Chung-Lun Li - Publications

Affiliations: 
Hong Kong Polytechnic University (Hong Kong) 
Area:
Operations Research, Industrial Engineering, Computer Science

76 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Li C, Li F. Rescheduling production and outbound deliveries when transportation service is disrupted European Journal of Operational Research. 286: 138-148. DOI: 10.1016/J.Ejor.2020.03.033  0.402
2018 Xu X, Li C, Xu Z. Integrated train timetabling and locomotive assignment Transportation Research Part B-Methodological. 117: 573-593. DOI: 10.1016/J.Trb.2018.09.015  0.371
2016 Ding Y, Jia S, Gu T, Li CL. SGICT builds an optimization-based system for daily berth planning Interfaces. 46: 281-296. DOI: 10.1287/Inte.2016.0848  0.347
2016 Li C, Li Q. Polynomial-Time Solvability of Dynamic Lot Size Problems Asia-Pacific Journal of Operational Research. 33: 1-20. DOI: 10.1142/S0217595916500184  0.412
2016 Li Q, Guo P, Li C, Song JJ. Equilibrium Joining Strategies and Optimal Control of a Make-to-Stock Queue Production and Operations Management. 25: 1513-1527. DOI: 10.1111/Poms.12565  0.37
2016 Li CL, Lee K. A note on scheduling jobs with equal processing times and inclusive processing set restrictions Journal of the Operational Research Society. 67: 83-86. DOI: 10.1057/Jors.2015.56  0.455
2016 Leung JY-, Li C. Scheduling with processing set restrictions: A literature update International Journal of Production Economics. 175: 1-11. DOI: 10.1016/J.Ijpe.2014.09.038  0.351
2016 Hall NG, Leung JYT, Li CL. Multitasking via alternate and shared processing: Algorithms and complexity Discrete Applied Mathematics. 208: 41-58. DOI: 10.1016/J.Dam.2016.03.018  0.462
2015 Hall NG, Leung JYT, Li CL. The Effects of Multitasking on Operations Scheduling Production and Operations Management. 24: 1248-1265. DOI: 10.1111/Poms.12331  0.518
2015 Matta RED, Hsu VN, Li C. Coordinated production and delivery for an exporter Iie Transactions. 47: 373-391. DOI: 10.1080/0740817X.2014.928961  0.344
2015 Li C, Li Q. Scheduling Jobs with Release Dates, Equal Processing Times, and Inclusive Processing Set Restrictions Journal of the Operational Research Society. 66: 516-523. DOI: 10.1057/Jors.2014.22  0.456
2015 Li C. Improved algorithms for single-machine common due window assignment and scheduling with batch deliveries Theoretical Computer Science. 570: 30-39. DOI: 10.1016/J.Tcs.2014.12.021  0.512
2015 Ou J, Zhong X, Li CL. Faster algorithms for single machine scheduling with release dates and rejection Information Processing Letters. DOI: 10.1016/J.Ipl.2016.02.008  0.442
2012 Xu D, Li C, Han Q. A note on parallel-machine due-window assignment Journal of the Operational Research Society. 63: 821-825. DOI: 10.1057/Jors.2011.75  0.489
2012 Xu D, Li C, Leung JY-. Berth allocation with time-dependent physical limitations on vessels European Journal of Operational Research. 216: 47-56. DOI: 10.1016/J.Ejor.2011.07.012  0.484
2012 Li C, Ou J, Hsu VN. Dynamic lot sizing with all‐units discount and resales Naval Research Logistics. 59: 230-243. DOI: 10.1002/Nav.21484  0.415
2011 Pang KW, Xu Z, Li CL. Ship routing problem with berthing time clash avoidance constraints International Journal of Production Economics. 131: 752-762. DOI: 10.1016/J.Ijpe.2011.03.013  0.465
2011 Kellerer H, Leung JY-, Li C. Multiple subset sum with inclusive assignment set restrictions Naval Research Logistics. 58: 546-563. DOI: 10.1002/Nav.20466  0.38
2010 Ou J, Hsu VN, Li C. Scheduling Truck Arrivals at an Air Cargo Terminal Production and Operations Management. 19: 83-97. DOI: 10.1111/J.1937-5956.2009.01068.X  0.453
2010 Li C, Wang X. Scheduling parallel machines with inclusive processing set restrictions and job release times European Journal of Operational Research. 200: 702-710. DOI: 10.1016/J.Ejor.2009.02.011  0.465
2010 Xu Z, Xu L, Li C. Approximation results for min‐max path cover problems in vehicle routing Naval Research Logistics. 57: 728-748. DOI: 10.1002/Nav.20434  0.43
2009 Li C, Erlebacher SJ, Kropp DH. Investment In Setup Cost, Lead Time, And Demand Predictability Improvement In The Eoq Model Production and Operations Management. 6: 341-351. DOI: 10.1111/J.1937-5956.1997.Tb00478.X  0.352
2009 Li C, Cheng TCE. An Economic Production Quantity Model With Learning And Forgetting Considerations Production and Operations Management. 3: 118-132. DOI: 10.1111/J.1937-5956.1994.Tb00114.X  0.353
2009 Halman N, Li CL, Simchi-Levi D. Fully polynomial-time approximation schemes for time-cost tradeoff problems in series-parallel project networks Operations Research Letters. 37: 239-244. DOI: 10.1016/J.Orl.2009.03.002  0.427
2009 Li C. A new solution method for the finite-horizon discrete-time EOQ problem European Journal of Operational Research. 197: 412-414. DOI: 10.1016/J.Ejor.2008.06.007  0.399
2008 Halman N, Klabjan D, Li CL, Orlin J, Simchi-Levi D. Fully Polynomial Time Approximation Schemes for stochastic dynamic programs Proceedings of the Annual Acm-Siam Symposium On Discrete Algorithms. 700-709. DOI: 10.1137/130925153  0.39
2008 Chen Z, Li C. Scheduling with subcontracting options Iie Transactions. 40: 1171-1184. DOI: 10.1080/07408170801975057  0.443
2008 Li C. A note on unrelated parallel machine scheduling with time-dependent processing times Journal of the Operational Research Society. 59: 1696-1697. DOI: 10.1057/Palgrave.Jors.2602648  0.403
2008 Leung JY-, Li C. Scheduling with processing set restrictions: A survey International Journal of Production Economics. 116: 251-262. DOI: 10.1016/J.Ijpe.2008.09.003  0.489
2008 Cheung BK-, Choy KL, Li C, Shi W, Tang J. Dynamic Routing Model and Solution Methods for Fleet Management with Mobile Technologies International Journal of Production Economics. 113: 694-705. DOI: 10.1016/J.Ijpe.2007.10.018  0.361
2008 Leung JY-, Li C. An asymptotic approximation scheme for the concave cost bin packing problem European Journal of Operational Research. 191: 582-586. DOI: 10.1016/J.Ejor.2007.08.031  0.418
2008 Li C, Mosheiov G, Yovel U. Technical Note: An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs Computers & Operations Research. 35: 3612-3619. DOI: 10.1016/J.Cor.2007.03.006  0.462
2008 Ou J, Leung JY-, Li C. Scheduling parallel machines with inclusive processing set restrictions Naval Research Logistics. 55: 328-338. DOI: 10.1002/Nav.20286  0.489
2007 Li CL, Ou J. Coordinated scheduling of customer orders with decentralized machine locations Iie Transactions (Institute of Industrial Engineers). 39: 899-909. DOI: 10.1080/07408170600972990  0.48
2007 Li C, Vairaktarakis G. Coordinating Production and Distribution of Jobs with Bundling Operations Iie Transactions. 39: 203-215. DOI: 10.1080/07408170600735561  0.445
2006 Li C. Scheduling unit-length jobs with machine eligibility restrictions European Journal of Operational Research. 174: 1325-1328. DOI: 10.1016/J.Ejor.2005.03.023  0.481
2006 Li C, Chen Z. Bin‐packing problem with concave costs of bin utilization Naval Research Logistics. 53: 298-308. DOI: 10.1002/Nav.20142  0.426
2005 Hsu VN, Li C, Xiao W. Dynamic lot size problems with one-way product substitution Iie Transactions. 37: 201-215. DOI: 10.1080/07408170590899607  0.395
2005 Li C, Vairaktarakis GL, Lee C. Machine scheduling with deliveries to multiple customer locations European Journal of Operational Research. 164: 39-51. DOI: 10.1016/J.Ejor.2003.11.022  0.499
2005 Li C, Wan G. Improved algorithm for maximizing service of carousel storage Computers & Operations Research. 32: 2147-2150. DOI: 10.1016/J.Cor.2004.02.005  0.383
2005 Li C, Ou J. Machine scheduling with pickup and delivery Naval Research Logistics. 52: 617-630. DOI: 10.1002/Nav.20101  0.498
2004 Li C, Hsu VN, Xiao W. Dynamic Lot Sizing with Batch Ordering and Truckload Discounts Operations Research. 52: 639-654. DOI: 10.1287/Opre.1040.0121  0.424
2004 Caglar D, Li CL, Simchi-Levi D. Two-echelon spare parts inventory system subject to a service constraint Iie Transactions (Institute of Industrial Engineers). 36: 655-666. DOI: 10.1080/07408170490278265  0.409
2004 Li C, Vairaktarakis GL. Loading and unloading operations in container terminals Iie Transactions. 36: 287-297. DOI: 10.1080/07408170490247340  0.422
2004 Li C, Xiao W. Lot streaming with supplier–manufacturer coordination Naval Research Logistics. 51: 522-542. DOI: 10.1002/Nav.20013  0.371
2003 Liu J, Li C, Chan C. Mixed truck delivery systems with both hub-and-spoke and direct shipment Transportation Research Part E-Logistics and Transportation Review. 39: 325-339. DOI: 10.1016/S1366-5545(03)00005-X  0.322
2002 Cheung RK, Li C, Lin W. Interblock Crane Deployment in Container Terminals Transportation Science. 36: 79-93. DOI: 10.1287/Trsc.36.1.79.568  0.425
2002 Xiao W, Li C. Approximation algorithms for common due date assignment and job scheduling on parallel machines Iie Transactions. 34: 467-477. DOI: 10.1023/A:1013567219570  0.507
2002 Guan Y, Xiao W, Cheung RK, Li C. A multiprocessor task scheduling model for berth allocation: heuristic and worst-case analysis Operations Research Letters. 30: 343-350. DOI: 10.1016/S0167-6377(02)00147-5  0.499
2001 Wan G, Yen BP-, Li C. Single machine scheduling to minimize total compression plus weighted flow cost is NP-hard Information Processing Letters. 79: 273-280. DOI: 10.1016/S0020-0190(01)00143-0  0.445
2001 Bish EK, Leong TY, Li CL, Ng JWC, Simchi-Levi D. Analysis of a new vehicle scheduling and location problem Naval Research Logistics. 48: 363-385. DOI: 10.1002/Nav.1024  0.472
1999 Li C, Kouvelis P. Flexible and Risk-Sharing Supply Contracts Under Price Uncertainty Management Science. 45: 1378-1398. DOI: 10.1287/Mnsc.45.10.1378  0.314
1999 Li C, Cheng TCE. Due-date determination with resequencing Iie Transactions. 31: 183-188. DOI: 10.1080/07408179908969817  0.45
1998 Li C, Cai X, Lee CY. Scheduling with multiple-job-on-one-processor pattern Iie Transactions. 30: 433-445. DOI: 10.1080/07408179808966484  0.506
1998 Cai X, Lee CY, Li C. Minimizing total completion time in two‐processor task systems with prespecified processor allocations Naval Research Logistics. 45: 231-242. DOI: 10.1002/(Sici)1520-6750(199803)45:2<231::Aid-Nav7>3.0.Co;2-9  0.452
1998 Cheng TCE, Chen Z, Li C, Lin BM-. Scheduling to minimize the total compression and late costs Naval Research Logistics. 45: 67-82. DOI: 10.1002/(Sici)1520-6750(199802)45:1<67::Aid-Nav4>3.0.Co;2-J  0.518
1997 Eynan A, Li C. Lot-splitting decisions and learning effects Iie Transactions. 29: 139-146. DOI: 10.1023/A:1018554725338  0.381
1997 Li C, Lee CY. Scheduling with agreeable release times and due dates on a batch processing machine European Journal of Operational Research. 96: 564-569. DOI: 10.1016/0377-2217(95)00332-0  0.492
1996 Cheng TCE, Chen ZL, Li C. Parallel-machine scheduling with controllable processing times Iie Transactions. 28: 177-180. DOI: 10.1080/07408179608966263  0.483
1996 Cheng TCE, Chen ZL, Li C. Single-machine scheduling with trade-off between number of tardy jobs and resource allocation Operations Research Letters. 19: 237-242. DOI: 10.1016/S0167-6377(96)00035-1  0.482
1996 Lee C, Li C. On the fixed interval due-date scheduling problem Discrete Applied Mathematics. 68: 101-117. DOI: 10.1016/0166-218X(95)00049-W  0.553
1995 Li C. Scheduling to minimize the total resource consumption with a constraint on the sum of completion times European Journal of Operational Research. 80: 381-388. DOI: 10.1016/0377-2217(93)E0255-V  0.506
1995 Li C, Cheng TCE, Chen Z-. Single-machine scheduling to minimize the weighted number of early and tardy agreeable jobs Computers & Operations Research. 22: 205-219. DOI: 10.1016/0305-0548(94)E0012-V  0.521
1995 Li C. A heuristic for parallel machine scheduling with agreeable due dates to minimize the number of late jobs Computers & Operations Research. 22: 277-283. DOI: 10.1016/0305-0548(94)00027-6  0.485
1995 Li C, Sewell EC, Cheng TCE. Scheduling to minimize release-time resource consumption and tardiness penalties Naval Research Logistics. 42: 949-966. DOI: 10.1002/1520-6750(199509)42:6<949::Aid-Nav3220420607>3.0.Co;2-3  0.506
1994 Li C. Scheduling with resource-dependent release dates: a comparison of two different resource consumption functions Naval Research Logistics. 41: 807-819. DOI: 10.1002/1520-6750(199410)41:6<807::Aid-Nav3220410609>3.0.Co;2-8  0.456
1994 Li C, Cheng TCE. The parallel machine min-max weighted absolute lateness scheduling problem Naval Research Logistics. 41: 33-46. DOI: 10.1002/1520-6750(199402)41:1<33::Aid-Nav3220410104>3.0.Co;2-S  0.498
1993 Bramel J, Li C, Simchi-Levi D. Probabilistic analysis of a vehicle routing problem with time windows American Journal of Mathematical and Management Sciences. 13: 267-322. DOI: 10.1080/01966324.1993.10737360  0.415
1993 Li C, Chen ZL, Cheng TCE. A note on one-processor scheduling with asymmetric earliness and tardiness penalties Operations Research Letters. 13: 45-48. DOI: 10.1016/0167-6377(93)90084-T  0.497
1992 Li C, Simchi-Levi D, Desrochers M. On the Distance Constrained Vehicle Routing Problem Operations Research. 40: 790-799. DOI: 10.1287/Opre.40.4.790  0.377
1992 Li CL, McCormick ST, Simchi-Levi D. On the minimum-cardinality-bounded-diameter and the bounded-cardinality-minimum-diameter edge addition problems Operations Research Letters. 11: 303-308. DOI: 10.1016/0167-6377(92)90007-P  0.363
1992 Li CL, McCormick ST, Simchi-Levi D. The point-to-point delivery and connection problems: complexity and algorithms Discrete Applied Mathematics. 36: 267-292. DOI: 10.1016/0166-218X(92)90258-C  0.392
1992 Gavish B, Li CL, Simchi-Levi D. Analysis of heuristics for the design of tree networks Annals of Operations Research. 36: 77-86. DOI: 10.1007/Bf02094324  0.372
1992 Li C, McCormick ST, Simchi-Levi D. Finding disjoint paths with different path-costs : complexity and algorithms Networks. 22: 653-667. DOI: 10.1002/Net.3230220705  0.406
1990 Li C, Simchi-Levi D. Worst-Case Analysis of Heuristics for Multidepot Capacitated Vehicle Routing Problems Informs Journal On Computing. 2: 64-73. DOI: 10.1287/Ijoc.2.1.64  0.421
1990 Li CL, McCormick ST, Simchi-Levi D. The complexity of finding two disjoint paths with min-max objective function Discrete Applied Mathematics. 26: 105-115. DOI: 10.1016/0166-218X(90)90024-7  0.396
Show low-probability matches.