks 61st Annual Iie Conference and Expo Proceedings. |
0.324 |
|
2010 |
Irdem DF, Kacar NB, Uzsoy R. An exploratory analysis of two iterative linear programming-simulation approaches for production planning Ieee Transactions On Semiconductor Manufacturing. 23: 442-455. DOI: 10.1109/Tsm.2010.2051751 |
0.437 |
|
2009 |
Godinho Filho M, Uzsoy R. Effect of lot size reduction and continuous improvement on work in process and utilization: Study using a combined system dynamics and factory physics approach Producao. 19: 214-229. DOI: 10.1590/S0103-65132009000100014 |
0.376 |
|
2009 |
Sourirajan K, Ozsen L, Uzsoy R. A genetic algorithm for a single product network design model with lead time and safety stock considerations European Journal of Operational Research. 197: 599-608. DOI: 10.1016/J.Ejor.2008.07.038 |
0.792 |
|
2009 |
Kim S, Uzsoy R. Heuristics for capacity planning problems with congestion Computers and Operations Research. 36: 1924-1934. DOI: 10.1016/J.Cor.2008.06.006 |
0.53 |
|
2009 |
Orcun S, Uzsoy R, Kempf KG. An integrated production planning model with load-dependent lead-times and safety stocks Computers and Chemical Engineering. 33: 2159-2163. DOI: 10.1016/J.Compchemeng.2009.07.010 |
0.486 |
|
2009 |
Asmundsson J, Rardin RL, Turkseven CH, Uzsoy R. Production planning with resources subject to congestion Naval Research Logistics. 56: 142-157. DOI: 10.1002/Nav.20335 |
0.407 |
|
2008 |
Chien CF, Dauzère-Pérès S, Ehm H, Fowler JW, Jiang Z, Krishnaswamy S, Mönch L, Uzsoy R. Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes Proceedings - Winter Simulation Conference. 2093-2099. DOI: 10.1504/Ejie.2011.041616 |
0.375 |
|
2008 |
Irdem DF, Kacar NB, Uzsoy R. An experimental study of an iterative simulation-optimization algorithm for production planning Proceedings - Winter Simulation Conference. 2176-2184. DOI: 10.1109/WSC.2008.4736317 |
0.3 |
|
2008 |
Kim S, Uzsoy RM. Integrated planning of production and engineering process improvement Ieee Transactions On Semiconductor Manufacturing. 21: 390-398. DOI: 10.1109/Tsm.2008.2001215 |
0.36 |
|
2008 |
Kim S, Uzsoy R. Exact and heuristic procedures for capacity expansion problems with congestion Iie Transactions (Institute of Industrial Engineers). 40: 1185-1197. DOI: 10.1080/07408170802322978 |
0.533 |
|
2008 |
Upasani A, Uzsoy R. Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: A simulation study International Journal of Production Research. 46: 5883-5905. DOI: 10.1080/00207540601156215 |
0.415 |
|
2008 |
Geiger CD, Uzsoy R. Learning effective dispatching rules for batch processor scheduling International Journal of Production Research. 46: 1431-1454. DOI: 10.1080/00207540600993360 |
0.755 |
|
2008 |
Uzsoy R, Velásquez JD. Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times Computers and Operations Research. 35: 2018-2033. DOI: 10.1016/J.Cor.2006.10.003 |
0.439 |
|
2008 |
Upasani A, Uzsoy R. Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions Annals of Operations Research. 161: 171-188. DOI: 10.1007/S10479-007-0294-X |
0.714 |
|
2007 |
Orcun S, Çetinkaya S, Uzsoy R. Determining safety stocks in the presence of workload-dependent lead times Proceedings - Winter Simulation Conference. 1691-1698. DOI: 10.1109/WSC.2007.4419791 |
0.352 |
|
2007 |
Orcun S, Asmundsson JM, Uzsoy R, Clement JP, Pekny JF, Rardin RL. Supply chain optimisation and protocol environment (SCOPE) for rapid prototyping and analysis of complex supply chains Production Planning and Control. 18: 388-406. DOI: 10.1080/09537280701417116 |
0.362 |
|
2007 |
Sourirajan K, Ozsen L, Uzsoy R. A single-product network design model with lead time and safety stock considerations Iie Transactions (Institute of Industrial Engineers). 39: 411-424. DOI: 10.1080/07408170600941631 |
0.795 |
|
2007 |
Malve S, Uzsoy R. A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families Computers and Operations Research. 34: 3016-3028. DOI: 10.1016/J.Cor.2005.11.011 |
0.422 |
|
2007 |
Sourirajan K, Uzsoy R. Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication Journal of Scheduling. 10: 41-65. DOI: 10.1007/S10951-006-0325-5 |
0.793 |
|
2007 |
Varma VA, Uzsoy R, Pekny J, Blau G. Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry Journal of Heuristics. 13: 403-433. DOI: 10.1007/S10732-007-9016-4 |
0.437 |
|
2007 |
Eskigun E, Uzsoy R, Preckel PV, Beaujon G, Krishnan S, Tew JD. Outbound supply chain network design with mode selection and lead time considerations Naval Research Logistics. 54: 282-300. DOI: 10.1002/Nav.20205 |
0.754 |
|
2006 |
Orcun S, Uzsoy R, Kempf K. Using system dynamics simulations to compare capacity models for production planning Proceedings - Winter Simulation Conference. 1855-1862. DOI: 10.1109/WSC.2006.322966 |
0.329 |
|
2006 |
Upasani AA, Uzsoy R, Sourirajan K. A problem reduction approach for scheduling semiconductor wafer fabrication facilities Ieee Transactions On Semiconductor Manufacturing. 19: 216-225. DOI: 10.1109/Tsm.2006.873510 |
0.445 |
|
2006 |
Asmundsson J, Rardin RL, Uzsoy R. Tractable nonlinear production planning models for semiconductor wafer fabrication facilities Ieee Transactions On Semiconductor Manufacturing. 19: 95-111. DOI: 10.1109/Tsm.2005.863214 |
0.404 |
|
2006 |
Geiger CD, Uzsoy R, Aytuǧ H. Rapid modeling and discovery of priority dispatching rules: An autonomous learning approach Journal of Scheduling. 9: 7-34. DOI: 10.1007/S10951-006-5591-8 |
0.759 |
|
2005 |
Barua A, Raghavan N, Upasani A, Uzsoy R. Implementing global factory schedules in the face of stochastic disruptions International Journal of Production Research. 43: 793-818. DOI: 10.1080/00207540412331282024 |
0.449 |
|
2005 |
Eskigun E, Uzsoy R, Preckel PV, Beaujon G, Krishnan S, Tew JD. Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers European Journal of Operational Research. 165: 182-206. DOI: 10.1016/J.Ejor.2003.11.029 |
0.753 |
|
2005 |
Aytug H, Lawley MA, McKay K, Mohan S, Uzsoy R. Executing production schedules in the face of uncertainties: A review and some future directions European Journal of Operational Research. 161: 86-110. DOI: 10.1016/J.Ejor.2003.08.027 |
0.403 |
|
2005 |
Akçali E, Üngör A, Uzsoy R. Short-term capacity allocation problem with tool and setup constraints Naval Research Logistics. 52: 754-764. DOI: 10.1002/Nav.20112 |
0.782 |
|
2003 |
Aytug H, Barua A, Lawley M, Uzsoy R. Observations on the interactions among deadlock avoidance policies and dispatching rules in automated manufacturing systems International Journal of Production Research. 41: 81-95. DOI: 10.1080/00207540210163955 |
0.312 |
|
2003 |
Aytug H, Kempf K, Uzsoy R. Measures of subproblem criticality in decomposition algorithms for shop scheduling International Journal of Production Research. 41: 865-882. DOI: 10.1080/0020754021000037856 |
0.433 |
|
2002 |
Wang CS, Uzsoy R. A genetic algorithm to minimize maximum lateness on a batch processing machine Computers and Operations Research. 29: 1621-1640. DOI: 10.1016/S0305-0548(01)00031-4 |
0.763 |
|
2001 |
Akçall E, Davis M, Hamlin RD, McCullough T, Teyner T, Uzsoy R. A decision support system for spare parts management in a wafer fabrication facility Ieee Transactions On Semiconductor Manufacturing. 14: 76-78. DOI: 10.1109/66.909657 |
0.307 |
|
2001 |
Horiguchi K, Raghavan N, Uzsoy R, Venkateswaran S. Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility International Journal of Production Research. 39: 825-842. DOI: 10.1080/00207540010010253 |
0.337 |
|
2001 |
Rardin RL, Uzsoy R. Experimental evaluation of heuristic optimization algorithms: A tutorial Journal of Heuristics. 7: 261-304. DOI: 10.1023/A:1011319115230 |
0.426 |
|
2000 |
Nemoto K, Akcali E, Uzsoy R. Quantifying the benefits of cycle time reduction in semiconductor wafer fabrication Ieee Transactions On Electronics Packaging Manufacturing. 23: 3. DOI: 10.1109/6104.827525 |
0.761 |
|
2000 |
Uzsoy R, Wang CS. Performance of decomposition procedures for job shop scheduling problems with bottleneck machines International Journal of Production Research. 38: 1271-1286. DOI: 10.1080/002075400188843 |
0.752 |
|
2000 |
Ovacik IM, Rajagopalan S, Uzsoy R. Integrating interval estimates of global optima and local search methods for combinatorial optimization problems Journal of Heuristics. 6: 481-500. DOI: 10.1023/A:1009669326107 |
0.372 |
|
2000 |
Kempf K, Uzsoy R, Smith S, Gary K. Evaluation and comparison of production schedules Computers in Industry. 42: 203-220. DOI: 10.1016/S0166-3615(99)00071-8 |
0.404 |
|
2000 |
Demirkol E, Uzsoy R. Decomposition methods for reentrant flow shops with sequence-dependent setup times Journal of Scheduling. 3: 155-177. DOI: 10.1002/(Sici)1099-1425(200005/06)3:3<155::Aid-Jos39>3.0.Co;2-E |
0.395 |
|
2000 |
Akçali E, Uzsoy R. A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography Proceedings of the Ieee/Cpmt International Electronics Manufacturing Technology (Iemt) Symposium. 374-381. |
0.332 |
|
1999 |
Lee CY, Uzsoy R. Minimizing makespan on a single batch processing machine with dynamic job arrivals International Journal of Production Research. 37: 219-236. DOI: 10.1080/002075499192020 |
0.43 |
|
1999 |
O'Donovan R, Uzsoy R, McKay KN. Predictable scheduling of a single machine with breakdowns and sensitive jobs International Journal of Production Research. 37: 4217-4233. DOI: 10.1080/002075499189745 |
0.424 |
|
1999 |
Meacham A, Uzsoy R, Venkatadri U. Optimal disassembly configurations for single and multiple products Journal of Manufacturing Systems. 18: 311-322. DOI: 10.1016/S0278-6125(00)87634-7 |
0.463 |
|
1999 |
Uzsoy R. Manufacturing scheduling: Are the times a-changin'? Journal of Manufacturing Systems. 18. DOI: 10.1016/S0278-6125(00)86627-3 |
0.432 |
|
1999 |
Woo M, Uzsoy R, Ghafoor A. Media Streams Scheduling for Synchronization in Distributed Multimedia Systems Journal of Parallel and Distributed Computing. 56: 272-295. DOI: 10.1006/jpdc.1998.1526 |
0.334 |
|
1998 |
Mehta SV, Uzsoy R. Minimizing total tardiness on a batch processing machine with incompatible job families Iie Transactions (Institute of Industrial Engineers). 30: 165-178. DOI: 10.1080/07408179808966448 |
0.392 |
|
1998 |
Beril Toktay L, Uzsoy R. A capacity allocation problem with integer side constraints European Journal of Operational Research. 109: 170-182. DOI: 10.1016/S0377-2217(98)80011-8 |
0.481 |
|
1998 |
Demirkol E, Mehta S, Uzsoy R. Benchmarks for shop scheduling problems European Journal of Operational Research. 109: 137-141. DOI: 10.1016/S0377-2217(97)00019-2 |
0.399 |
|
1998 |
Kempf KG, Uzsoy R, Wang CS. Scheduling a Single Batch Processing Machine with Secondary Resource Constraints Journal of Manufacturing Systems. 17: 37-51. DOI: 10.1016/S0278-6125(98)80008-3 |
0.764 |
|
1997 |
Lee C, Uzsoy R, Martin-Vega LA. Letter to the Editor---Addendum to “Efficient Algorithms for Scheduling Semiconductor Burn-In Operations Operations Research. 45: 153-154. DOI: 10.1287/Opre.45.1.153 |
0.305 |
|
1997 |
Uzsoy R, Yang Y. Minimizing total weighted completion time on a single batch processing machine Production and Operations Management. 6: 57-73. DOI: 10.1111/J.1937-5956.1997.Tb00415.X |
0.441 |
|
1997 |
Chand S, Traub R, Uzsoy R. Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates Annals of Operations Research. 70: 115-125. DOI: 10.1023/A:1018961818782 |
0.424 |
|
1997 |
Unal AT, Uzsoy R, Kiran AS. Rescheduling on a single machine with part-type dependent setup times and deadlines Annals of Operations Research. 70: 93-113. DOI: 10.1023/A:1018955111939 |
0.442 |
|
1997 |
Demirkol E, Mehta S, Uzsoy R. A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems Journal of Heuristics. 3: 111-137. DOI: 10.1023/A:1009627429878 |
0.438 |
|
1997 |
Geiger CD, Kempf KG, Uzsoy R. A Tabu Search Approach to Scheduling an Automated Wet Etch Station Journal of Manufacturing Systems. 16: 102-116. DOI: 10.1016/S0278-6125(97)85674-9 |
0.457 |
|
1996 |
Holtsclaw HH, Uzsoy R. Machine criticality measures and subproblem solution procedures in shifting bottleneck methods: A computational study Journal of the Operational Research Society. 47: 666-677. DOI: 10.1057/Jors.1996.78 |
0.397 |
|
1996 |
Chand S, Traub R, Uzsoy R. An iterative heuristic for the single machine dynamic total completion time scheduling problem Computers and Operations Research. 23: 641-651. DOI: 10.1016/0305-0548(95)00071-2 |
0.46 |
|
1996 |
Ovacik IM, Uzsoy R. Decomposition methods for scheduling semiconductor testing facilities International Journal of Flexible Manufacturing Systems. 8: 357-388. DOI: 10.1007/Bf00170018 |
0.419 |
|
1996 |
Chand S, Traub R, Uzsoy R. Single-machine scheduling with dynamic arrivals: Decomposition results and an improved algorithm Naval Research Logistics. 43: 709-719. DOI: 10.1002/(Sici)1520-6750(199608)43:5<709::Aid-Nav7>3.0.Co;2-9 |
0.449 |
|
1995 |
Ovacik IM, Uzsoy R. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times International Journal of Production Research. 33: 3173-3192. DOI: 10.1080/00207549508904867 |
0.428 |
|
1995 |
Uzsoy R. Scheduling batch processing machines with incompatible job families International Journal of Production Research. 33: 2685-2708. DOI: 10.1080/00207549508904839 |
0.447 |
|
1995 |
Ashby JR, Uzsoy R. Scheduling and order release in a single-stage production system Journal of Manufacturing Systems. 14: 290-306. DOI: 10.1016/0278-6125(95)98881-6 |
0.356 |
|
1994 |
Uzsoy R, Lee CY, Martin-Vega LA. A review of production planning and scheduling models in the semiconductor industry part h: Shop-floor control Iie Transactions (Institute of Industrial Engineers). 26: 44-55. DOI: 10.1080/07408179408966627 |
0.378 |
|
1994 |
Lee CY, Lin CS, Uzsoy R, Wong CC. Implementation of a demand-pull system in a job shop environment International Journal of Production Research. 32: 2915-2927. DOI: 10.1080/00207549408957108 |
0.426 |
|
1994 |
Uzsoy R. Scheduling a single batch processing machine with non-identical job sizes International Journal of Production Research. 32: 1615-1635. DOI: 10.1080/00207549408957026 |
0.447 |
|
1994 |
Ovacik IM, Uzsoy R. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times International Journal of Production Research. 32: 1243-1263. DOI: 10.1080/00207549408956998 |
0.434 |
|
1994 |
Ulusoy G, Uzsoy R. A robust strategy approach to a strategic mobility problem European Journal of Operational Research. 79: 266-276. DOI: 10.1016/0377-2217(94)90357-3 |
0.431 |
|
1994 |
Ovacik IM, Uzsoy R. Exploiting shop floor status information to schedule complex job shops Journal of Manufacturing Systems. 13: 73-84. DOI: 10.1016/0278-6125(94)90023-X |
0.406 |
|
1993 |
Lee CY, Martin-Vega LA, Uzsoy R, Hinchman J. Implementation of a decision support system for scheduling semiconductor test operations Journal of Electronics Manufacturing. 3: 121-131. DOI: 10.1142/S0960313193000140 |
0.446 |
|
1993 |
Uzsoy R, Church LK, Ovacik IM, Hinchman J. Performance evaluation of dispatching rules for semiconductor testing operations Journal of Electronics Manufacturing. 3: 95-105. DOI: 10.1142/S0960313193000115 |
0.347 |
|
1993 |
Chandru V, Lee CY, Uzsoy R. Minimizing total completion time on batch processing machines International Journal of Production Research. 31: 2097-2121. DOI: 10.1080/00207549308956847 |
0.36 |
|
1993 |
Chandru V, Lee CY, Uzsoy R. Minimizing total completion time on a batch processing machine with job families Operations Research Letters. 13: 61-65. DOI: 10.1016/0167-6377(93)90030-K |
0.43 |
|
1992 |
Lee C, Uzsoy R, Martin-Vega LA. Efficient algorithms for scheduling semiconductor burn-in operations Operations Research. 40: 764-775. DOI: 10.1287/Opre.40.4.764 |
0.42 |
|
1992 |
Ulusoy G, Uzsoy R. Computer-Aided Process Planning and Material Requirements Planning: First Steps towards Computer-Integrated Manufacturing Interfaces. 22: 76-86. DOI: 10.1287/Inte.22.2.76 |
0.319 |
|
1992 |
Ovacik IM, Uzsoy R. A shifting bottleneck algorithm for scheduling semiconductor testing operations Journal of Electronics Manufacturing. 2: 119-134. DOI: 10.1142/S0960313192000157 |
0.393 |
|
1992 |
Church LK, Uzsoy R. Analysis of periodic and event-driven rescheduling policies in dynamic shops International Journal of Computer Integrated Manufacturing. 5: 153-163. DOI: 10.1080/09511929208944524 |
0.355 |
|
1992 |
Uzsoy R, Lee CY, Martin-Vega LA. A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning Iie Transactions (Institute of Industrial Engineers). 24: 47-60. DOI: 10.1080/07408179208964233 |
0.422 |
|
1992 |
Lee CY, Uzsoy R. A new dynamic programming algorithm for the parallel machines total weighted completion time problem Operations Research Letters. 11: 73-75. DOI: 10.1016/0167-6377(92)90035-2 |
0.385 |
|
1991 |
Uzsoy R, Martin-Vega LA, Lee CY, Leonard PA. Production Scheduling Algorithms for a Semiconductor Test Facility Ieee Transactions On Semiconductor Manufacturing. 4: 270-280. DOI: 10.1109/66.97809 |
0.438 |
|
Show low-probability matches. |