Year |
Citation |
Score |
2015 |
Song L, Mohammed T, Stayshich D, Eldin N. A Cost Effective Material Tracking and Locating Solution for Material Laydown Yard Procedia Engineering. 123: 538-545. DOI: 10.1016/J.Proeng.2015.10.106 |
0.304 |
|
2012 |
Song L, Lee S. Stochastic Look-ahead Scheduling Method for Linear Construction Projects Journal of Risk Analysis and Crisis Response. 2: 252-260. DOI: 10.2991/Jrarc.2012.2.4.4 |
0.443 |
|
2012 |
Liu D, Sun J, Zhong D, Song L. Compaction Quality Control of Earth-Rock Dam Construction Using Real-Time Field Operation Data Journal of Construction Engineering and Management-Asce. 138: 1085-1094. DOI: 10.1061/(Asce)Co.1943-7862.0000510 |
0.305 |
|
2012 |
Song L, Eldin NN. Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling Automation in Construction. 27: 32-39. DOI: 10.1016/J.Autcon.2012.05.007 |
0.439 |
|
2009 |
Wang X, Sun Y, Song L, Mei C. An eco-environmental water demand based model for optimising water resources using hybrid genetic simulated annealing algorithms. Part I. Model development. Journal of Environmental Management. 90: 2628-35. PMID 19269735 DOI: 10.1016/J.Jenvman.2009.02.008 |
0.323 |
|
2009 |
Wang X, Sun Y, Song L, Mei C. An eco-environmental water demand based model for optimising water resources using hybrid genetic simulated annealing algorithms. Part II. Model application and results. Journal of Environmental Management. 90: 2612-9. PMID 19269734 DOI: 10.1016/J.Jenvman.2009.02.009 |
0.33 |
|
2009 |
Song L, Mohamed Y, Abourizk SM. Early contractor involvement in design and its impact on construction schedule performance Journal of Management in Engineering. 25: 12-20. DOI: 10.1061/(Asce)0742-597X(2009)25:1(12) |
0.585 |
|
2008 |
Song L, Abourizk SM. Measuring and modeling labor productivity using historical data Journal of Construction Engineering and Management. 134: 786-794. DOI: 10.1061/(Asce)0733-9364(2008)134:10(786) |
0.544 |
|
2006 |
Song L, AbouRizk SM. Virtual Shop Model for Experimental Planning of Steel Fabrication Projects Journal of Computing in Civil Engineering. 20: 308-316. DOI: 10.1061/(Asce)0887-3801(2006)20:5(308) |
0.491 |
|
2006 |
Song L, Wang P, AbouRizk S. A virtual shop modeling system for industrial fabrication shops Simulation Modelling Practice and Theory. 14: 649-662. DOI: 10.1016/J.Simpat.2005.10.012 |
0.599 |
|
2006 |
Zhong D, Li M, Song L, Wang G. Enhanced NURBS modeling and visualization for large 3D geoengineering applications: An example from the Jinping first-level hydropower engineering project, China Computers & Geosciences. 32: 1270-1282. DOI: 10.1016/J.Cageo.2005.11.007 |
0.413 |
|
2005 |
Song L, Al-Battaineh HT, AbouRizk SM. Modeling uncertainty with an integrated simulation system Canadian Journal of Civil Engineering. 32: 533-542. DOI: 10.1139/L05-004 |
0.61 |
|
2005 |
Song L, AbouRizk SM. Quantifying engineering project scope for productivity modeling Journal of Construction Engineering and Management. 131: 360-367. DOI: 10.1061/(Asce)0733-9364(2005)131:3(360) |
0.586 |
|
2004 |
Zhong D, Li J, Zhu H, Song L. Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes Journal of Construction Engineering and Management-Asce. 130: 742-750. DOI: 10.1061/(Asce)0733-9364(2004)130:5(742) |
0.375 |
|
Show low-probability matches. |