Year |
Citation |
Score |
2020 |
Haghighat H, Karimianfard H, Zeng B. Integrating Energy Management of Autonomous Smart Grids in Electricity Market Operation Ieee Transactions On Smart Grid. 11: 4044-4055. DOI: 10.1109/Tsg.2020.2992570 |
0.387 |
|
2020 |
Cao X, Wang J, Wang J, Zeng B. A Risk-Averse Conic Model for Networked Microgrids Planning With Reconfiguration and Reorganizations Ieee Transactions On Smart Grid. 11: 696-709. DOI: 10.1109/Tsg.2019.2927833 |
0.352 |
|
2020 |
Yuan W, Zeng B. Cost-effective power grid protection through defender–attacker–defender model with corrective network topology control Energy Systems. 11: 811-837. DOI: 10.1007/S12667-019-00345-Z |
0.406 |
|
2019 |
Li H, Tu YC, Zeng B. Concurrent query processing in a GPU-based database system. Plos One. 14: e0214720. PMID 30990851 DOI: 10.1371/Journal.Pone.0214720 |
0.399 |
|
2019 |
Cao X, Wang J, Zeng B. Networked Microgrids Planning Through Chance Constrained Stochastic Conic Programming Ieee Transactions On Smart Grid. 10: 6619-6628. DOI: 10.1109/Tsg.2019.2908848 |
0.455 |
|
2019 |
Zare MH, Borrero JS, Zeng B, Prokopyev OA. A note on linearized reformulations for a class of bilevel linear integer problems Annals of Operations Research. 272: 99-117. DOI: 10.1007/S10479-017-2694-X |
0.363 |
|
2018 |
Cao X, Wang J, Zeng B. Distributed Generation Planning Guidance Through Feasibility and Profit Analysis Ieee Transactions On Smart Grid. 9: 5473-5475. DOI: 10.1109/Tsg.2018.2849852 |
0.393 |
|
2018 |
Bhattacharya A, Kharoufeh JP, Zeng B. Managing Energy Storage in Microgrids: A Multistage Stochastic Programming Approach Ieee Transactions On Smart Grid. 9: 483-496. DOI: 10.1109/Tsg.2016.2618621 |
0.398 |
|
2018 |
Haghighat H, Zeng B. Bilevel Mixed Integer Transmission Expansion Planning Ieee Transactions On Power Systems. 33: 7309-7312. DOI: 10.1109/Tpwrs.2018.2865189 |
0.353 |
|
2018 |
Haghighat H, Zeng B. Bilevel Conic Transmission Expansion Planning Ieee Transactions On Power Systems. 33: 4640-4642. DOI: 10.1109/Tpwrs.2018.2835663 |
0.335 |
|
2018 |
Zhang X, Shi D, Wang Z, Zeng B, Wang X, Tomsovic K, Jin Y. Optimal Allocation of Series FACTS Devices Under High Penetration of Wind Power Within a Market Environment Ieee Transactions On Power Systems. 33: 6206-6217. DOI: 10.1109/Tpwrs.2018.2834502 |
0.392 |
|
2018 |
Haghighat H, Zeng B. Stochastic and Chance-Constrained Conic Distribution System Expansion Planning Using Bilinear Benders Decomposition Ieee Transactions On Power Systems. 33: 2696-2705. DOI: 10.1109/Tpwrs.2017.2751514 |
0.436 |
|
2018 |
Cao X, Wang J, Zeng B. A Chance Constrained Information-Gap Decision Model for Multi-Period Microgrid Planning Ieee Transactions On Power Systems. 33: 2684-2695. DOI: 10.1109/Tpwrs.2017.2747625 |
0.401 |
|
2018 |
Wang G, Zhang J, Zeng B, Lin G. Expected residual minimization formulation for a class of stochastic linear second-order cone complementarity problems European Journal of Operational Research. 265: 437-447. DOI: 10.1016/J.Ejor.2017.09.008 |
0.419 |
|
2017 |
Apaydin M, Xu L, Zeng B, Qian X. Robust mutant strain design by pessimistic optimization. Bmc Genomics. 18: 677. PMID 28984191 DOI: 10.1186/S12864-017-4025-7 |
0.321 |
|
2017 |
Zhang Y, Wang J, Zeng B, Hu Z. Chance-Constrained Two-Stage Unit Commitment Under Uncertain Load and Wind Power Output Using Bilinear Benders Decomposition Ieee Transactions On Power Systems. 32: 3637-3647. DOI: 10.1109/Tpwrs.2017.2655078 |
0.411 |
|
2017 |
Zhao M, Huang K, Zeng B. A polyhedral study on chance constrained program with random right-hand side Mathematical Programming. 166: 19-64. DOI: 10.1007/S10107-016-1103-6 |
0.401 |
|
2016 |
Ding T, Liu S, Yuan W, Bie Z, Zeng B. A two-stage robust reactive power optimization considering uncertain wind power integration in active distribution networks Ieee Transactions On Sustainable Energy. 7: 301-311. DOI: 10.1109/Tste.2015.2494587 |
0.415 |
|
2016 |
Yuan W, Wang J, Qiu F, Chen C, Kang C, Zeng B. Robust Optimization-Based Resilient Distribution Network Planning Against Natural Disasters Ieee Transactions On Smart Grid. DOI: 10.1109/Tsg.2015.2513048 |
0.39 |
|
2016 |
Li Z, Wu W, Zeng B, Shahidehpour M, Zhang B. Decentralized Contingency-Constrained Tie-Line Scheduling for Multi-Area Power Grids Ieee Transactions On Power Systems. DOI: 10.1109/Tpwrs.2016.2539278 |
0.418 |
|
2015 |
Haghighat H, Zeng B. Distribution System Reconfiguration Under Uncertain Load and Renewable Generation Ieee Transactions On Power Systems. DOI: 10.1109/Tpwrs.2015.2481508 |
0.428 |
|
2015 |
An Y, Zeng B. Exploring the modeling capacity of two-stage robust optimization: Variants of robust unit commitment model Ieee Transactions On Power Systems. 30: 109-122. DOI: 10.1109/Tpwrs.2014.2320880 |
0.402 |
|
2015 |
Xie X, Zeng B, Nachabe M. Sampling design for water distribution network chlorine decay calibration Urban Water Journal. 12: 190-199. DOI: 10.1080/1573062X.2013.831911 |
0.327 |
|
2015 |
Xie X, Nachabe M, Zeng B. Optimal scheduling of automatic flushing devices in water distribution system Journal of Water Resources Planning and Management. 141: 1-9. DOI: 10.1061/(Asce)Wr.1943-5452.0000477 |
0.302 |
|
2015 |
An Y, Zhang Y, Zeng B. The reliable hub-and-spoke design problem: Models and algorithms Transportation Research Part B: Methodological. 77: 103-122. DOI: 10.1016/J.Trb.2015.02.006 |
0.39 |
|
2014 |
Sajjadi SJ, Qian X, Zeng B, Adl AA. Network-Based Methods to Identify Highly Discriminating Subsets of Biomarkers. Ieee/Acm Transactions On Computational Biology and Bioinformatics / Ieee, Acm. 11: 1029-37. PMID 26357040 DOI: 10.1109/Tcbb.2014.2325014 |
0.345 |
|
2014 |
An Y, Zeng B, Zhang Y, Zhao L. Reliable p-median facility location problem: two-stage robust models and algorithms Transportation Research Part B-Methodological. 64: 54-72. DOI: 10.1016/J.Trb.2014.02.005 |
0.401 |
|
2014 |
Yuan W, Zhao L, Zeng B. Optimal power grid protection through a defender–attacker–defender model Reliability Engineering & System Safety. 121: 83-89. DOI: 10.1016/J.Ress.2013.08.003 |
0.433 |
|
2013 |
Ren S, Zeng B, Qian X. Adaptive bi-level programming for optimal gene knockouts for targeted overproduction under phenotypic constraints. Bmc Bioinformatics. 14: S17. PMID 23368729 DOI: 10.1186/1471-2105-14-S2-S17 |
0.35 |
|
2013 |
Zhao L, Zeng B. Vulnerability Analysis of Power Grids With Line Switching Ieee Transactions On Power Systems. 28: 2727-2736. DOI: 10.1109/Tpwrs.2013.2256374 |
0.431 |
|
2013 |
Zhao L, Zeng B, Buckley B. A Stochastic Unit Commitment Model With Cooling Systems Ieee Transactions On Power Systems. 28: 211-218. DOI: 10.1109/Tpwrs.2012.2196715 |
0.32 |
|
2013 |
Zeng B, Zhao L. Solving two-stage robust optimization problems using a column-and-constraint generation method Operations Research Letters. 41: 457-461. DOI: 10.1016/J.Orl.2013.05.003 |
0.413 |
|
2013 |
Li Q, Zeng B, Savachkin A. Reliable facility location design under disruptions Computers and Operations Research. 40: 901-909. DOI: 10.1016/J.Cor.2012.11.012 |
0.382 |
|
2013 |
Kuznia L, Zeng B, Centeno G, Miao Z. Stochastic optimization for power system configuration with renewable energy in remote areas Annals of Operations Research. 210: 411-432. DOI: 10.1007/S10479-012-1110-9 |
0.429 |
|
2012 |
Turkcan A, Zeng B, Lawley M. Chemotherapy operations planning and scheduling Iie Transactions On Healthcare Systems Engineering. 2: 31-49. DOI: 10.1080/19488300.2012.665155 |
0.321 |
|
2011 |
Turkcan A, Zeng B, Muthuraman K, Lawley M. Sequential clinical scheduling with service criteria European Journal of Operational Research. 214: 780-795. DOI: 10.1016/J.Ejor.2011.05.023 |
0.338 |
|
2011 |
Zeng B, Richard JP. A polyhedral study on 0-1 knapsack problems with disjoint cardinality constraints: Facet-defining inequalities by sequential lifting Discrete Optimization. 8: 277-301. DOI: 10.1016/J.Disopt.2010.09.005 |
0.515 |
|
2011 |
Zeng B, Richard JP. A polyhedral study on 0-1 knapsack problems with disjoint cardinality constraints: Strong valid inequalities by sequence-independent lifting Discrete Optimization. 8: 259-276. DOI: 10.1016/J.Disopt.2010.09.004 |
0.522 |
|
2009 |
Zeng B, Turkcan A, Lin J, Lawley M. Clinic scheduling models with overbooking for patients with heterogeneous no-show probabilities Annals of Operations Research. 178: 121-144. DOI: 10.1007/S10479-009-0569-5 |
0.327 |
|
Show low-probability matches. |