Heng Li, Ph.D. - Publications

Affiliations: 
2012 Cornell University, Ithaca, NY, United States 
Area:
x-ray, synchrotron radiation, x-ray detectors, block copolymers, biomembrane lipids

171 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2021 Arashpour M, Ngo T, Li H. Scene understanding in construction and buildings using image processing methods: A comprehensive review and a case study Journal of Building Engineering. 33: 101672. DOI: 10.1016/J.Jobe.2020.101672  0.349
2020 Irfan M, Zhao ZY, Li H, Rehman A. The influence of consumers' intention factors on willingness to pay for renewable energy: a structural equation modeling approach. Environmental Science and Pollution Research International. PMID 32279259 DOI: 10.1007/S11356-020-08592-9  0.3
2020 Wang G, Liu H, Li H, Luo X, Liu J. A Building Project-Based Industrialized Construction Maturity Model Involving Organizational Enablers: A Multi-Case Study in China Sustainability. 12: 4029. DOI: 10.3390/Su12104029  0.352
2020 Chen Z, Agapiou A, Li H. A benefits prioritization analysis on adopting BIM systems against major challenges in megaproject delivery Frontiers in Built Environment. 6: 26. DOI: 10.3389/Fbuil.2020.00026  0.319
2020 Zhong B, Li H, Luo H, Zhou J, Fang W, Xing X. Ontology-Based Semantic Modeling of Knowledge in Construction: Classification and Identification of Hazards Implied in Images Journal of Construction Engineering and Management-Asce. 146: 4020013. DOI: 10.1061/(Asce)Co.1943-7862.0001767  0.318
2020 Cao Y, Zhang X, Zhang X, Li H. The incremental construction land differentiated management framework: the perspective of land quota trading in China Land Use Policy. 96: 104675. DOI: 10.1016/J.Landusepol.2020.104675  0.309
2020 Wang Z, Li H, Yang X. Vision-based robotic system for on-site construction and demolition waste sorting and recycling Journal of Building Engineering. 101769. DOI: 10.1016/J.Jobe.2020.101769  0.323
2020 Liu D, Li H, Wang H, Qi C, Rose T. Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling Expert Systems With Applications. 148: 113230. DOI: 10.1016/J.Eswa.2020.113230  0.338
2020 Teizer J, Neve H, Li H, Wandahl S, König J, Ochner B, König M, Lerche J. Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring Automation in Construction. 116: 103245. DOI: 10.1016/J.Autcon.2020.103245  0.328
2020 Mo Y, Zhao D, Du J, Syal M, Aziz A, Li H. Automated staff assignment for building maintenance using natural language processing Automation in Construction. 113: 103150. DOI: 10.1016/J.Autcon.2020.103150  0.33
2020 Asadzadeh A, Arashpour M, Li H, Ngo T, Bab-Hadiashar A, Rashidi A. Sensor-based safety management Automation in Construction. 113: 103128. DOI: 10.1016/J.Autcon.2020.103128  0.305
2020 Shirowzhan S, Sepasgozar SME, Edwards DJ, Li H, Wang C. BIM compatibility and its differentiation with interoperability challenges as an innovation factor Automation in Construction. 112: 103086. DOI: 10.1016/J.Autcon.2020.103086  0.345
2020 Fang W, Ding L, Love PED, Luo H, Li H, Peña-Mora F, Zhong B, Zhou C. Computer vision applications in construction safety assurance Automation in Construction. 110: 103013. DOI: 10.1016/J.Autcon.2019.103013  0.308
2020 Xu Z, Zhang L, Li H, Lin Y, Yin S. Combining IFC and 3D tiles to create 3D visualization for building information modeling Automation in Construction. 109: 102995. DOI: 10.1016/J.Autcon.2019.102995  0.305
2020 Zhong B, Xing X, Luo H, Zhou Q, Li H, Rose TM, Fang W. Deep learning-based extraction of construction procedural constraints from construction regulations Advanced Engineering Informatics. 43: 101003. DOI: 10.1016/J.Aei.2019.101003  0.306
2019 Sepasgozar SME, Li H, Shirowzhan S, Tam VWY. Methods for monitoring construction off-road vehicle emissions: a critical review for identifying deficiencies and directions. Environmental Science and Pollution Research International. PMID 31012071 DOI: 10.1007/S11356-019-05003-6  0.309
2019 Liu D, Wang H, Li H, Wang J, Khallaf M. Hierarchical task network approach for time and budget constrained construction project planning Technological and Economic Development of Economy. 25: 472-495. DOI: 10.3846/Tede.2019.9384  0.342
2019 Zhong B, Hei Y, Li H, Rose T, Luo H. Patent cooperative patterns and development trends of Chinese construction enterprises: A network analysis Journal of Civil Engineering and Management. 25: 228-240. DOI: 10.3846/Jcem.2019.8137  0.322
2019 Deraman R, Wang C, Yap JBH, Li H, Mohd-Rahim FA. Developing Internet Online Procurement Frameworks for Construction Firms Future Internet. 11: 136. DOI: 10.3390/Fi11060136  0.308
2019 Tang Y, Wang G, Li H, Cao D, Li X. Comparing Project-Based Collaborative Networks for BIM Implementation in Public and Private Sectors: A Longitudinal Study in Hong Kong Advances in Civil Engineering. 2019: 1-14. DOI: 10.1155/2019/6213694  0.334
2019 Zeng W, Wang H, Li H, Zhou H, Wu P, Le Y. Incentive Mechanisms for Supplier Development in Mega Construction Projects Ieee Transactions On Engineering Management. 66: 252-265. DOI: 10.1109/Tem.2018.2808169  0.34
2019 Antwi-Afari MF, Li H, Wong JK, Oladinrin OT, Ge JX, Seo J, Wong AYL. Sensing and warning-based technology applications to improve occupational health and safety in the construction industry Engineering, Construction and Architectural Management. 26: 1534-1552. DOI: 10.1108/Ecam-05-2018-0188  0.306
2019 Li X, Li H, Cao D, Tang Y, Luo X, Wang G. Modeling Dynamics of Project-Based Collaborative Networks for BIM Implementation in the Construction Industry: Empirical Study in Hong Kong Journal of Construction Engineering and Management-Asce. 145: 5019013. DOI: 10.1061/(Asce)Co.1943-7862.0001726  0.352
2019 Liu Z, Wang H, Li H. Erratum for “Model of Equipment Sharing between Contractors on Construction Projects” by Zhi Liu, Hongwei Wang, and Heng Li Journal of Construction Engineering and Management-Asce. 145: 8219002. DOI: 10.1061/(Asce)Co.1943-7862.0001699  0.305
2019 Zhang H, Yan X, Li H, Jin R, Fu H. Real-Time Alarming, Monitoring, and Locating for Non-Hard-Hat Use in Construction Journal of Construction Engineering and Management-Asce. 145: 4019006. DOI: 10.1061/(Asce)Co.1943-7862.0001629  0.3
2019 Wang F, Li H, Dong C, Ding L. Knowledge representation using non-parametric Bayesian networks for tunneling risk analysis Reliability Engineering & System Safety. 191: 106529. DOI: 10.1016/J.Ress.2019.106529  0.321
2019 Oraee M, Hosseini MR, Edwards DJ, Li H, Papadonikolaki E, Cao D. Collaboration barriers in BIM-based construction networks: A conceptual model International Journal of Project Management. 37: 839-854. DOI: 10.1016/J.Ijproman.2019.05.004  0.351
2019 Wu Z, Li H, Feng Y, Luo X, Chen Q. Developing a green building evaluation standard for interior decoration: A case study of China Building and Environment. 152: 50-58. DOI: 10.1016/J.Buildenv.2019.02.010  0.325
2019 Zhong B, Wu H, Ding L, Love PED, Li H, Luo H, Jiao L. Mapping computer vision research in construction: Developments, knowledge gaps and implications for research Automation in Construction. 107: 102919. DOI: 10.1016/J.Autcon.2019.102919  0.343
2019 Kim M, Wang Q, Li H. Non-contact sensing based geometric quality assessment of buildings and civil structures: A review Automation in Construction. 100: 163-179. DOI: 10.1016/J.Autcon.2019.01.002  0.339
2019 Wang D, Li H, Chen J. Detecting and measuring construction workers' vigilance through hybrid kinematic-EEG signals Automation in Construction. 100: 11-23. DOI: 10.1016/J.Autcon.2018.12.018  0.333
2018 Xu Z, Huang T, Li B, Li H, Li Q. Developing an IFC-Based Database for Construction Quality Evaluation Advances in Civil Engineering. 2018: 1-22. DOI: 10.1155/2018/3946051  0.329
2018 Tang Y, Wang G, Li H, Cao D. Dynamics of Collaborative Networks between Contractors and Subcontractors in the Construction Industry: Evidence from National Quality Award Projects in China Journal of Construction Engineering and Management-Asce. 144: 5018009. DOI: 10.1061/(Asce)Co.1943-7862.0001555  0.318
2018 Liu Z, Wang H, Li H. Model of Equipment Sharing between Contractors on Construction Projects Journal of Construction Engineering and Management-Asce. 144: 4018039. DOI: 10.1061/(Asce)Co.1943-7862.0001485  0.321
2018 Dong S, Li H, Yin Q. Building information modeling in combination with real time location systems and sensors for safety performance enhancement Safety Science. 102: 226-237. DOI: 10.1016/J.Ssci.2017.10.011  0.308
2018 Kong L, Li H, Luo H, Ding L, Zhang X. Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction Journal of Cleaner Production. 193: 684-701. DOI: 10.1016/J.Jclepro.2018.05.037  0.32
2018 Shen L, Ren Y, Xiong N, Li H, Chen Y. Why small towns can not share the benefits of urbanization in China Journal of Cleaner Production. 174: 728-738. DOI: 10.1016/J.Jclepro.2017.10.150  0.307
2018 Shen L, Chen Y, Li H, Wei X, Ren Y. Development orientations for attracting investments – A perspective of less-developed townships in China Cities. 76: 84-95. DOI: 10.1016/J.Cities.2018.01.011  0.308
2018 Xu Z, Li S, Li H, Li Q. Modeling and problem solving of building defects using point clouds and enhanced case-based reasoning Automation in Construction. 96: 40-54. DOI: 10.1016/J.Autcon.2018.09.003  0.327
2018 Umer W, Li H, Lu W, Szeto GPY, Wong AYL. Development of a tool to monitor static balance of construction workers for proactive fall safety management Automation in Construction. 94: 438-448. DOI: 10.1016/J.Autcon.2018.07.024  0.344
2018 Li Y, Hu Y, Xia B, Skitmore M, Li H. Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects Automation in Construction. 95: 118-128. DOI: 10.1016/J.Autcon.2018.07.021  0.313
2018 Fang Q, Li H, Luo X, Ding L, Luo H, Li C. Computer vision aided inspection on falling prevention measures for steeplejacks in an aerial environment Automation in Construction. 93: 148-164. DOI: 10.1016/J.Autcon.2018.05.022  0.308
2018 Dong C, Wang F, Li H, Ding L, Luo H. Knowledge dynamics-integrated map as a blueprint for system development: Applications to safety risk management in Wuhan metro project Automation in Construction. 93: 112-122. DOI: 10.1016/J.Autcon.2018.05.014  0.316
2018 Antwi-Afari MF, Li H, Pärn EA, Edwards DJ. Critical success factors for implementing building information modelling (BIM): A longitudinal review Automation in Construction. 91: 100-110. DOI: 10.1016/J.Autcon.2018.03.010  0.346
2018 Fang Q, Li H, Luo X, Ding L, Luo H, Rose TM, An W. Detecting non-hardhat-use by a deep learning method from far-field surveillance videos Automation in Construction. 85: 1-9. DOI: 10.1016/J.Autcon.2017.09.018  0.305
2018 Kong L, Li H, Yu Y, Luo H, Skitmore M, Antwi-Afari MF. Quantifying the physical intensity of construction workers, a mechanical energy approach Advanced Engineering Informatics. 38: 404-419. DOI: 10.1016/J.Aei.2018.08.005  0.306
2018 Fang Q, Li H, Luo X, Ding L, Rose TM, An W, Yu Y. A deep learning-based method for detecting non-certified work on construction sites Advanced Engineering Informatics. 35: 56-68. DOI: 10.1016/J.Aei.2018.01.001  0.303
2017 Cao D, Li H, Wang G, Luo X, Yang X, Tan D. Dynamics of Project-Based Collaborative Networks for BIM Implementation: Analysis Based on Stochastic Actor-Oriented Models Journal of Management in Engineering. 33: 4016055. DOI: 10.1061/(Asce)Me.1943-5479.0000503  0.325
2017 Luo X, Li H, Dai F, Cao D, Yang X, Guo H. Hierarchical Bayesian Model of Worker Response to Proximity Warnings of Construction Safety Hazards: Toward Constant Review of Safety Risk Control Measures Journal of Construction Engineering and Management-Asce. 143: 4017006. DOI: 10.1061/(Asce)Co.1943-7862.0001277  0.307
2017 Cao D, Li H, Wang G, Huang T. Identifying and contextualising the motivations for BIM implementation in construction projects: An empirical study in China International Journal of Project Management. 35: 658-669. DOI: 10.1016/J.Ijproman.2016.02.002  0.344
2017 Yu Y, Guo H, Ding Q, Li H, Skitmore M. An experimental study of real-time identification of construction workers' unsafe behaviors Automation in Construction. 82: 193-206. DOI: 10.1016/J.Autcon.2017.05.002  0.33
2017 Li H, Yang X, Skitmore M, Wang F, Forsythe P. Automated classification of construction site hazard zones by crowd-sourced integrated density maps Automation in Construction. 81: 328-339. DOI: 10.1016/J.Autcon.2017.04.007  0.329
2017 Kong L, Li H, Luo H, Ding L, Luo X, Skitmore M. Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates Automation in Construction. 81: 34-43. DOI: 10.1016/J.Autcon.2017.03.016  0.305
2017 Li H, Li X, Luo X, Siebert J. Investigation of the causality patterns of non-helmet use behavior of construction workers Automation in Construction. 80: 95-103. DOI: 10.1016/J.Autcon.2017.02.006  0.322
2017 Yang X, Luo X, Li H, Luo X, Guo H. Location-based measurement and visualization for interdependence network on construction sites Advanced Engineering Informatics. 34: 36-45. DOI: 10.1016/J.Aei.2017.09.003  0.348
2016 Lu H, Wang H, Xie Y, Li H. Construction Material Safety-Stock Determination Under Nonstationary Stochastic Demand and Random Supply Yield Ieee Transactions On Engineering Management. DOI: 10.1109/Tem.2016.2536146  0.325
2016 Cao D, Li H, Wang G, Zhang W. Linking the Motivations and Practices of Design Organizations to Implement Building Information Modeling in Construction Projects: Empirical Study in China Journal of Management in Engineering. 32: 4016013. DOI: 10.1061/(Asce)Me.1943-5479.0000453  0.34
2016 Luo X, Li H, Huang T, Rose T. A field experiment of workers' responses to proximity warnings of static safety hazards on construction sites Safety Science. 84: 216-224. DOI: 10.1016/J.Ssci.2015.12.026  0.31
2016 Li H, Yang X, Wang F, Rose T, Chan G, Dong S. Stochastic state sequence model to predict construction site safety states through Real-Time Location Systems Safety Science. 84: 78-87. DOI: 10.1016/J.Ssci.2015.11.025  0.311
2016 Li H, Chan G, Wong JKW, Skitmore M. Real-time locating systems applications in construction Automation in Construction. 63: 37-47. DOI: 10.1016/J.Autcon.2015.12.001  0.303
2015 Liu W, Guo H, Li H, Li Y. Retraction Notice: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-Span Steel-Box Arch Bridge Project International Journal of Advanced Robotic Systems. 12: 96. DOI: 10.5772/61239  0.341
2015 Li H, Chan G, Skitmore M, Huang T. A 4D automatic simulation tool for construction resource planning: A case study Engineering, Construction and Architectural Management. 22: 536-550. DOI: 10.1108/Ecam-07-2014-0093  0.332
2015 Fan H, Xue F, Li H. Project-based as-needed information retrieval from unstructured AEC documents Journal of Management in Engineering. 31. DOI: 10.1061/(Asce)Me.1943-5479.0000341  0.336
2015 Li H, Lu M, Hsu SC, Gray M, Huang T. Proactive behavior-based safety management for construction safety improvement Safety Science. 75: 107-117. DOI: 10.1016/J.Ssci.2015.01.013  0.324
2015 Li H, Chan G, Huang T, Skitmore M, Tao TYE, Luo E, Chung J, Chan XS, Li YF. Chirp-spread-spectrum-based real time location system for construction safety management: A case study Automation in Construction. 55: 58-65. DOI: 10.1016/J.Autcon.2015.03.024  0.361
2015 Zhang H, Yang F, Li Y, Li H. Predicting profitability of listed construction companies based on principal component analysis and support vector machine—Evidence from China Automation in Construction. 53: 22-28. DOI: 10.1016/J.Autcon.2015.03.001  0.305
2015 Cao D, Wang G, Li H, Skitmore M, Huang T, Zhang W. Practices and effectiveness of building information modelling in construction projects in China Automation in Construction. 49: 113-122. DOI: 10.1016/J.Autcon.2014.10.014  0.351
2015 Li H, Lu M, Chan G, Skitmore M. Proactive training system for safe and efficient precast installation Automation in Construction. 49: 163-174. DOI: 10.1016/J.Autcon.2014.10.010  0.302
2014 Wong JKW, Li H, Chan G, Wang H, Huang T, Luo E, Li V. Virtual prototyping for construction site Co2 emissions and hazard detection International Journal of Advanced Robotic Systems. 11. DOI: 10.5772/58439  0.331
2014 Chen Z, Abdullah AB, Anumba CJ, Li H. ANP Experiment for Demolition Plan Evaluation Journal of Construction Engineering and Management-Asce. 140: 6013005. DOI: 10.1061/(Asce)Co.1943-7862.0000791  0.308
2013 Gulliford C, Bartnik A, Bazarov I, Cultrera L, Dobbins J, Dunham B, Gonzalez F, Karkare S, Lee H, Li H, Li Y, Liu X, Maxson J, Nguyen C, Smolenski K, et al. Demonstration of low emittance in the Cornell energy recovery linac injector prototype Physical Review Special Topics - Accelerators and Beams. 16. DOI: 10.1103/Physrevstab.16.073401  0.539
2013 Li H, Chan G, Skitmore M. Integrating real time positioning systems to improve blind lifting and loading crane operations Construction Management and Economics. 31: 596-605. DOI: 10.1080/01446193.2012.756144  0.313
2013 Jin Z, Deng F, Li H, Skitmore M. Practical Framework for Measuring Performance of International Construction Firms Journal of Construction Engineering and Management-Asce. 139: 1154-1167. DOI: 10.1061/(Asce)Co.1943-7862.0000718  0.322
2013 Lu W, Peng Y, Shen Q, Li H. Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction Tasks Journal of Construction Engineering and Management-Asce. 139: 195-203. DOI: 10.1061/(Asce)Co.1943-7862.0000585  0.305
2013 Fan H, Li H. Retrieving similar cases for alternative dispute resolution in construction accidents using text mining techniques Automation in Construction. 34: 85-91. DOI: 10.1016/J.Autcon.2012.10.014  0.315
2013 Guo HL, Li H, Li V. VP-based safety management in large-scale construction projects: A conceptual framework Automation in Construction. 34: 16-24. DOI: 10.1016/J.Autcon.2012.10.013  0.336
2013 Cheng F, Li H, Wang Y-, Skitmore M, Forsythe P. Modeling resource management in the building design process by information constraint Petri nets Automation in Construction. 29: 92-99. DOI: 10.1016/J.Autcon.2012.08.005  0.323
2012 Scott D, Cheong M, Li H. Web-based Construction Information Management System Australasian Journal of Construction Economics and Building. 3: 43-52. DOI: 10.5130/Ajceb.V3I1.2910  0.334
2012 Li H, Chan NKY, Skitmore M. The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes Construction Innovation: Information, Process, Management. 12: 429-446. DOI: 10.1108/14714171211272207  0.331
2012 Chun CK, Li H, Skitmore M. The use of virtual prototyping for hazard identification in the early design stage Construction Innovation. 12: 29-42. DOI: 10.1108/14714171211197481  0.353
2012 Li H, Guo H, Li Y, Skitmore M. From IKEA model to the lean construction concept : a solution to implementation The International Journal of Construction Management. 12: 47-63. DOI: 10.1080/15623599.2012.10773200  0.349
2012 Li H, Chan NKY, Huang T, Skitmore M, Yang J. Virtual prototyping for planning bridge construction Automation in Construction. 27: 1-10. DOI: 10.1016/J.Autcon.2012.04.009  0.347
2012 Li H, Chan G, Skitmore M. Visualizing safety assessment by integrating the use of game technology Automation in Construction. 22: 498-505. DOI: 10.1016/J.Autcon.2011.11.009  0.323
2012 Xue X, Shen Q, Fan H, Li H, Fan S. IT supported collaborative work in A/E/C projects: A ten-year review Automation in Construction. 21: 1-9. DOI: 10.1016/J.Autcon.2011.05.016  0.334
2011 Diao X, Li H, Zeng S, Tam VWY, Guo H. A pareto multi-objective optimization approach for solving time-cost-quality tradeoff problems Technological and Economic Development of Economy. 17: 22-41. DOI: 10.3846/13928619.2011.553988  0.303
2011 Li H, Bazarov IV, Dunham BM, Wise FW. Three-dimensional laser pulse intensity diagnostic for photoinjectors Physical Review Special Topics - Accelerators and Beams. 14. DOI: 10.1103/Physrevstab.14.112802  0.555
2011 Li H, Guo H, Skitmore M, Huang T, Chan KYN, Chan G. Rethinking prefabricated construction management using the VP‐based IKEA model in Hong Kong Construction Management and Economics. 29: 233-245. DOI: 10.1080/01446193.2010.545994  0.351
2011 Ding LY, Wu XG, Li H, Luo HB, Zhou Y. Study on safety control for Wuhan metro construction in complex environments International Journal of Project Management. 29: 797-807. DOI: 10.1016/J.Ijproman.2011.04.006  0.313
2011 Chen Z, Li H, Ren H, Xu Q, Hong J. A total environmental risk assessment model for international hub airports International Journal of Project Management. 29: 856-866. DOI: 10.1016/J.Ijproman.2011.03.004  0.314
2011 Lu W, Huang GQ, Li H. Scenarios for applying RFID technology in construction project management Automation in Construction. 20: 101-106. DOI: 10.1016/J.Autcon.2010.09.007  0.341
2010 Guo H, Li H, Skitmore M. Life-cycle management of construction projects based on virtual prototyping technology Journal of Management in Engineering. 26: 41-47. DOI: 10.1061/(Asce)0742-597X(2010)26:1(41)  0.351
2010 Wong JKW, Li H. Construction, application and validation of selection evaluation model (SEM) for intelligent HVAC control system Automation in Construction. 19: 261-269. DOI: 10.1016/J.Autcon.2009.10.002  0.33
2009 Wong JKW, Li H. Development of intelligence analytic models for integrated building management systems (IBMS) in intelligent buildings Intelligent Buildings International. 1: 5-22. DOI: 10.3763/Inbi.2009.0011  0.338
2009 Huang T, Li H, Guo H, Chan N, Kong S, Chan G, Skitmore M. Construction virtual prototyping: a survey of use Construction Innovation: Information, Process, Management. 9: 420-433. DOI: 10.1108/14714170910995958  0.356
2009 Baldwin A, Li H, Huang T, Kong CW, Guo HL, Chan N, Wong J. Supporting pre‐tender construction planning with virtual prototyping Engineering, Construction and Architectural Management. 16: 150-161. DOI: 10.1108/09699980910938028  0.369
2009 Yao X, Li H. Pentagon Tri-Wheel Model (PTW): A New Project Management Model Based on Complexity Theory The International Journal of Construction Management. 9: 43-60. DOI: 10.1080/15623599.2009.10773121  0.332
2009 Li H, Lu W, Huang T. Rethinking project management and exploring virtual design and construction as a potential solution Construction Management and Economics. 27: 363-371. DOI: 10.1080/01446190902838217  0.35
2009 Li H, Chan N, Huang T, Guo H, Lu W, Skitmore M. Optimizing construction planning schedules by virtual prototyping enabled resource analysis Automation in Construction. 18: 912-918. DOI: 10.1016/J.Autcon.2009.04.002  0.348
2008 Li H, Guo H, Skibniewski MJ, Skitmore M. Using the IKEA model and virtual prototyping technology to improve construction process management Construction Management and Economics. 26: 991-1000. DOI: 10.1080/01446190802290477  0.35
2008 Zhang H, Li H, Lu M. Modeling Time-Constraints in Construction Operations through Simulation Journal of Construction Engineering and Management-Asce. 134: 545-554. DOI: 10.1061/(Asce)0733-9364(2008)134:7(545)  0.307
2008 Chen Z, Li H, Ross A, Khalfan MMA, Kong SCW. Knowledge-driven ANP approach to vendors evaluation for sustainable construction Journal of Construction Engineering and Management-Asce. 134: 928-941. DOI: 10.1061/(Asce)0733-9364(2008)134:12(928)  0.354
2008 Li H, Huang T, Kong CW, Guo HL, Baldwin A, Chan N, Wong J. Integrating design and construction through virtual prototyping Automation in Construction. 17: 915-922. DOI: 10.1016/J.Autcon.2008.02.016  0.356
2008 Wong J, Li H, Lai J. Evaluating the system intelligence of the intelligent building systems: Part 2: Construction and validation of analytical models Automation in Construction. 17: 303-321. DOI: 10.1016/J.Autcon.2007.06.003  0.325
2008 Wong J, Li H, Lai J. Evaluating the system intelligence of the intelligent building systems: Part 1: Development of key intelligent indicators and conceptual analytical framework Automation in Construction. 17: 284-302. DOI: 10.1016/J.Autcon.2007.06.002  0.333
2007 Zhou S, Ouzounov D, Li H, Bazarov I, Dunham B, Sinclair C, Wise FW. Efficient temporal shaping of ultrashort pulses with birefringent crystals. Applied Optics. 46: 8488-92. PMID 18071380 DOI: 10.1364/Ao.46.008488  0.546
2007 Cheng EWL, Li H, Fox P. Job performance dimensions for improving final project outcomes Journal of Construction Engineering and Management-Asce. 133: 592-599. DOI: 10.1061/(Asce)0733-9364(2007)133:8(592)  0.319
2007 Guo H, Li H, Shen Q, Wang Y, Li Y. Real estate confidence index based on Web GIS and SPSS WebAPP International Journal of Project Management. 25: 171-177. DOI: 10.1016/J.Ijproman.2006.09.015  0.323
2007 Cheng EW, Li H, Yu L. A GIS approach to shopping mall location selection Building and Environment. 42: 884-892. DOI: 10.1016/J.Buildenv.2005.10.010  0.316
2007 Cheng EWL, Li H. Application of ANP in process models: An example of strategic partnering Building and Environment. 42: 278-287. DOI: 10.1016/J.Buildenv.2005.07.031  0.306
2007 Huang T, Kong CW, Guo HL, Baldwin A, Li H. A virtual prototyping system for simulating construction processes Automation in Construction. 16: 576-585. DOI: 10.1016/J.Autcon.2006.09.007  0.344
2006 Xiang D, Li H. Adopting Leveraged Buyout (LBO) Mechanism for Improving the Competitiveness of the State-Owned Construction Enterprises The International Journal of Construction Management. 6: 63-74. DOI: 10.1080/15623599.2006.10773088  0.302
2006 Wong JKW, Wong PNK, Li H. The adjustment of leadership styles in intercultural workplace – some evidences from the multinational construction companies in Hong Kong Hkie Transactions. 13: 31-40. DOI: 10.1080/1023697X.2006.10668038  0.308
2006 Zhang H, Li H, Tam CM. Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects Construction Management and Economics. 24: 159-169. DOI: 10.1080/01446190500184311  0.317
2006 Cheng EWL, Li H. Job Performance Evaluation for Construction Companies: An Analytic Network Process Approach Journal of Construction Engineering and Management-Asce. 132: 827-835. DOI: 10.1061/(Asce)0733-9364(2006)132:8(827)  0.31
2006 Chen Z, Clements-Croome D, Hong J, Li H, Xu Q. A multicriteria lifespan energy efficiency approach to intelligent building assessment Energy and Buildings. 38: 393-409. DOI: 10.1016/J.Enbuild.2005.08.001  0.321
2005 Li H, Yu L, Cheng EWL. A GIS‐based site selection system for real estate projects Construction Innovation. 5: 231-241. DOI: 10.1108/14714170510815276  0.315
2005 Cheng EW, Li H, Yu L. The analytic network process (ANP) approach to location selection: a shopping mall illustration Construction Innovation. 5: 83-97. DOI: 10.1108/14714170510815195  0.305
2005 Chen Z, Li H, Kong SCW, Xu Q. A knowledge‐driven management approach to environmental‐conscious construction Construction Innovation: Information, Process, Management. 5: 27-39. DOI: 10.1108/14714170510815159  0.342
2005 Li H, Shen QP, Love PED. Cost modelling of office buildings in Hong Kong: an exploratory study Facilities. 23: 438-452. DOI: 10.1108/02632770510602379  0.313
2005 Cheng EWL, Li H. Analytic network process applied to project selection Journal of Construction Engineering and Management-Asce. 131: 459-466. DOI: 10.1061/(Asce)0733-9364(2005)131:4(459)  0.342
2005 Chen Z, Li H, Wong CTC. EnvironalPlanning : Analytic Network Process Model for Environmentally Conscious Construction Planning Journal of Construction Engineering and Management-Asce. 131: 92-101. DOI: 10.1061/(Asce)0733-9364(2005)131:1(92)  0.326
2005 Li H, Chen Z, Yong L, Kong SCW. Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency Automation in Construction. 14: 323-331. DOI: 10.1016/J.Autcon.2004.08.007  0.31
2005 Cao Y, Li H, Liang Y. Using engineering drawing interpretation for automatic detection of version information in CADD engineering drawing Automation in Construction. 14: 361-367. DOI: 10.1016/J.Autcon.2004.08.004  0.31
2005 Brandon P, Li H, Shen Q. Construction IT and the 'tipping point' Automation in Construction. 14: 281-286. DOI: 10.1016/J.Autcon.2004.08.002  0.318
2004 Shen Q, Li H, Chung J, Hui PY. A framework for identification and representation of client requirements in the briefing process Construction Management and Economics. 22: 213-221. DOI: 10.1080/0144619042000201411  0.344
2004 Chen Z, Li H, Shen Q, Xu W. An empirical model for decision-making on ISO 14000 acceptance in the Shanghai construction industry Construction Management and Economics. 22: 55-73. DOI: 10.1080/0144619042000186068  0.343
2004 Cheng EWL, Li H. Development of a Practical Model of Partnering for Construction Projects Journal of Construction Engineering and Management-Asce. 130: 790-798. DOI: 10.1061/(Asce)0733-9364(2004)130:6(790)  0.316
2004 Liu G, Shen Q, Li H, Shen L. Factors constraining the development of professional project management in China's construction industry International Journal of Project Management. 22: 203-211. DOI: 10.1016/S0263-7863(03)00068-1  0.344
2004 Fang D, Xie F, Huang X, Li H. Factor analysis-based studies on construction workplace safety management in China International Journal of Project Management. 22: 43-49. DOI: 10.1016/S0263-7863(02)00115-1  0.31
2004 Cheng EWL, Li H. Exploring quantitative methods for project location selection Building and Environment. 39: 1467-1476. DOI: 10.1016/J.Buildenv.2004.03.015  0.339
2004 Cheng EWL, Li H, Love PED, Irani Z. Strategic alliances: a model for establishing long-term commitment to inter-organizational relations in construction Building and Environment. 39: 459-468. DOI: 10.1016/J.Buildenv.2003.09.014  0.334
2004 Chen Z, Li H, Hong J. An integrative methodology for environmental management in construction Automation in Construction. 13: 621-628. DOI: 10.1016/J.Autcon.2004.04.006  0.354
2004 Shen Q, Chung JKH, Li H, Shen L. A Group Support System for improving value management studies in construction Automation in Construction. 13: 209-224. DOI: 10.1016/J.Autcon.2003.07.001  0.328
2003 Li H, Chen Z, Wong CTC. Barcode technology for an incentive reward program to reduce construction wastes Computer-Aided Civil and Infrastructure Engineering. 18: 313-324. DOI: 10.1111/1467-8667.00320  0.318
2003 Shen Q, Li H, Shen L, Drew D, Chung J. Benchmarking the use of information technology by the quantity surveying profession Benchmarking: An International Journal. 10: 581-596. DOI: 10.1108/14635770310505193  0.326
2003 Li H, Kong CW, Pang YC, Shi WZ, Yu L. Internet-Based Geographical Information Systems System for E-Commerce Application in Construction Material Procurement Journal of Construction Engineering and Management. 129: 689-697. DOI: 10.1061/(Asce)0733-9364(2003)129:6(689)  0.305
2003 Ogunlana SO, Li H, Sukhera FA. System Dynamics Approach to Exploring Performance Enhancement in a Construction Organization Journal of Construction Engineering and Management-Asce. 129: 528-536. DOI: 10.1061/(Asce)0733-9364(2003)129:5(528)  0.311
2003 Lu M, Li H. Resource-Activity Critical-Path Method For Construction Planning Journal of Construction Engineering and Management-Asce. 129: 412-420. DOI: 10.1061/(Asce)0733-9364(2003)129:4(412)  0.338
2003 Li H, Ma Z, Shen Q, Kong S. Virtual experiment of innovative construction operations Automation in Construction. 12: 561-575. DOI: 10.1016/S0926-5805(03)00019-0  0.33
2002 Cheng EWL, Li H, Love PED, Irani Z. A generic conceptual framework for a Total Information Networking System in construction International Journal of Services Technology and Management. 3: 125-138. DOI: 10.1504/Ijstm.2002.001621  0.334
2002 Love PED, Holt GD, Li H. Triangulation in construction management research Engineering, Construction and Architectural Management. 9: 294-303. DOI: 10.1108/Eb021224  0.307
2002 Love PED, Irani Z, Cheng E, Li H. A model for supporting inter-organizational relations in the supply chain Engineering, Construction and Architectural Management. 9: 2-15. DOI: 10.1108/Eb021202  0.325
2002 Li H, Chen Z, Wong CTC, Love PED. A quantitative approach to construction pollution control based on resource levelling Construction Innovation: Information, Process, Management. 2: 71-81. DOI: 10.1108/14714170210814694  0.319
2002 Li H, Tang S, Love PED. VHBuild.com: a Web‐based system for managing knowledge in projects Internet Research. 12: 371-379. DOI: 10.1108/10662240210447128  0.316
2002 Chen Z, Li H, Wong CTC, Love PED. Integrating construction pollution control with construction schedule: an experimental approach Environmental Management and Health. 13: 142-151. DOI: 10.1108/09566160210424572  0.327
2002 Josephson P, Larsson B, Li H. Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry Journal of Management in Engineering. 18: 76-83. DOI: 10.1061/(Asce)0742-597X(2002)18:2(76)  0.335
2002 Shen LY, Li H, Li QM. Alternative Concession Model for Build Operate Transfer Contract Projects Journal of Construction Engineering and Management-Asce. 128: 326-330. DOI: 10.1061/(Asce)0733-9364(2002)128:4(326)  0.339
2002 Cao Y, Wang S, Li H. Automatic recognition of tables in construction tender documents Automation in Construction. 11: 573-584. DOI: 10.1016/S0926-5805(01)00067-X  0.313
2002 Chen Z, Li H, Wong CT. An application of bar-code system for reducing construction wastes Automation in Construction. 11: 521-533. DOI: 10.1016/S0926-5805(01)00063-2  0.329
2002 Love PE, Holt GD, Shen LY, Li H, Irani Z. Using systems dynamics to better understand change and rework in construction project management systems International Journal of Project Management. 20: 425-436. DOI: 10.1016/S0263-7863(01)00039-4  0.32
2001 Shen Q, Li H, Deng Z. Intelligent multimedia for expertise‐intensive training in construction Logistics Information Management. 14: 386-393. DOI: 10.1108/Eum0000000006250  0.307
2001 Cheng EWL, Li H. Development of a conceptual model of construction partnering Engineering, Construction and Architectural Management. 8: 292-303. DOI: 10.1108/Eb021190  0.338
2001 Love PED, Irani Z, Li H, Cheng EWL, Tse RYC. An empirical analysis of the barriers to implementing e‐commerce in small‐medium sized construction contractors in the state of Victoria, Australia Construction Innovation: Information, Process, Management. 1: 31-41. DOI: 10.1108/14714170110814497  0.31
2001 Cheng EWL, Li H, Love PED, Irani Z. An e‐business model to support supply chain activities in construction Logistics Information Management. 14: 68-78. DOI: 10.1108/09576050110363239  0.305
2001 Cheng EWL, Li H, Drew DS, Yeung N. Infrastructure of Partnering for Construction Projects Journal of Management in Engineering. 17: 229-237. DOI: 10.1061/(Asce)0742-597X(2001)17:4(229)  0.327
2001 Deng ZM, Li H, Tam CM, Shen QP, Love PED. An application of the Internet-based project management system Automation in Construction. 10: 239-246. DOI: 10.1016/S0926-5805(99)00037-0  0.332
2001 Li H, Cheng EWL, Love PED, Irani Z. Co-operative benchmarking: a tool for partnering excellence in construction International Journal of Project Management. 19: 171-179. DOI: 10.1016/S0263-7863(99)00033-2  0.32
2000 Li H, Love PED, Drew DS. Effects of overtime work and additional resources on project cost and quality Engineering, Construction and Architectural Management. 7: 211-220. DOI: 10.1108/Eb021146  0.331
2000 Li H, Cheng EWL, Love PED. Partnering research in construction Engineering, Construction and Architectural Management. 7: 76-92. DOI: 10.1108/Eb021134  0.34
2000 Love PED, Li H. Quantifying the causes and costs of rework in construction Construction Management and Economics. 18: 479-490. DOI: 10.1080/01446190050024897  0.309
2000 Cheng EWL, Li H, Love PED. Establishment of Critical Success Factors for Construction Partnering Journal of Management in Engineering. 16: 84-92. DOI: 10.1061/(Asce)0742-597X(2000)16:2(84)  0.324
2000 Chen Z, Li H, Wong CTC. Environmental management of urban construction projects in China Journal of Construction Engineering and Management-Asce. 126: 320-324. DOI: 10.1061/(Asce)0733-9364(2000)126:4(320)  0.342
1999 Love PED, Smith J, Li H. The propagation of rework benchmark metrics for construction International Journal of Quality & Reliability Management. 16: 638-658. DOI: 10.1108/02656719910249829  0.35
1999 Faniran OO, Love PED, Li H. Optimal allocation of construction planning resources Journal of Construction Engineering and Management-Asce. 125: 311-319. DOI: 10.1061/(Asce)0733-9364(1999)125:5(311)  0.316
1999 Li H, Scott D, Love PED. Narrowing the expectation gap of construction information technologies between academic preparation and industrial needs Computer Applications in Engineering Education. 7: 244-251. DOI: 10.1002/(Sici)1099-0542(1999)7:4<244::Aid-Cae6>3.0.Co;2-X  0.304
1998 Love PED, Li H. From BPR to CPR ‐ conceptualising re‐engineering in construction Business Process Management Journal. 4: 291-305. DOI: 10.1108/14637159810238192  0.35
1998 Li H. Petri net as a formalism to assist process improvement in the construction industry Automation in Construction. 7: 349-356. DOI: 10.1016/S0926-5805(98)00051-X  0.333
1998 Love PED, Gunasekaran A, Li H. Concurrent engineering : a strategy for procuring construction projects International Journal of Project Management. 16: 375-383. DOI: 10.1016/S0263-7863(97)00066-5  0.347
1997 Li H. Determinants of knowledge-based expert system success in construction engineering : Analysis and identification of five factors that largely determine the success or failure of a KBES project for construction problem-solving tasks Building Research and Information. 25: 101-106. DOI: 10.1080/096132197370480  0.308
1996 Li H. Towards quantitatively measuring the performance of construction IT systems: Identifies need to establish a quantitative method to measure performance of construction IT systems and indentifies measurement indicators Building Research and Information. 24: 379-382. DOI: 10.1080/09613219608727560  0.303
1995 Li H. A new connectionist approach to implementing knowledge-based construction performance management systems — conceptual design: Explores how connectionist models can be adapted to model important aspects of construction diagnostic processes Building Research &Amp; Information. 23: 156-161. DOI: 10.1080/09613219508727449  0.304
Show low-probability matches.