Spiro N. Pollalis
Affiliations: | Harvard University, Cambridge, MA, United States |
Area:
Architecture, Computer ScienceGoogle:
"Spiro Pollalis"Children
Sign in to add traineeLarry R. Barrow | grad student | 2000 | Harvard |
Amy B. Noble | grad student | 2000 | Harvard |
Pau Sola-Morales | grad student | 2000 | Harvard |
Henrikus J. Huijbregts | grad student | 2002 | Harvard |
Shiro Matsushima | grad student | 2003 | Harvard |
Kyuman Song | grad student | 2004 | Harvard |
Anna Stefanidou | grad student | 2004 | Harvard |
Ki H. Ku | grad student | 2005 | Harvard |
Panagiotis Parthenios | grad student | 2005 | Harvard |
Burcin Becerik | grad student | 2006 | Harvard |
Hao-Hsiu Chiu | grad student | 2006 | Harvard |
Evangelia Papadimitriou | grad student | 2006 | Harvard |
June-Hao Hou | grad student | 1999-2006 | Harvard (Architecture Tree) |
David del Villar Fernandez | grad student | 2007 | Harvard |
Andreas Georgoulias | grad student | 2008 | Harvard |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Stoy C, Pollalis S, Dursun O. (2012) A concept for developing construction element cost models for German residential building projects International Journal of Project Organisation and Management. 4: 38-53 |
Stoy C, Pollalis S, Fiala D. (2009) Estimating buildings' energy consumption and energy costs in early project phases Facilities. 27: 187-201 |
Ku K, Pollalis SN. (2009) Contractual standards for enhanced geometry control in model-based collaboration Electronic Journal of Information Technology in Construction. 14: 366-384 |
Stoy C, Pollalis S, Schalcher H. (2008) Drivers for Cost Estimating in Early Design : Case Study of Residential Construction Journal of Construction Engineering and Management-Asce. 134: 32-39 |
Ku K, Pollalis SN, Fischer MA, et al. (2008) 3D model-based collaboration in design development and construction of complex shaped buildings Electronic Journal of Information Technology in Construction. 13: 458-485 |
Stoy C, Pollalis S, Schalcher H. (2007) Early estimation of building construction speed in Germany International Journal of Project Management. 25: 283-289 |
Song K, Pollalis SN, Pena-Mora F. (2005) Project dashboard: Concurrent visual representation method of project metrics on 3D building models Proceedings of the 2005 Asce International Conference On Computing in Civil Engineering. 1561-1572 |
Pollalis SN, Bakos JY. (1996) Technology in the design process Journal of Architectural and Planning Research. 13: 152-162 |