Reza Azimi, Ph.D.
Affiliations: | 2011 | Civil and Environmental Engineering | University of Alberta, Edmonton, Alberta, Canada |
Area:
Civil EngineeringGoogle:
"Reza Azimi"Parents
Sign in to add mentorSimaan AbouRizk | grad student | 2011 | University of Alberta (E-Tree) | |
(An Integrated Real-Time Control System for Structural Steel Fabrication Projects.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Azimi R, Fox T, Gonzalez W, et al. (2018) Scale-Out vs Scale-Up: A Study of ARM-based SoCs on Server-Class Workloads Acm Transactions On Modeling and Performance Evaluation of Computing. 3: 18 |
Azimi R, Lee S, Abourizk SM. (2012) Applying basic control theory principles to project control: Case study of off-site construction shops Journal of Computing in Civil Engineering. 26: 681-690 |
Alvanchi A, Azimi R, Lee S, et al. (2012) Off-site construction planning using discrete event simulation Journal of Architectural Engineering. 18: 114-122 |
Azimi R, Yazdani-Chamzini A, Fouladgar MM, et al. (2011) Ranking the strategies of mining sector through ANP and TOPSIS in a SWOT framework | Gavybos sektoriaus strategiju{ogonek} rangavimas taikant ANP, TOPSIS ir SSGG metodus Journal of Business Economics and Management. 12: 670-689 |
Azimi R, Yazdani-Chamzini A, Fooladgar MM, et al. (2011) Evaluating the strategies of the Iranian mining sector using a integrated model International Journal of Management Science and Engineering Management. 6: 459-466 |
Azimi R, Lee S, Abourizk SM, et al. (2011) A framework for an automated and integrated project monitoring and control system for steel fabrication projects Automation in Construction. 20: 88-97 |
Azimi R, Lee SH, AbouRizk SM. (2010) Integrated simulation-based look-ahead scheduling for steel fabrication projects Proceedings - 2nd International Conference On Advances in System Simulation, Simul 2010. 129-133 |
Azimi R, Lee SH, AbouRizk SM. (2010) Resource performance indicators in controlling industrial steel projects Construction Research Congress 2010: Innovation For Reshaping Construction Practice - Proceedings of the 2010 Construction Research Congress. 21-30 |
Azimi R, Tam DK, Soares L, et al. (2009) Enhancing operating system support for multicore processors by using hardware performance monitoring Operating Systems Review (Acm). 43: 56-65 |
Azimi R, Ourdev I, AbouRizk SM, et al. (2009) Effects of pouring rate on lateral pressure of Agilia concrete Proceedings, Annual Conference - Canadian Society For Civil Engineering. 2: 1035-1042 |