Year |
Citation |
Score |
2013 |
Wu D, Zhang LL, Jiao RJ, Lu RF. SysML-based design chain information modeling for variety management in production reconfiguration Journal of Intelligent Manufacturing. 24: 575-596. DOI: 10.1007/s10845-011-0585-6 |
0.361 |
|
2011 |
Faber I, Li Z, Lu RF, Mastrangelo CM. A framework for system-level manufacturability assessment 61st Annual Iie Conference and Expo Proceedings. |
0.372 |
|
2010 |
Rusly RP, Al-Aqrabawi ZA, Osa HN, Kirkham CJ, Lu RF, Storch RL. Modeling of fastener kitting logistics for boeing wide body airplanes Sae International Journal of Aerospace. 2: 241-248. DOI: 10.4271/2009-01-3252 |
0.569 |
|
2010 |
Lu RF, Song S. A tutorial on concepts and measures of manufacturing processes dependence Proceedings - Winter Simulation Conference. 254-267. DOI: 10.1109/WSC.2010.5679157 |
0.311 |
|
2009 |
Al-Aqrabawi ZA, Fleming DT, Maranan AS, Lam H, Kirkham CJ, Lu RF, Storch RL. Modeling of commercial airplanes service request process flows Sae Technical Papers. DOI: 10.4271/2009-01-3199 |
0.502 |
|
2009 |
Lu RF, Petersen TD, Storch RL. Asynchronous stochastic learning curve effects in engineering-to-order customisation processes International Journal of Production Research. 47: 1309-1329. DOI: 10.1080/00207540701484921 |
0.621 |
|
2007 |
Lu RF, Petersen TD, Storch RL. Modeling customized product configuration in large assembly manufacturing with supply-chain considerations International Journal of Flexible Manufacturing Systems. 19: 685-712. DOI: 10.1007/S10696-008-9041-0 |
0.628 |
|
2007 |
Lu RF, Storch RL. A statistical verification method in modeling mass customization in a production system of asynchronous stochastic learning curves Iie Annual Conference and Expo 2007 - Industrial Engineering's Critical Role in a Flat World - Conference Proceedings. 830-835. |
0.615 |
|
2007 |
Storch RL, Lu RF, Petersen TD. Optimizing product configuration decision times in shipbuilding Rina - International Conference On Computer Applications in Shipbuilding 2007 - Papers. 1: 71-82. |
0.59 |
|
2006 |
Zeng QL, Tseng MM, Lu RF. Staged postponement of order specification commitment for supply chain management Cirp Annals - Manufacturing Technology. 55: 501-504. DOI: 10.1016/S0007-8506(07)60468-5 |
0.408 |
|
2006 |
Lu RF, Storch RL. Simulation modeling of customized product family decision points and logistics 2006 Iie Annual Conference and Exhibition. |
0.648 |
|
2004 |
Lu RF, Storch R. Large scale manufacturing system integration: Modeling of a global component transportation logistics case Proceedings of the Iasted International Conference On Modelling, Simulation, and Optimization. 259-263. |
0.606 |
|
2004 |
Lu RF, Li L, Kim KC. Traceable part batching performance modeling: A simulation case study Sae Technical Papers. |
0.358 |
|
Show low-probability matches. |