Year |
Citation |
Score |
2020 |
Wang D, Xiao F, Zhou L, Liang Z. Two-dimensional skiving and cutting stock problem with setup cost based on column-and-row generation European Journal of Operational Research. 286: 547-563. DOI: 10.1016/J.Ejor.2020.03.060 |
0.483 |
|
2020 |
Wu T, Shi Z, Liang Z, Zhang X, Zhang C. Dantzig-Wolfe decomposition for the facility location and production planning problem Computers & Operations Research. 124: 105068. DOI: 10.1016/J.Cor.2020.105068 |
0.474 |
|
2020 |
Zhou L, Liang Z, Chou C, Chaovalitwongse WA. Airline planning and scheduling: Models and solution methodologies Frontiers of Engineering Management. 7: 1-26. DOI: 10.1007/S42524-020-0093-5 |
0.697 |
|
2019 |
Wu T, Xiao F, Zhang C, Zhang D, Liang Z. Regression and extrapolation guided optimization for production–distribution with ship–buy–exchange options Transportation Research Part E-Logistics and Transportation Review. 129: 15-37. DOI: 10.1016/J.Tre.2019.06.012 |
0.514 |
|
2018 |
Wu T, Liang Z, Zhang C. Analytics Branching and Selection for the Capacitated Multi-Item Lot Sizing Problem with Nonidentical Machines Informs Journal On Computing. 30: 236-258. DOI: 10.1287/Ijoc.2017.0777 |
0.476 |
|
2018 |
Liang Z, Xiao F, Qian X, Zhou L, Jin X, Lu X, Karichery S. A column generation-based heuristic for aircraft recovery problem with airport capacity constraints and maintenance flexibility Transportation Research Part B-Methodological. 113: 70-90. DOI: 10.1016/J.Trb.2018.05.007 |
0.536 |
|
2018 |
Wu T, Xiao F, Zhang C, He Y, Liang Z. The green capacitated multi-item lot sizing problem with parallel machines Computers & Operations Research. 98: 149-164. DOI: 10.1016/J.Cor.2018.05.024 |
0.43 |
|
2017 |
Wu T, Akartunali K, Jans R, Liang Z. Progressive selection method for the coupled lot-sizing and cutting-stock problem Informs Journal On Computing. 29: 523-543. DOI: 10.1287/Ijoc.2017.0746 |
0.48 |
|
2017 |
Song Y, Zhang J, Liang Z, Ye C. An exact algorithm for the container drayage problem under a separation mode Transportation Research Part E-Logistics and Transportation Review. 106: 231-254. DOI: 10.1016/J.Tre.2017.07.010 |
0.388 |
|
2017 |
Zhang C, Xie F, Huang K, Wu T, Liang Z. MIP models and a hybrid method for the capacitated air-cargo network planning and scheduling problems Transportation Research Part E-Logistics and Transportation Review. 103: 158-173. DOI: 10.1016/J.Tre.2017.05.003 |
0.439 |
|
2017 |
Zhen L, Liang Z, Zhuge D, Lee LH, Chew EP. Daily berth planning in a tidal port with channel flow control Transportation Research Part B-Methodological. 106: 193-217. DOI: 10.1016/J.Trb.2017.10.008 |
0.479 |
|
2017 |
Chaovalitwongse WA, Chou C, Liang Z, Wang S. Applied optimization and data mining Annals of Operations Research. 249: 1-3. DOI: 10.1007/S10479-017-2402-X |
0.657 |
|
2017 |
Pan Y, Liang Z. Dual relaxations of the time-indexed ILP formulation for min–sum scheduling problems Annals of Operations Research. 249: 197-213. DOI: 10.1007/S10479-014-1776-2 |
0.512 |
|
2015 |
Chou CA, Liang Z, Chaovalitwongse WA, Berger-Wolf TY, DasGupta B, Sheikh S, Ashley MV, Caballero IC. Column-generation framework of nonlinear similarity model for reconstructing sibling groups Informs Journal On Computing. 27: 35-47. DOI: 10.1287/Ijoc.2014.0608 |
0.649 |
|
2015 |
Liang Z, Feng Y, Zhang X, Wu T, Chaovalitwongse WA. Robust weekly aircraft maintenance routing problem and the extension to the tail assignment problem Transportation Research Part B: Methodological. 78: 238-259. DOI: 10.1016/J.Trb.2015.03.013 |
0.68 |
|
2015 |
He Y, Wu T, Zhang C, Liang Z. An improved MIP heuristic for the intermodal hub location problem Omega (United Kingdom). 57: 203-211. DOI: 10.1016/J.Omega.2015.04.016 |
0.466 |
|
2015 |
Liang Z, He Y, Wu T, Zhang C. An informative column generation and decomposition method for a production planning and facility location problem International Journal of Production Economics. 170: 88-96. DOI: 10.1016/J.Ijpe.2015.08.024 |
0.469 |
|
2014 |
Liang Z, Chaovalitwongse WA, Elsayed EA. Sequence assignment model for the flight conflict resolution problem Transportation Science. 48: 334-350. DOI: 10.1287/Trsc.2013.0480 |
0.667 |
|
2013 |
Liang Z, Chaovalitwongse WA. A network-based model for the integrated weekly aircraft maintenance routing and fleet assignment problem Transportation Science. 47: 493-507. DOI: 10.1287/Trsc.1120.0434 |
0.681 |
|
2013 |
Wu T, Zhang C, Liang Z, Leung SCH. A Lagrangian relaxation-based method and models evaluation for multi-level lot sizing problems with backorders Computers & Operations Research. 40: 1852-1863. DOI: 10.1016/J.Cor.2013.01.021 |
0.511 |
|
2013 |
Liang Z, Lee C, Chaovalitwongse WA. Mathematical programming approaches for dual multicast routing problem with multilayer risk cost Annals of Operations Research. 1-18. DOI: 10.1007/S10479-013-1317-4 |
0.662 |
|
2012 |
Liang Z, Chaovalitwongse WA. A multicast problem with shared risk cost Optimization Letters. 6: 571-584. DOI: 10.1007/S11590-011-0283-5 |
0.643 |
|
2011 |
Liang Z, Chaovalitwongse WA, Huang HC, Johnson EL. On a new rotation tour network model for aircraft maintenance routing problem Transportation Science. 45: 109-120. DOI: 10.1287/Trsc.1100.0338 |
0.678 |
|
2010 |
Liang Z, Art Chaovalitwongse W, Cha M, Moon SB. Redundant multicast routing in multilayer networks with shared risk resource groups: Complexity, models and algorithms Computers and Operations Research. 37: 1731-1739. DOI: 10.1016/J.Cor.2009.12.009 |
0.418 |
|
2009 |
Liang Z, Art Chaovalitwongse W. Bounds of redundant multicast routing problem with SRLG-diverse constraints: edge, path and tree models Journal of Global Optimization. 48: 335-345. DOI: 10.1007/S10898-009-9497-9 |
0.459 |
|
Show low-probability matches. |