Reha Uzsoy - Publications

Affiliations: 
Purdue University, West Lafayette, IN, United States 
Area:
Operations Research, Industrial Engineering, Statistics

124 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Manda AB, Uzsoy R. A Simple Model of Capacity Contention During New Product Introductions Ieee Transactions On Semiconductor Manufacturing. 33: 240-251. DOI: 10.1109/Tsm.2020.2981412  0.453
2020 Ziarnetzky T, Monch L, Uzsoy R. Simulation-Based Performance Assessment of Production Planning Models With Safety Stock and Forecast Evolution in Semiconductor Wafer Fabrication Ieee Transactions On Semiconductor Manufacturing. 33: 1-12. DOI: 10.1109/Tsm.2019.2958526  0.444
2020 Bansal A, Uzsoy R. Constraint violation reduction search for 0–1 mixed integer linear programming problems Engineering Optimization. 1-18. DOI: 10.1080/0305215X.2020.1742710  0.342
2019 Uzsoy R. Editorial 2018 Best Paper Award Ieee Transactions On Semiconductor Manufacturing. 32: 139-139. DOI: 10.1109/Tsm.2019.2910984  0.348
2019 Gopalswamy K, Uzsoy R. A data-driven iterative refinement approach for estimating clearing functions from simulation models of production systems International Journal of Production Research. 57: 6013-6030. DOI: 10.1080/00207543.2018.1557351  0.35
2019 Kapadia MS, Starly B, Thomas A, Uzsoy R, Warsing D. Impact of Scheduling Policies on the Performance of an Additive Manufacturing Production System Procedia Manufacturing. 39: 447-456. DOI: 10.1016/J.Promfg.2020.01.388  0.403
2019 Gopalswamy K, Fathi Y, Uzsoy R. Valid inequalities for concave piecewise linear regression Operations Research Letters. 47: 52-58. DOI: 10.1016/J.Orl.2018.12.004  0.351
2018 Uzsoy R. Editorial 2017 Best Paper Award Ieee Transactions On Semiconductor Manufacturing. 31: 325-325. DOI: 10.1109/Tsm.2018.2852818  0.381
2018 Ziarnetzky T, Mönch L, Uzsoy R. Rolling horizon, multi-product production planning with chance constraints and forecast evolution for wafer fabs International Journal of Production Research. 56: 6112-6134. DOI: 10.1080/00207543.2018.1478461  0.407
2018 Uzsoy R, Fowler JW, Mönch L. A survey of semiconductor supply chain models Part II: demand planning, inventory management, and capacity planning International Journal of Production Research. 56: 4546-4564. DOI: 10.1080/00207543.2018.1424363  0.388
2018 Mönch L, Uzsoy R, Fowler JW. A survey of semiconductor supply chain models part III: master planning, production planning, and demand fulfilment International Journal of Production Research. 56: 4565-4584. DOI: 10.1080/00207543.2017.1401234  0.366
2018 Mönch L, Uzsoy R, Fowler JW. A survey of semiconductor supply chain models part I: semiconductor supply chains, strategic network design, and supply chain simulation International Journal of Production Research. 56: 4524-4545. DOI: 10.1080/00207543.2017.1401233  0.39
2018 Karagul HF, Warsing DP, Hodgson TJ, Kapadia MS, Uzsoy R. A comparison of mixed integer programming formulations of the capacitated lot-sizing problem International Journal of Production Research. 56: 7064-7084. DOI: 10.1080/00207543.2017.1401232  0.388
2018 Sengul Orgut I, Ivy JS, Uzsoy R, Hale C. Robust optimization approaches for the equitable and effective distribution of donated food European Journal of Operational Research. 269: 516-531. DOI: 10.1016/J.Ejor.2018.02.017  0.641
2018 Kang Y, Albey E, Uzsoy R. Rounding heuristics for multiple product dynamic lot-sizing in the presence of queueing behavior Computers & Operations Research. 100: 54-65. DOI: 10.1016/J.Cor.2018.07.019  0.48
2017 Albey E, Bilge Ü, Uzsoy R. Multi-dimensional clearing functions for aggregate capacity modelling in multi-stage production systems International Journal of Production Research. 55: 4164-4179. DOI: 10.1080/00207543.2016.1257169  0.381
2016 Albey E, Uzsoy R. Lead time modeling in production planning Proceedings - Winter Simulation Conference. 2016: 1996-2007. DOI: 10.1109/WSC.2015.7408315  0.308
2016 Kacar NB, Mönch L, Uzsoy R. Modeling Cycle Times in Production Planning Models for Wafer Fabrication Ieee Transactions On Semiconductor Manufacturing. 29: 153-167. DOI: 10.1109/Tsm.2016.2546314  0.455
2016 Fanti MP, Zhou U, Uzsoy R. Guest Editorial Special Section on Emerging Advances in Logistics Systems: Integrating Remote Sensing, IT, and Autonomy Ieee Transactions On Automation Science and Engineering. 13: 1420-1421. DOI: 10.1109/Tase.2016.2606861  0.35
2016 Lin PC, Uzsoy R. Chance-constrained formulations in rolling horizon production planning: an experimental study International Journal of Production Research. 1-16. DOI: 10.1080/00207543.2016.1165356  0.424
2016 Kefeli A, Uzsoy R. Identifying potential bottlenecks in production systems using dual prices from a mathematical programming model International Journal of Production Research. 54: 2000-2018. DOI: 10.1080/00207543.2015.1076182  0.426
2016 Yaylali E, Ivy JS, Uzsoy R, Samoff E, Meyer AM, Maillard JM. Modeling the effect of public health resources and alerting on the dynamics of pertussis spread Health Systems. 5: 81-97. DOI: 10.1057/Hs.2015.6  0.646
2016 Li M, Yang F, Uzsoy R, Xu J. A metamodel-based Monte Carlo simulation approach for responsive production planning of manufacturing systems Journal of Manufacturing Systems. 38: 114-133. DOI: 10.1016/j.jmsy.2015.11.004  0.308
2015 Albey E, Norouzi A, Kempf KG, Uzsoy R. Demand Modeling with Forecast Evolution: An Application to Production Planning Ieee Transactions On Semiconductor Manufacturing. 28: 374-384. DOI: 10.1109/Tsm.2015.2453792  0.435
2015 Orgut IS, Ivy J, Uzsoy R, Wilson JR. Modeling for the equitable and effective distribution of donated food under capacity constraints Iie Transactions (Institute of Industrial Engineers). 1-15. DOI: 10.1080/0740817X.2015.1063792  0.625
2015 Aouam T, Uzsoy R. Zero-order production planning models with stochastic demand and workload-dependent lead times International Journal of Production Research. 53: 1661-1679. DOI: 10.1080/00207543.2014.935514  0.471
2014 Kacar NB, Uzsoy R. Estimating Clearing Functions for Production Resources Using Simulation Optimization Ieee Transactions On Automation Science and Engineering. DOI: 10.1109/Tase.2014.2303316  0.358
2014 Norouzi A, Uzsoy R. Modeling the evolution of dependency between demands, with application to inventory planning Iie Transactions (Institute of Industrial Engineers). 46: 55-66. DOI: 10.1080/0740817X.2013.803637  0.416
2014 Albey E, Bilge U, Uzsoy R. An exploratory study of disaggregated clearing functions for production systems with multiple products International Journal of Production Research. 52: 5301-5322. DOI: 10.1080/00207543.2014.899442  0.397
2014 Kacar NB, Uzsoy R. A comparison of multiple linear regression approaches for fitting clearing functions to empirical data International Journal of Production Research. 52: 3164-3184. DOI: 10.1080/00207543.2013.864052  0.346
2014 Godinho Filho M, Uzsoy R. Assessing the impact of alternative continuous improvement programmes in a flow shop using system dynamics International Journal of Production Research. 52: 3014-3031. DOI: 10.1080/00207543.2013.860249  0.365
2014 Kang Y, Albey E, Hwang S, Uzsoy R. The impact of lot-sizing in multiple product environments with congestion Journal of Manufacturing Systems. 33: 436-444. DOI: 10.1016/J.Jmsy.2014.04.003  0.703
2014 Giddings AP, Rardin RL, Uzsoy R. Statistical optimum estimation techniques for combinatorial optimization problems: A review and critique Journal of Heuristics. 20: 329-358. DOI: 10.1007/S10732-014-9243-4  0.325
2013 Kacar NB, Monch L, Uzsoy R. A comparison of production planning formulations with exogenous cycle time estimates using a large-scale wafer fab model Proceedings of the 2013 Winter Simulation Conference - Simulation: Making Decisions in a Complex World, Wsc 2013. 3731-3744. DOI: 10.1109/WSC.2013.6721733  0.316
2013 Kacar NB, Mönch L, Uzsoy R. Planning wafer starts using nonlinear clearing functions: A large-scale experiment Ieee Transactions On Semiconductor Manufacturing. 26: 602-612. DOI: 10.1109/Tsm.2013.2283038  0.41
2013 Filho MG, Uzsoy R. The impact of simultaneous continuous improvement in setup time and repair time on manufacturing cycle times under uncertain conditions International Journal of Production Research. 51: 447-464. DOI: 10.1080/00207543.2011.652261  0.412
2012 Kim S, Uzsoy R. Modeling and analysis of integrated planning of production and engineering process improvement Asmc (Advanced Semiconductor Manufacturing Conference) Proceedings. 201-207. DOI: 10.1109/Tsm.2013.2261099  0.373
2012 Kacar NB, Irdem DF, Uzsoy R. An experimental comparison of production planning using clearing functions and iterative linear programming-simulation algorithms Ieee Transactions On Semiconductor Manufacturing. 25: 104-117. DOI: 10.1109/Tsm.2011.2176560  0.417
2011 Liu J, Li C, Yang F, Wan H, Uzsoy R. Production planning for semiconductor manufacturing via simulation optimization Proceedings - Winter Simulation Conference. 3612-3622. DOI: 10.1109/WSC.2011.6148055  0.341
2011 Crist K, Uzsoy R. Prioritising production and engineering lots in wafer fabrication facilities: A simulation study International Journal of Production Research. 49: 3105-3125. DOI: 10.1080/00207541003801259  0.386
2011 Kefeli A, Uzsoy R, Fathi Y, Kay M. Using a mathematical programming model to examine the marginal price of capacitated resources International Journal of Production Economics. 131: 383-391. DOI: 10.1016/J.Ijpe.2010.03.018  0.394
2011 Godinho Filho M, Uzsoy R. The effect of shop floor continuous improvement programs on the lot size-cycle time relationship in a multi-product single-machine environment International Journal of Advanced Manufacturing Technology. 52: 669-681. DOI: 10.1007/S00170-010-2770-8  0.39
2011 Missbauer H, Uzsoy R. Optimization models of production planning problems International Series in Operations Research and Management Science. 151: 437-507. DOI: 10.1007/978-1-4419-6485-4_16  0.305
2011 Jarugumilli K, Uzsoy R. A nonlinear knapsack problem arising in location problems with safety stocks 61st Annual Iie Conference and Expo Proceedings 0.324
2010 Irdem DF, Kacar NB, Uzsoy R. An exploratory analysis of two iterative linear programming-simulation approaches for production planning Ieee Transactions On Semiconductor Manufacturing. 23: 442-455. DOI: 10.1109/Tsm.2010.2051751  0.437
2009 Godinho Filho M, Uzsoy R. Effect of lot size reduction and continuous improvement on work in process and utilization: Study using a combined system dynamics and factory physics approach Producao. 19: 214-229. DOI: 10.1590/S0103-65132009000100014  0.376
2009 Sourirajan K, Ozsen L, Uzsoy R. A genetic algorithm for a single product network design model with lead time and safety stock considerations European Journal of Operational Research. 197: 599-608. DOI: 10.1016/J.Ejor.2008.07.038  0.792
2009 Kim S, Uzsoy R. Heuristics for capacity planning problems with congestion Computers and Operations Research. 36: 1924-1934. DOI: 10.1016/J.Cor.2008.06.006  0.53
2009 Orcun S, Uzsoy R, Kempf KG. An integrated production planning model with load-dependent lead-times and safety stocks Computers and Chemical Engineering. 33: 2159-2163. DOI: 10.1016/J.Compchemeng.2009.07.010  0.486
2009 Asmundsson J, Rardin RL, Turkseven CH, Uzsoy R. Production planning with resources subject to congestion Naval Research Logistics. 56: 142-157. DOI: 10.1002/Nav.20335  0.407
2008 Chien CF, Dauzère-Pérès S, Ehm H, Fowler JW, Jiang Z, Krishnaswamy S, Mönch L, Uzsoy R. Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes Proceedings - Winter Simulation Conference. 2093-2099. DOI: 10.1504/Ejie.2011.041616  0.375
2008 Irdem DF, Kacar NB, Uzsoy R. An experimental study of an iterative simulation-optimization algorithm for production planning Proceedings - Winter Simulation Conference. 2176-2184. DOI: 10.1109/WSC.2008.4736317  0.3
2008 Kim S, Uzsoy RM. Integrated planning of production and engineering process improvement Ieee Transactions On Semiconductor Manufacturing. 21: 390-398. DOI: 10.1109/Tsm.2008.2001215  0.36
2008 Kim S, Uzsoy R. Exact and heuristic procedures for capacity expansion problems with congestion Iie Transactions (Institute of Industrial Engineers). 40: 1185-1197. DOI: 10.1080/07408170802322978  0.533
2008 Upasani A, Uzsoy R. Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: A simulation study International Journal of Production Research. 46: 5883-5905. DOI: 10.1080/00207540601156215  0.415
2008 Geiger CD, Uzsoy R. Learning effective dispatching rules for batch processor scheduling International Journal of Production Research. 46: 1431-1454. DOI: 10.1080/00207540600993360  0.755
2008 Uzsoy R, Velásquez JD. Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times Computers and Operations Research. 35: 2018-2033. DOI: 10.1016/J.Cor.2006.10.003  0.439
2008 Upasani A, Uzsoy R. Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions Annals of Operations Research. 161: 171-188. DOI: 10.1007/S10479-007-0294-X  0.714
2007 Orcun S, Çetinkaya S, Uzsoy R. Determining safety stocks in the presence of workload-dependent lead times Proceedings - Winter Simulation Conference. 1691-1698. DOI: 10.1109/WSC.2007.4419791  0.352
2007 Orcun S, Asmundsson JM, Uzsoy R, Clement JP, Pekny JF, Rardin RL. Supply chain optimisation and protocol environment (SCOPE) for rapid prototyping and analysis of complex supply chains Production Planning and Control. 18: 388-406. DOI: 10.1080/09537280701417116  0.362
2007 Sourirajan K, Ozsen L, Uzsoy R. A single-product network design model with lead time and safety stock considerations Iie Transactions (Institute of Industrial Engineers). 39: 411-424. DOI: 10.1080/07408170600941631  0.795
2007 Malve S, Uzsoy R. A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families Computers and Operations Research. 34: 3016-3028. DOI: 10.1016/J.Cor.2005.11.011  0.422
2007 Sourirajan K, Uzsoy R. Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication Journal of Scheduling. 10: 41-65. DOI: 10.1007/S10951-006-0325-5  0.793
2007 Varma VA, Uzsoy R, Pekny J, Blau G. Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry Journal of Heuristics. 13: 403-433. DOI: 10.1007/S10732-007-9016-4  0.437
2007 Eskigun E, Uzsoy R, Preckel PV, Beaujon G, Krishnan S, Tew JD. Outbound supply chain network design with mode selection and lead time considerations Naval Research Logistics. 54: 282-300. DOI: 10.1002/Nav.20205  0.754
2006 Orcun S, Uzsoy R, Kempf K. Using system dynamics simulations to compare capacity models for production planning Proceedings - Winter Simulation Conference. 1855-1862. DOI: 10.1109/WSC.2006.322966  0.329
2006 Upasani AA, Uzsoy R, Sourirajan K. A problem reduction approach for scheduling semiconductor wafer fabrication facilities Ieee Transactions On Semiconductor Manufacturing. 19: 216-225. DOI: 10.1109/Tsm.2006.873510  0.445
2006 Asmundsson J, Rardin RL, Uzsoy R. Tractable nonlinear production planning models for semiconductor wafer fabrication facilities Ieee Transactions On Semiconductor Manufacturing. 19: 95-111. DOI: 10.1109/Tsm.2005.863214  0.404
2006 Geiger CD, Uzsoy R, Aytuǧ H. Rapid modeling and discovery of priority dispatching rules: An autonomous learning approach Journal of Scheduling. 9: 7-34. DOI: 10.1007/S10951-006-5591-8  0.759
2005 Barua A, Raghavan N, Upasani A, Uzsoy R. Implementing global factory schedules in the face of stochastic disruptions International Journal of Production Research. 43: 793-818. DOI: 10.1080/00207540412331282024  0.449
2005 Eskigun E, Uzsoy R, Preckel PV, Beaujon G, Krishnan S, Tew JD. Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers European Journal of Operational Research. 165: 182-206. DOI: 10.1016/J.Ejor.2003.11.029  0.753
2005 Aytug H, Lawley MA, McKay K, Mohan S, Uzsoy R. Executing production schedules in the face of uncertainties: A review and some future directions European Journal of Operational Research. 161: 86-110. DOI: 10.1016/J.Ejor.2003.08.027  0.403
2005 Akçali E, Üngör A, Uzsoy R. Short-term capacity allocation problem with tool and setup constraints Naval Research Logistics. 52: 754-764. DOI: 10.1002/Nav.20112  0.782
2003 Aytug H, Barua A, Lawley M, Uzsoy R. Observations on the interactions among deadlock avoidance policies and dispatching rules in automated manufacturing systems International Journal of Production Research. 41: 81-95. DOI: 10.1080/00207540210163955  0.312
2003 Aytug H, Kempf K, Uzsoy R. Measures of subproblem criticality in decomposition algorithms for shop scheduling International Journal of Production Research. 41: 865-882. DOI: 10.1080/0020754021000037856  0.433
2002 Wang CS, Uzsoy R. A genetic algorithm to minimize maximum lateness on a batch processing machine Computers and Operations Research. 29: 1621-1640. DOI: 10.1016/S0305-0548(01)00031-4  0.763
2001 Akçall E, Davis M, Hamlin RD, McCullough T, Teyner T, Uzsoy R. A decision support system for spare parts management in a wafer fabrication facility Ieee Transactions On Semiconductor Manufacturing. 14: 76-78. DOI: 10.1109/66.909657  0.307
2001 Horiguchi K, Raghavan N, Uzsoy R, Venkateswaran S. Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility International Journal of Production Research. 39: 825-842. DOI: 10.1080/00207540010010253  0.337
2001 Rardin RL, Uzsoy R. Experimental evaluation of heuristic optimization algorithms: A tutorial Journal of Heuristics. 7: 261-304. DOI: 10.1023/A:1011319115230  0.426
2000 Nemoto K, Akcali E, Uzsoy R. Quantifying the benefits of cycle time reduction in semiconductor wafer fabrication Ieee Transactions On Electronics Packaging Manufacturing. 23: 3. DOI: 10.1109/6104.827525  0.761
2000 Uzsoy R, Wang CS. Performance of decomposition procedures for job shop scheduling problems with bottleneck machines International Journal of Production Research. 38: 1271-1286. DOI: 10.1080/002075400188843  0.752
2000 Ovacik IM, Rajagopalan S, Uzsoy R. Integrating interval estimates of global optima and local search methods for combinatorial optimization problems Journal of Heuristics. 6: 481-500. DOI: 10.1023/A:1009669326107  0.372
2000 Kempf K, Uzsoy R, Smith S, Gary K. Evaluation and comparison of production schedules Computers in Industry. 42: 203-220. DOI: 10.1016/S0166-3615(99)00071-8  0.404
2000 Demirkol E, Uzsoy R. Decomposition methods for reentrant flow shops with sequence-dependent setup times Journal of Scheduling. 3: 155-177. DOI: 10.1002/(Sici)1099-1425(200005/06)3:3<155::Aid-Jos39>3.0.Co;2-E  0.395
2000 Akçali E, Uzsoy R. A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography Proceedings of the Ieee/Cpmt International Electronics Manufacturing Technology (Iemt) Symposium. 374-381.  0.332
1999 Lee CY, Uzsoy R. Minimizing makespan on a single batch processing machine with dynamic job arrivals International Journal of Production Research. 37: 219-236. DOI: 10.1080/002075499192020  0.43
1999 O'Donovan R, Uzsoy R, McKay KN. Predictable scheduling of a single machine with breakdowns and sensitive jobs International Journal of Production Research. 37: 4217-4233. DOI: 10.1080/002075499189745  0.424
1999 Meacham A, Uzsoy R, Venkatadri U. Optimal disassembly configurations for single and multiple products Journal of Manufacturing Systems. 18: 311-322. DOI: 10.1016/S0278-6125(00)87634-7  0.463
1999 Uzsoy R. Manufacturing scheduling: Are the times a-changin'? Journal of Manufacturing Systems. 18. DOI: 10.1016/S0278-6125(00)86627-3  0.432
1999 Woo M, Uzsoy R, Ghafoor A. Media Streams Scheduling for Synchronization in Distributed Multimedia Systems Journal of Parallel and Distributed Computing. 56: 272-295. DOI: 10.1006/jpdc.1998.1526  0.334
1998 Mehta SV, Uzsoy R. Minimizing total tardiness on a batch processing machine with incompatible job families Iie Transactions (Institute of Industrial Engineers). 30: 165-178. DOI: 10.1080/07408179808966448  0.392
1998 Beril Toktay L, Uzsoy R. A capacity allocation problem with integer side constraints European Journal of Operational Research. 109: 170-182. DOI: 10.1016/S0377-2217(98)80011-8  0.481
1998 Demirkol E, Mehta S, Uzsoy R. Benchmarks for shop scheduling problems European Journal of Operational Research. 109: 137-141. DOI: 10.1016/S0377-2217(97)00019-2  0.399
1998 Kempf KG, Uzsoy R, Wang CS. Scheduling a Single Batch Processing Machine with Secondary Resource Constraints Journal of Manufacturing Systems. 17: 37-51. DOI: 10.1016/S0278-6125(98)80008-3  0.764
1997 Lee C, Uzsoy R, Martin-Vega LA. Letter to the Editor---Addendum to “Efficient Algorithms for Scheduling Semiconductor Burn-In Operations Operations Research. 45: 153-154. DOI: 10.1287/Opre.45.1.153  0.305
1997 Uzsoy R, Yang Y. Minimizing total weighted completion time on a single batch processing machine Production and Operations Management. 6: 57-73. DOI: 10.1111/J.1937-5956.1997.Tb00415.X  0.441
1997 Chand S, Traub R, Uzsoy R. Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates Annals of Operations Research. 70: 115-125. DOI: 10.1023/A:1018961818782  0.424
1997 Unal AT, Uzsoy R, Kiran AS. Rescheduling on a single machine with part-type dependent setup times and deadlines Annals of Operations Research. 70: 93-113. DOI: 10.1023/A:1018955111939  0.442
1997 Demirkol E, Mehta S, Uzsoy R. A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems Journal of Heuristics. 3: 111-137. DOI: 10.1023/A:1009627429878  0.438
1997 Geiger CD, Kempf KG, Uzsoy R. A Tabu Search Approach to Scheduling an Automated Wet Etch Station Journal of Manufacturing Systems. 16: 102-116. DOI: 10.1016/S0278-6125(97)85674-9  0.457
1996 Holtsclaw HH, Uzsoy R. Machine criticality measures and subproblem solution procedures in shifting bottleneck methods: A computational study Journal of the Operational Research Society. 47: 666-677. DOI: 10.1057/Jors.1996.78  0.397
1996 Chand S, Traub R, Uzsoy R. An iterative heuristic for the single machine dynamic total completion time scheduling problem Computers and Operations Research. 23: 641-651. DOI: 10.1016/0305-0548(95)00071-2  0.46
1996 Ovacik IM, Uzsoy R. Decomposition methods for scheduling semiconductor testing facilities International Journal of Flexible Manufacturing Systems. 8: 357-388. DOI: 10.1007/Bf00170018  0.419
1996 Chand S, Traub R, Uzsoy R. Single-machine scheduling with dynamic arrivals: Decomposition results and an improved algorithm Naval Research Logistics. 43: 709-719. DOI: 10.1002/(Sici)1520-6750(199608)43:5<709::Aid-Nav7>3.0.Co;2-9  0.449
1995 Ovacik IM, Uzsoy R. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times International Journal of Production Research. 33: 3173-3192. DOI: 10.1080/00207549508904867  0.428
1995 Uzsoy R. Scheduling batch processing machines with incompatible job families International Journal of Production Research. 33: 2685-2708. DOI: 10.1080/00207549508904839  0.447
1995 Ashby JR, Uzsoy R. Scheduling and order release in a single-stage production system Journal of Manufacturing Systems. 14: 290-306. DOI: 10.1016/0278-6125(95)98881-6  0.356
1994 Uzsoy R, Lee CY, Martin-Vega LA. A review of production planning and scheduling models in the semiconductor industry part h: Shop-floor control Iie Transactions (Institute of Industrial Engineers). 26: 44-55. DOI: 10.1080/07408179408966627  0.378
1994 Lee CY, Lin CS, Uzsoy R, Wong CC. Implementation of a demand-pull system in a job shop environment International Journal of Production Research. 32: 2915-2927. DOI: 10.1080/00207549408957108  0.426
1994 Uzsoy R. Scheduling a single batch processing machine with non-identical job sizes International Journal of Production Research. 32: 1615-1635. DOI: 10.1080/00207549408957026  0.447
1994 Ovacik IM, Uzsoy R. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times International Journal of Production Research. 32: 1243-1263. DOI: 10.1080/00207549408956998  0.434
1994 Ulusoy G, Uzsoy R. A robust strategy approach to a strategic mobility problem European Journal of Operational Research. 79: 266-276. DOI: 10.1016/0377-2217(94)90357-3  0.431
1994 Ovacik IM, Uzsoy R. Exploiting shop floor status information to schedule complex job shops Journal of Manufacturing Systems. 13: 73-84. DOI: 10.1016/0278-6125(94)90023-X  0.406
1993 Lee CY, Martin-Vega LA, Uzsoy R, Hinchman J. Implementation of a decision support system for scheduling semiconductor test operations Journal of Electronics Manufacturing. 3: 121-131. DOI: 10.1142/S0960313193000140  0.446
1993 Uzsoy R, Church LK, Ovacik IM, Hinchman J. Performance evaluation of dispatching rules for semiconductor testing operations Journal of Electronics Manufacturing. 3: 95-105. DOI: 10.1142/S0960313193000115  0.347
1993 Chandru V, Lee CY, Uzsoy R. Minimizing total completion time on batch processing machines International Journal of Production Research. 31: 2097-2121. DOI: 10.1080/00207549308956847  0.36
1993 Chandru V, Lee CY, Uzsoy R. Minimizing total completion time on a batch processing machine with job families Operations Research Letters. 13: 61-65. DOI: 10.1016/0167-6377(93)90030-K  0.43
1992 Lee C, Uzsoy R, Martin-Vega LA. Efficient algorithms for scheduling semiconductor burn-in operations Operations Research. 40: 764-775. DOI: 10.1287/Opre.40.4.764  0.42
1992 Ulusoy G, Uzsoy R. Computer-Aided Process Planning and Material Requirements Planning: First Steps towards Computer-Integrated Manufacturing Interfaces. 22: 76-86. DOI: 10.1287/Inte.22.2.76  0.319
1992 Ovacik IM, Uzsoy R. A shifting bottleneck algorithm for scheduling semiconductor testing operations Journal of Electronics Manufacturing. 2: 119-134. DOI: 10.1142/S0960313192000157  0.393
1992 Church LK, Uzsoy R. Analysis of periodic and event-driven rescheduling policies in dynamic shops International Journal of Computer Integrated Manufacturing. 5: 153-163. DOI: 10.1080/09511929208944524  0.355
1992 Uzsoy R, Lee CY, Martin-Vega LA. A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning Iie Transactions (Institute of Industrial Engineers). 24: 47-60. DOI: 10.1080/07408179208964233  0.422
1992 Lee CY, Uzsoy R. A new dynamic programming algorithm for the parallel machines total weighted completion time problem Operations Research Letters. 11: 73-75. DOI: 10.1016/0167-6377(92)90035-2  0.385
1991 Uzsoy R, Martin-Vega LA, Lee CY, Leonard PA. Production Scheduling Algorithms for a Semiconductor Test Facility Ieee Transactions On Semiconductor Manufacturing. 4: 270-280. DOI: 10.1109/66.97809  0.438
Show low-probability matches.