Philip M. Wolfe
Affiliations: | 1976-1984 | Industrial Engineering and Management | Oklahoma State University, Stillwater, OK, United States |
1988- | Industrial and management systems | Arizona State University, Tempe, AZ, United States |
Area:
Industrial engineeringGoogle:
"Philip Maurice Wolfe" OR "Philip M Wolfe"Bio:
https://books.google.com/books?id=F4NRAAAAMAAJ
https://www.worldcat.org/oclc/13340938
DOI: 10.1287/mnsc.16.1.93
https://apps.dtic.mil/sti/pdfs/AD0666412.pdf
Parents
Sign in to add mentorA. Alan B. Pritsker | grad student | 1968 | Arizona State (E-Tree) | |
(A zero-one programming approach to multiproject scheduling with limited resources) |
Children
Sign in to add traineeBehrokh Khoshnevis | grad student | 1979 | Oklahoma State University (E-Tree) |
Hamid Seifoddini | grad student | 1984 | Oklahoma State University (E-Tree) |
Tze-chun Chang | grad student | 2000 | Arizona State (Computer Science Tree) |
Lisa A. Schaefer | grad student | 2000 | Arizona State (Computer Science Tree) |
Chung-Yang Chen | grad student | 2002 | Arizona State (Computer Science Tree) |
Jiun-Yan Shiau | grad student | 2002 | Arizona State (E-Tree) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Parmar D, Wu T, Callarman T, et al. (2010) A clustering algorithm for supplier base management International Journal of Production Research. 48: 3803-3821 |
Schaefer LA, Montgomery DC, Wolfe PM. (2004) A flow metamodel for delivery agents over a spatial area Iie Transactions (Institute of Industrial Engineers). 36: 1055-1065 |
Schaefer LA, Wolfe PM, Fowler J, et al. (2004) Simulation meta-architecture for analyzing the emergent behavior of agents Complexity International. 10: 1-15 |
Fukunari M, Chi YL, Wolfe PM. (2001) JavaBean-based simulation with operational procedure table (OPT) Future Generation Computer Systems. 17: 513-523 |
Du TCT, Wolfe PM. (2000) Building an active material requirements planning system International Journal of Production Research. 38: 241-252 |
Du TC, Wolfe PM. (1998) Process fuzzy data for triggers and constraints in active object oriented databases Journal of the Chinese Institute of Industrial Engineers. 15: 185-195 |
Chih-Ting Du T, Wolfe PM. (1997) Overview of emerging database architectures Computers and Industrial Engineering. 32: 811-821 |
Raafat F(, Wolfe PM, Eldin HK. (1991) An inventory model for deteriorating items Computers and Industrial Engineering. 20: 89-94 |
Seifoddini H, Wolfe PM. (1987) Selection of a threshold value based on material handling cost in machine-component grouping Iie Transactions (Institute of Industrial Engineers). 19: 266-270 |
Seifoddini H, Wolfe PM. (1986) Application of the similarity coefficient method in group technology Iie Transactions (Institute of Industrial Engineers). 18: 271-277 |