Carl T. Haas - Publications

Affiliations: 
University of Texas at Austin, Austin, Texas, U.S.A. 
Area:
Civil Engineering, Industrial Engineering, Labor Economics

160 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Shahi S, Esfahani ME, Bachmann C, Haas C. A definition framework for building adaptation projects. Sustainable Cities and Society. 63: 102345. PMID 32837869 DOI: 10.1016/J.Scs.2020.102345  0.405
2020 Rausch C, Edwards C, Haas C. Benchmarking and Improving Dimensional Quality on Modular Construction Projects – A Case Study International Journal of Integrated Care. 1: 2-21. DOI: 10.29173/Ijic212  0.395
2020 Chen Q, Adey BT, Haas CT, Hall DM. Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies Construction Innovation: Information, Process, Management. 20: 471-508. DOI: 10.1108/Ci-11-2019-0133  0.403
2020 Enshassi MSA, Walbridge S, West JS, Haas CT. Probabilistic Risk Management Framework for Tolerance-Related Issues in Modularized Projects: Local and Global Perspectives Asce-Asme Journal of Risk and Uncertainty in Engineering Systems, Part a: Civil Engineering. 6: 4019022. DOI: 10.1061/Ajrua6.0001036  0.334
2020 Esfahani ME, Rausch C, Haas C, Adey BT. Prioritizing Preproject Planning Activities Using Value of Information Analysis Journal of Management in Engineering. 36: 4020064. DOI: 10.1061/(Asce)Me.1943-5479.0000822  0.327
2020 Enshassi MSA, Walbridge S, West JS, Haas CT. Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory Journal of Construction Engineering and Management-Asce. 146: 4019096. DOI: 10.1061/(Asce)Co.1943-7862.0001747  0.372
2020 Sanchez B, Rausch C, Haas C, Saari R. A selective disassembly multi-objective optimization approach for adaptive reuse of building components Resources Conservation and Recycling. 154: 104605. DOI: 10.1016/J.Resconrec.2019.104605  0.395
2020 Chan J, Bachmann C, Haas C. Potential economic and energy impacts of substituting adaptive reuse for new building construction: A case study of Ontario Journal of Cleaner Production. 259: 120939. DOI: 10.1016/J.Jclepro.2020.120939  0.389
2020 Ryu J, McFarland T, Banting B, Haas CT, Abdel-Rahman E. Health and productivity impact of semi-automated work systems in construction Automation in Construction. 120: 103396. DOI: 10.1016/J.Autcon.2020.103396  0.364
2019 Eray E, Sanchez B, Haas C. Usage of Interface Management System in Adaptive Reuse of Buildings Buildings. 9: 105. DOI: 10.3390/Buildings9050105  0.415
2019 Enshassi MSA, Walbridge S, West JS, Haas CT. Integrated Risk Management Framework for Tolerance-Based Mitigation Strategy Decision Support in Modular Construction Projects Journal of Management in Engineering. 35: 5019004. DOI: 10.1061/(Asce)Me.1943-5479.0000698  0.398
2019 Kwiatek C, Sharif M, Li S, Haas C, Walbridge S. Impact of augmented reality and spatial cognition on assembly in construction Automation in Construction. 108: 102935. DOI: 10.1016/J.Autcon.2019.102935  0.327
2019 Sanchez B, Rausch C, Haas C. Deconstruction programming for adaptive reuse of buildings Automation in Construction. 107: 102921. DOI: 10.1016/J.Autcon.2019.102921  0.369
2019 Zhang L, Diraneyya MM, Ryu J, Haas CT, Abdel-Rahman EM. Jerk as an indicator of physical exertion and fatigue Automation in Construction. 104: 120-128. DOI: 10.1016/J.Autcon.2019.04.016  0.317
2019 Rausch C, Nahangi M, Haas C, Liang W. Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction Automation in Construction. 103: 300-314. DOI: 10.1016/J.Autcon.2019.03.026  0.336
2019 Nahangi M, Czerniawski T, Haas CT, Walbridge S. Pipe radius estimation using Kinect range cameras Automation in Construction. 99: 197-205. DOI: 10.1016/J.Autcon.2018.12.015  0.331
2019 Sanchez B, Esfahani ME, Haas C. A methodology to analyze the net environmental impacts and building’s cost performance of an adaptive reuse project: a case study of the Waterloo County Courthouse renovations Environment Systems and Decisions. 39: 419-438. DOI: 10.1007/S10669-019-09734-2  0.388
2018 Sanchez B, Haas C. Capital project planning for a circular economy Construction Management and Economics. 36: 303-312. DOI: 10.1080/01446193.2018.1435895  0.415
2018 Shen W, Choi B, Lee S, Tang W, Haas CT. How to Improve Interface Management Behaviors in EPC Projects: Roles of Formal Practices and Social Norms Journal of Management in Engineering. 34: 04018032. DOI: 10.1061/(Asce)Me.1943-5479.0000639  0.317
2018 Sanchez B, Haas C. A novel selective disassembly sequence planning method for adaptive reuse of buildings Journal of Cleaner Production. 183: 998-1010. DOI: 10.1016/J.Jclepro.2018.02.201  0.349
2018 Golzarpoor B, Haas CT, Rayside D, Kang S, Weston M. Improving construction industry process interoperability with Industry Foundation Processes (IFP) Advanced Engineering Informatics. 38: 555-568. DOI: 10.1016/J.Aei.2018.09.001  0.395
2017 Zhang D, Nasir H, Haas CT. Development of an internal benchmarking and metrics model for industrial construction enterprises for productivity improvement Canadian Journal of Civil Engineering. 44: 518-529. DOI: 10.1139/Cjce-2016-0274  0.408
2017 Sharif M, Nahangi M, Haas CT, West J. Automated Model-Based Finding of 3D Objects in Cluttered Construction Point Cloud Models. Computer-Aided Civil and Infrastructure Engineering. 32: 893-908. DOI: 10.1111/Mice.12306  0.36
2017 Shahtaheri M, Haas CT, Salimi T. A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects Engineering, Construction and Architectural Management. 24: 40-60. DOI: 10.1108/Ecam-10-2015-0165  0.402
2017 Ahn S, Shokri S, Lee S, Haas CT, Haas RCG. Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction Projects Journal of Management in Engineering. 33: 4016039. DOI: 10.1061/(Asce)Me.1943-5479.0000488  0.372
2017 Rausch C, Nahangi M, Perreault M, Haas CT, West J. Optimum Assembly Planning for Modular Construction Components Journal of Computing in Civil Engineering. 31: 4016039. DOI: 10.1061/(Asce)Cp.1943-5487.0000605  0.327
2017 Seo JO, Alwasel A, Lee SH, Abdel-Rahman EM, Haas C. A comparative study of in-field motion capture approaches for body kinematics measurement in construction Robotica. 37: 928-946. DOI: 10.1017/S0263574717000571  0.309
2017 Safa M, Safa M, Allen J, Shahi A, Haas CT. Improving sustainable office building operation by using historical data and linear models to predict energy usage Sustainable Cities and Society. 29: 107-117. DOI: 10.1016/J.Scs.2016.12.001  0.304
2017 Alwasel A, Sabet A, Nahangi M, Haas CT, Abdel-Rahman E. Identifying poses of safe and productive masons using machine learning Automation in Construction. 84: 345-355. DOI: 10.1016/J.Autcon.2017.09.022  0.325
2017 Shahtaheri Y, Rausch C, West J, Haas C, Nahangi M. Managing risk in modular construction using dimensional and geometric tolerance strategies Automation in Construction. 83: 303-315. DOI: 10.1016/J.Autcon.2017.03.011  0.433
2017 Rausch C, Nahangi M, Haas C, West J. Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds Automation in Construction. 75: 33-44. DOI: 10.1016/J.Autcon.2016.12.001  0.406
2016 Karimidorabati S, Haas CT, Gray J. Evaluation of automation levels for construction change management Engineering, Construction and Architectural Management. 23: 554-570. DOI: 10.1108/Ecam-01-2015-0013  0.41
2016 Safa M, Shahi A, Haas CT, Hipel KW. Construction contract management using value packaging systems International Journal of Construction Management. 1-15. DOI: 10.1080/15623599.2016.1167369  0.443
2016 Fiolet JC, Haas C, Hipel K. Risk-chasing behaviour in on-site construction decisions Construction Management and Economics. 34: 845-858. DOI: 10.1080/01446193.2016.1207790  0.307
2016 Shan Y, Zhai D, Goodrum PM, Haas CT, Caldas CH. Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects Journal of Management in Engineering. 32. DOI: 10.1061/(Asce)Me.1943-5479.0000375  0.45
2016 Nasir H, Haas CT, Caldas CH, Goodrum PM. An integrated productivity-practices implementation index for planning the execution of infrastructure projects Journal of Infrastructure Systems. 22. DOI: 10.1061/(Asce)Is.1943-555X.0000275  0.404
2016 Safa M, Yee M, Rayside D, Haas CT. Optimizing Contractor Selection for Construction Packages in Capital Projects Journal of Computing in Civil Engineering. 30: 4016002-4016002. DOI: 10.1061/(Asce)Cp.1943-5487.0000555  0.415
2016 Nahangi M, Czerniawski T, Haas CT, Walbridge S, West J. Parallel systems and structural frames realignment planning and actuation strategy Journal of Computing in Civil Engineering. 30. DOI: 10.1061/(Asce)Cp.1943-5487.0000545  0.374
2016 Antony Chettupuzha AJ, Haas CT. Algorithm for Determining the Criticality of Documents within a Construction Information System Journal of Computing in Civil Engineering. 30. DOI: 10.1061/(Asce)Cp.1943-5487.0000515  0.422
2016 Nahangi M, Haas CT, West J, Walbridge S. Automatic Realignment of Defective Assemblies Using an Inverse Kinematics Analogy Journal of Computing in Civil Engineering. 30. DOI: 10.1061/(Asce)Cp.1943-5487.0000477  0.355
2016 Shokri S, Ahn S, Lee S, Haas CT, Haas RCG. Current status of interface management in construction: Drivers and effects of systematic interface management Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001035  0.437
2016 Shokri S, Haas CT, Haas RCG, Lee SH. Interface-management process for managing risks in complex capital projects Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0000990  0.39
2016 Czerniawski T, Nahangi M, Haas C, Walbridge S. Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor Automation in Construction. 71: 346-358. DOI: 10.1016/J.Autcon.2016.08.011  0.339
2016 Nahangi M, Haas CT. Skeleton-based discrepancy feedback for automated realignment of industrial assemblies Automation in Construction. 61: 147-161. DOI: 10.1016/J.Autcon.2015.10.014  0.352
2016 Golzarpoor B, Haas CT, Rayside D. Improving process conformance with Industry Foundation Processes (IFP) Advanced Engineering Informatics. 30: 143-156. DOI: 10.1016/J.Aei.2016.02.005  0.378
2015 Rehan R, Unger A, Knight MA, Haas C. Strategic water utility management and financial planning using a new system dynamics tool Journal - American Water Works Association. 107: E22-E36. DOI: 10.5942/Jawwa.2015.107.0006  0.305
2015 Shahi A, Safa M, Haas CT, West JS. Data Fusion Process Management for Automated Construction Progress Estimation Journal of Computing in Civil Engineering. 29. DOI: 10.1061/(Asce)Cp.1943-5487.0000436  0.439
2015 Caldas CH, Kim JY, Haas CT, Goodrum PM, Zhang D. Method to assess the level of implementation of productivity practices on industrial projects Journal of Construction Engineering and Management. 141. DOI: 10.1061/(Asce)Co.1943-7862.0000919  0.425
2015 Yeung J, Walbridge S, Haas C. The role of geometric characterization in supporting structural steel reuse decisions Resources, Conservation and Recycling. 104: 120-130. DOI: 10.1016/J.Resconrec.2015.08.017  0.326
2015 Safa M, Shahi A, Nahangi M, Haas C, Noori H. Automating measurement process to improve quality management for piping fabrication Structures. 3: 71-80. DOI: 10.1016/J.Istruc.2015.03.003  0.414
2015 Nahangi M, Yeung J, Haas CT, Walbridge S, West J. Automated assembly discrepancy feedback using 3D imaging and forward kinematics Automation in Construction. 56: 36-46. DOI: 10.1016/J.Autcon.2015.04.005  0.377
2015 Safa M, Shahi A, Haas CT, Fiander-McCann D, Hipel K, MacGillivray S. Competitive intelligence (CI) for evaluation of construction contractors Automation in Construction. 59: 149-157. DOI: 10.1016/J.Autcon.2015.02.009  0.351
2015 Patraucean V, Armeni I, Nahangi M, Yeung J, Brilakis I, Haas C. State of research in automatic as-built modelling 32nd International Symposium On Automation and Robotics in Construction and Mining: Connected to the Future, Proceedings. DOI: 10.1016/J.Aei.2015.01.001  0.383
2015 Nahangi M, Haas CT. Automated 3D compliance checking in pipe spool fabrication Advanced Engineering Informatics. 28: 360-369. DOI: 10.1016/J.Aei.2014.04.001  0.388
2014 Shan Y, Kim JY, Goodrum PM, Caldas CH, Haas C. Impact of steel quick connection system on steel erection labor productivity: Case studies and simulation based analyses Canadian Journal of Civil Engineering. 41: 1036-1045. DOI: 10.1139/Cjce-2014-0079  0.361
2014 Turkan Y, Bosché F, Haas CT, Haas R. Tracking of secondary and temporary objects in structural concrete work Construction Innovation. 14: 145-167. DOI: 10.1108/Ci-12-2012-0063  0.38
2014 Nasir H, Ahmed H, Haas C, Goodrum PM. An analysis of construction productivity differences between Canada and the United States Construction Management and Economics. 32: 595-607. DOI: 10.1080/01446193.2013.848995  0.317
2014 Nahangi M, Yeung J, Amaral J, Freitas FN, Walbridge S, Haas CT. Automated deviation analysis for as-built status assessment of steel assemblies and pipe spools Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference On Computing in Civil and Building Engineering. 2063-2070. DOI: 10.1061/9780784413616.256  0.414
2014 Bosché F, Guillemet A, Turkan Y, Haas CT, Haas R. Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system Journal of Computing in Civil Engineering. 28. DOI: 10.1061/(Asce)Cp.1943-5487.0000343  0.421
2014 Ahmed MF, Haas CT, Haas R. Automatic detection of cylindrical objects in built facilities Journal of Computing in Civil Engineering. 28. DOI: 10.1061/(Asce)Cp.1943-5487.0000329  0.434
2014 Shahi A, Haas CT, West JS, Akinci B. Workflow-based construction research data management and dissemination Journal of Computing in Civil Engineering. 28: 244-252. DOI: 10.1061/(Asce)Cp.1943-5487.0000251  0.364
2014 Shahtaheri M, Nasir H, Haas CT. Setting baseline rates for on-site work categories in the construction industry Journal of Construction Engineering and Management. 141. DOI: 10.1061/(Asce)Co.1943-7862.0000959  0.403
2014 Liu J, Shahi A, Haas CT, Goodrum P, Caldas CH. Validation methodologies and their impact in construction productivity research Journal of Construction Engineering and Management. 140. DOI: 10.1061/(Asce)Co.1943-7862.0000882  0.362
2014 Rehan R, Unger AJA, Knight MA, Haas CT. Financially sustainable management strategies for urban wastewater collection infrastructure - Implementation of a system dynamics model Tunnelling and Underground Space Technology. 39: 102-115. DOI: 10.1016/J.Tust.2012.12.003  0.351
2014 Safa M, Shahi A, Haas CT, Hipel KW. Supplier selection process in an integrated construction materials management model Automation in Construction. 48: 64-73. DOI: 10.1016/J.Autcon.2014.08.008  0.434
2014 Bosché F, Ahmed M, Turkan Y, Haas CT, Haas R. The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components Automation in Construction. DOI: 10.1016/J.Autcon.2014.05.014  0.418
2013 Safa M, Haas CT, Hipel KW, Gray J. Front End Planning Tool (FEPT) Based on an Electronic Process Management Journal of Construction Engineering and Project Management. 3: 1-12. DOI: 10.6106/Jcepm.2013.3.2.001  0.415
2013 Vaziri SH, Haas CT, Rothenburg L, Haas RC. Investigation of the effect of weight factor on performance of piezoelectric weigh-in-motion sensors Journal of Transportation Engineering. 139: 913-922. DOI: 10.1061/(Asce)Te.1943-5436.0000561  0.306
2013 Turkan Y, Bosché F, Haas CT, Haas R. Toward automated earned value tracking using 3D imaging tools Journal of Construction Engineering and Management. 139: 423-433. DOI: 10.1061/(Asce)Co.1943-7862.0000629  0.39
2013 Shahi A, West JS, Haas CT. Onsite 3D marking for construction activity tracking Automation in Construction. 30: 136-143. DOI: 10.1016/J.Autcon.2012.11.027  0.385
2013 Karimidorabati S, Haas CT, Gray J. A model for implementing & continuously improving the automated change management process for construction mega projects Isarc 2013 - 30th International Symposium On Automation and Robotics in Construction and Mining, Held in Conjunction With the 23rd World Mining Congress. 643-652.  0.334
2013 Shan Y, Goodrum PM, Haas CT, Caldas CH, Zhai D. A comprehensive analysis of project management practices to improve craft productivity Proceedings, Annual Conference - Canadian Society For Civil Engineering. 1: 772-782.  0.317
2012 Shokri S, Maloney K, MacGillivray S, Haas CT, Haas RCG. Integrated interface management system and project schedule Gerontechnology. 11: 198. DOI: 10.4017/Gt.2012.11.02.457.00  0.363
2012 Shahi A, Haas CT, West JS. Automated construction activity assessment using workflow-based data fusion Gerontechnology. 11: 333. DOI: 10.4017/Gt.2012.11.02.317.00  0.308
2012 Alwasel A, Elrayes K, Abdel-Rahman E, Haas C. Reducing shoulder injuries among construction workers Gerontechnology. 11: 242. DOI: 10.4017/Gt.2012.11.02.241.00  0.325
2012 Shokri S, Haas CT. Risk Management for Design and Construction Construction Management and Economics. 30: 711-713. DOI: 10.1080/01446193.2012.690883  0.312
2012 Shahi A, Cardona JM, Haas CT, West JS, Caldwell GL. Activity-based data fusion for automated progress tracking of construction projects Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 838-847. DOI: 10.1061/9780784412329.085  0.327
2012 Shokri S, Safa M, Haas CT, Haas RCG, Maloney K, MacGillivray S. Interface management model for mega capital projects Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 447-456. DOI: 10.1061/9780784412329.045  0.301
2012 Cho YK, Wang C, Tang P, Haas CT. Target-focused local workspace modeling for construction automation applications Journal of Computing in Civil Engineering. 26: 661-670. DOI: 10.1061/(Asce)Cp.1943-5487.0000166  0.354
2012 Razavi SN, Haas CT. Reliability-based hybrid data fusion method for adaptive location estimation in construction Journal of Computing in Civil Engineering. 26: 1-10. DOI: 10.1061/(Asce)Cp.1943-5487.0000101  0.358
2012 Zhang D, Haas CT, Goodrum PM, Caldas CH, Granger R. Construction small-projects rework reduction for capital facilities Journal of Construction Engineering and Management. 138: 1377-1385. DOI: 10.1061/(Asce)Co.1943-7862.0000552  0.432
2012 Razavi SN, Duflos E, Haas C, Vanheeghe P. Dislocation detection in field environments Expert Systems With Applications. 39: 8505-8513. DOI: 10.1016/J.Eswa.2011.12.014  0.363
2012 Shahi A, Aryan A, West JS, Haas CT, Haas RCG. Deterioration of UWB positioning during construction Automation in Construction. 24: 72-80. DOI: 10.1016/J.Autcon.2012.02.009  0.428
2012 Turkan Y, Bosche F, Haas CT, Haas R. Automated progress tracking using 4D schedule and 3D sensing technologies Automation in Construction. 22: 414-421. DOI: 10.1016/J.Autcon.2011.10.003  0.389
2011 Rehan R, Knight MA, Haas CT, Unger AJ. Application of system dynamics for developing financially self-sustaining management policies for water and wastewater systems. Water Research. 45: 4737-50. PMID 21802109 DOI: 10.1016/J.Watres.2011.06.001  0.3
2011 Shan Y, Goodrum PM, Zhai D, Haas C, Caldas CH. The impact of management practices on mechanical construction productivity Construction Management and Economics. 29: 305-316. DOI: 10.1080/01446193.2010.538070  0.446
2011 Gouett MC, Haas CT, Goodrum PM, Caldas CH. Activity analysis for direct-work rate improvement in construction Journal of Construction Engineering and Management. 137: 1117-1124. DOI: 10.1061/(Asce)Co.1943-7862.0000375  0.459
2011 Young DA, Haas CT, Goodrum P, Caldas C. Improving construction supply network visibility by using automated materials locating and tracking technology Journal of Construction Engineering and Management. 137: 976-984. DOI: 10.1061/(Asce)Co.1943-7862.0000364  0.339
2011 Goodrum PM, Haas CT, Caldas C, Zhai D, Yeiser J, Homm D. Model to predict the impact of a technology on construction productivity Journal of Construction Engineering and Management. 137: 678-688. DOI: 10.1061/(Asce)Co.1943-7862.0000328  0.334
2011 Razavi SN, Haas CT. Using reference RFID tags for calibrating the estimated locations of construction materials Automation in Construction. 20: 677-685. DOI: 10.1016/J.Autcon.2010.12.009  0.338
2011 Pradhan A, Akinci B, Haas CT. Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring Automation in Construction. 20: 389-398. DOI: 10.1016/J.Autcon.2010.11.009  0.327
2011 Shokri S, Safa M, Haas CT, Haas RCG. A conceptual framework to improve information and process management in the execution of capital projects Proceedings, Annual Conference - Canadian Society For Civil Engineering. 3: 2409-2418.  0.339
2010 Nasir H, Haas CT, Young DA, Razavi SN, Caldas CH, Goodrum P. Erratum to An implementation model for automated construction materials tracking and locating (Can. J. Civ. Eng., (2010), 37, 4, 588-599) Canadian Journal of Civil Engineering. 37. DOI: 10.1139/L10-060  0.345
2010 Wang Y, Goodrum PM, Haas C, Glover R, Vazari S. Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data Construction Management and Economics. 28: 1269-1285. DOI: 10.1080/01446193.2010.524238  0.356
2010 Razavi SN, Haas CT. Multisensor data fusion for on-site materials tracking in construction Automation in Construction. 19: 1037-1046. DOI: 10.1016/J.Autcon.2010.07.017  0.398
2009 Wang Y, Goodrum PM, Haas CT, Glover RW. Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the u.s. industrial construction sector Journal of Construction Engineering and Management. 135: 999-1008. DOI: 10.1061/(Asce)Co.1943-7862.0000072  0.364
2009 Zhai D, Goodrum PM, Haas CT, Caldas CH. Relationship between automation and integration of construction information systems and labor productivity Journal of Construction Engineering and Management. 135: 746-753. DOI: 10.1061/(Asce)Co.1943-7862.0000024  0.448
2009 Bosche F, Haas CT, Akinci B. Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control Journal of Computing in Civil Engineering. 23: 311-318. DOI: 10.1061/(Asce)0887-3801(2009)23:6(311)  0.375
2009 Chong WK, Kumar S, Haas CT, Beheiry SMA, Coplen L, Oey M. Understanding and interpreting baseline perceptions of sustainability in construction among civil engineers in the United States Journal of Management in Engineering. 25: 143-154. DOI: 10.1061/(Asce)0742-597X(2009)25:3(143)  0.415
2009 Hwang BG, Thomas SR, Haas CT, Caldas CH. Measuring the impact of rework on construction cost performance Journal of Construction Engineering and Management. 135: 187-198. DOI: 10.1061/(Asce)0733-9364(2009)135:3(187)  0.404
2009 Grau D, Caldas CH, Haas CT, Goodrum PM, Gong J. Assessing the impact of materials tracking technologies on construction craft productivity Automation in Construction. 18: 903-911. DOI: 10.1016/J.Autcon.2009.04.001  0.394
2009 Grau D, Caldas CH, Haas CT, Goodrum PM, Gong J. Impact of fast automated tracking of construction components on labor productivity 2009 26th International Symposium On Automation and Robotics in Construction, Isarc 2009. 505-511.  0.332
2008 Baïz S, Tighe SL, Haas CT, Mills B, Perchanok M. Development of frost and thaw depth predictors for decision making about variable load restrictions Transportation Research Record. 1-8. DOI: 10.3141/2053-01  0.309
2008 Bosche F, Haas CT. Automated retrieval of 3D CAD model objects in construction range images Automation in Construction. 17: 499-512. DOI: 10.1016/J.Autcon.2007.09.001  0.393
2008 Bosche F, Haas CT, Murray P. Performance of automated project progress tracking with 3D data fusion Proceedings, Annual Conference - Canadian Society For Civil Engineering. 1: 349-358.  0.316
2007 Haas C, Waugh L, Froese T. History and renaissance of construction engineering and management in Canada Journal of Construction Engineering and Management. 133: 678-683. DOI: 10.1061/(Asce)0733-9364(2007)133:9(678)  0.346
2007 Teizer J, Caldas CH, Haas CT. Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources Journal of Construction Engineering and Management. 133: 880-888. DOI: 10.1061/(Asce)0733-9364(2007)133:11(880)  0.4
2007 Seo JW, Haas C, Saidi K. Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot Automation in Construction. 16: 96-106. DOI: 10.1016/J.Autcon.2005.12.002  0.607
2007 Song J, Haas CT, Caldas CH. A proximity-based method for locating RFID tagged objects Advanced Engineering Informatics. 21: 367-376. DOI: 10.1016/J.Aei.2006.09.002  0.431
2007 Caron F, Razavi SN, Song J, Vanheeghe P, Duflos E, Caldas C, Haas C. Locating sensor nodes on construction projects Autonomous Robots. 22: 255-263. DOI: 10.1007/S10514-006-9720-1  0.408
2006 White RP, Song J, Haas C, Middleton D. Evaluation of Quartz Piezoelectric Weigh-in-Motion Sensors Transportation Research Record. 1945: 109-117. DOI: 10.3141/1945-13  0.349
2006 Kim C, Haas CT, Liapi KA, Caldas CH. Human-assisted obstacle avoidance system using 3D workspace modeling for construction equipment operation Journal of Computing in Civil Engineering. 20: 177-186. DOI: 10.1061/(Asce)0887-3801(2006)20:3(177)  0.391
2006 Brandenburg SG, Haas CT, Byrom K. Strategic management of human resources in construction Journal of Management in Engineering. 22: 89-96. DOI: 10.1061/(Asce)0742-597X(2006)22:2(89)  0.743
2006 Song J, Haas CT, Caldas CH. Tracking the location of materials on construction job sites Journal of Construction Engineering and Management. 132: 911-918. DOI: 10.1061/(Asce)0733-9364(2006)132:9(911)  0.48
2006 Caldas CH, Torrent DG, Haas CT. Using global positioning system to improve materials-locating processes on industrial projects Journal of Construction Engineering and Management. 132: 741-749. DOI: 10.1061/(Asce)0733-9364(2006)132:7(741)  0.4
2006 Beheiry SMA, Chong WK, Haas CT. Examining the business impact of owner commitment to sustainability Journal of Construction Engineering and Management. 132: 384-392. DOI: 10.1061/(Asce)0733-9364(2006)132:4(384)  0.419
2006 Srour IM, Haas CT, Morton DP. Linear programming approach to optimize strategic investment in the construction workforce Journal of Construction Engineering and Management. 132: 1158-1166. DOI: 10.1061/(Asce)0733-9364(2006)132:11(1158)  0.707
2006 Srour IM, Haas CT, Borcherding JD. What does the construction industry value in its workers? Journal of Construction Engineering and Management. 132: 1053-1058. DOI: 10.1061/(Asce)0733-9364(2006)132:10(1053)  0.688
2006 Song J, Haas CT, Caldas C, Ergen E, Akinci B. Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects Automation in Construction. 15: 166-177. DOI: 10.1016/J.Autcon.2005.03.001  0.477
2005 Teizer J, Kim C, Haas CT, Liapi KA, Caldas CH. Framework for real-time three-dimensional modeling of infrastructure Transportation Research Record. 177-186. DOI: 10.3141/1913-17  0.352
2005 Caldas CH, Torrent DG, Haas CT. GPS technology for locating fabricated pipes on industrial projects Proceedings of the 2005 Asce International Conference On Computing in Civil Engineering. 1867-1874. DOI: 10.1061/40794(179)174  0.398
2005 Castañeda JA, Tucker RL, Haas CT. Workers' skills and receptiveness to operate under the Tier II construction management strategy Journal of Construction Engineering and Management. 131: 799-807. DOI: 10.1061/(Asce)0733-9364(2005)131:7(799)  0.439
2005 Song J, Fagerlund WR, Haas CT, Tatum CB, Vanegas JA. Considering prework on industrial projects Journal of Construction Engineering and Management. 131: 723-733. DOI: 10.1061/(Asce)0733-9364(2005)131:6(723)  0.499
2005 Kim C, Haas CT, Liapi KA. Rapid, on-site spatial information acquisition and its use for infrastructure operation and maintenance Automation in Construction. 14: 666-684. DOI: 10.1016/J.Autcon.2005.02.002  0.38
2004 McLaughlin J, Sreenivasan SV, Haas C, Liapi K. Rapid Human-Assisted Creation of Bounding Models for Obstacle Avoidance in Construction Computer-Aided Civil and Infrastructure Engineering. 19: 3-15. DOI: 10.1111/J.1467-8667.2004.00333.X  0.365
2004 Kim H, Rauch AF, Haas CT. Automated quality assessment of stone aggregates based on laser imaging and a neural network Journal of Computing in Civil Engineering. 18: 58-64. DOI: 10.1061/(Asce)0887-3801(2004)18:1(58)  0.379
2004 Cho YK, Haas CT, Sreenivasan SV, Liapi K. Position error modeling for automated construction manipulators Journal of Construction Engineering and Management. 130: 50-58. DOI: 10.1061/(Asce)0733-9364(2004)130:1(50)  0.327
2004 Goodrum PM, Haas CT. Long-term impact of equipment technology on labor productivity in the U.S. construction industry at the activity level Journal of Construction Engineering and Management. 130: 124-133. DOI: 10.1061/(Asce)0733-9364(2004)130:1(124)  0.317
2004 Kwon SW, Bosche F, Kim C, Haas CT, Liapi KA. Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds Automation in Construction. 13: 67-81. DOI: 10.1016/J.Autcon.2003.08.007  0.579
2003 Browne C, Rauch AF, Haas CT, Kim H. Performance Evaluation of Automated Machines for Measuring Gradation of Aggregates Geotechnical Testing Journal. 26: 373-381. DOI: 10.1520/Gtj11254J  0.358
2003 Kim H, Haas CT, Rauch AF, Browne C. 3D image segmentation of aggregates from laser profiling Computer-Aided Civil and Infrastructure Engineering. 18: 254-263. DOI: 10.1111/1467-8667.00315  0.348
2003 Cho YK, Haas CT. Rapid geometric modeling for unstructured construction workspaces Computer-Aided Civil and Infrastructure Engineering. 18: 242-253. DOI: 10.1111/1467-8667.00314  0.613
2003 Carley LA, Haas CT, Borcherding JD, Goodrum PM. Experiences with multiskilling among non-union craft workers in US industrial construction projects Engineering, Construction and Architectural Management. 10: 374-381. DOI: 10.1108/09699980310509345  0.366
2002 Kim H, Haas CT, Rauch AF, Browne C. Wavelet-based three-dimensional descriptors of aggregate particles Transportation Research Record. 109-116. DOI: 10.3141/1787-12  0.364
2002 Haas CT, Kim Y. Automation in infrastructure construction Construction Innovation: Information, Process, Management. 2: 191-209. DOI: 10.1108/14714170210814766  0.353
2002 Goodrum PM, Haas CT, Glover RW. The divergence in aggregate and activity estimates of US construction productivity Construction Management and Economics. 20: 415-423. DOI: 10.1080/01446190210145868  0.331
2002 Kim H, Haas CT, Rauch AF, Browne C. Dimensional ratios for stone aggregates from three-dimensional laser scans Journal of Computing in Civil Engineering. 16: 175-183. DOI: 10.1061/(Asce)0887-3801(2002)16:3(175)  0.365
2002 Goodrum PM, Haas CT. Partial factor productivity and equipment technology change at activity level in U.S. construction industry Journal of Construction Engineering and Management. 128: 463-472. DOI: 10.1061/(Asce)0733-9364(2002)128:6(463)  0.322
2002 Gomar JE, Haas CT, Morton DP. Assignment and allocation optimization of partially multiskilled workforce Journal of Construction Engineering and Management. 128: 103-109. DOI: 10.1061/(Asce)0733-9364(2002)128:2(103)  0.438
2002 Cho YK, Haas CT, Liapi K, Sreenivasan SV. A framework for rapid local area modeling for construction automation Automation in Construction. 11: 629-641. DOI: 10.1016/S0926-5805(02)00004-3  0.361
2000 Goodrum PM, Haas CT. Variables affecting innovations in the U.S. construction industry Proceedings of Construction Congress Vi: Building Together For a Better Tomorrow in An Increasingly Complex World. 278: 525-533. DOI: 10.1061/40475(278)57  0.335
2000 Seo J, Haas CT, Saidi K, Sreenivasan SV. Graphical control interface for construction and maintenance equipment Journal of Construction Engineering and Management. 126: 210-218. DOI: 10.1061/(Asce)0733-9364(2000)126:3(210)  0.624
2000 Allmon E, Haas CT, Borcherding JD, Goodrum PM. U.S. construction labor productivity trends, 1970-1998 Journal of Construction Engineering and Management. 126: 97-104. DOI: 10.1061/(Asce)0733-9364(2000)126:2(97)  0.393
2000 Kim YS, Haas CT. Model for automation of infrastructure maintenance using representational forms Automation in Construction. 10: 57-68. DOI: 10.1016/S0926-5805(99)00028-X  0.337
1999 Saidi KS, Seo J, Sreenivasan SV, Haas CT, Traver AE. Design of a tele-operated robot for the maintenance of boiler hoppers in electric power plants Journal of Mechanical Design, Transactions of the Asme. 121: 647-649. DOI: 10.1115/1.2829512  0.559
1999 Ueki M, Haas CT, Seo J. Decision tool for microtunneling method selection Journal of Construction Engineering and Management. 125: 123-131. DOI: 10.1061/(Asce)0733-9364(1999)125:2(123)  0.319
1998 Mckeever B, Haas C, Weissmann J, Greer R. Life cycle cost-benefit model for road weather information systems Transportation Research Record. 41-48. DOI: 10.3141/1627-07  0.335
1998 Kim Y, Haas CT, Greer R. Path planning for machine vision assisted, teleoperated pavement crack sealer Journal of Transportation Engineering-Asce. 124: 137-143. DOI: 10.1061/(Asce)0733-947X(1998)124:2(137)  0.313
1998 Burleson RC, Haas CT, Tucker RL, Stanley A. Multiskilled labor utilization strategies in construction Journal of Construction Engineering and Management. 124: 480-489. DOI: 10.1061/(Asce)0733-9364(1998)124:6(480)  0.45
1998 LeBlond D, Owen F, Gibson GE, Haas CT, Traver AE. Control improvement for advanced construction equipment Journal of Construction Engineering and Management. 124: 289-296. DOI: 10.1061/(Asce)0733-9364(1998)124:4(289)  0.351
1997 Gambatese JA, Hinze JW, Haas CT. Tool to design for construction worker safety Journal of Architectural Engineering. 3: 32-41. DOI: 10.1061/(Asce)1076-0431(1997)3:1(32)  0.378
1997 Greer R, Haas C, Gibson G, Traver A, Tucker RL. Advances in control systems for construction manipulators Automation in Construction. 6: 193-203. DOI: 10.1016/S0926-5805(97)00003-4  0.349
1996 Lin KL, Haas CT. Multiple heavy lifts optimization Journal of Construction Engineering and Management. 122: 354-362. DOI: 10.1061/(Asce)0733-9364(1996)122:4(354)  0.35
1996 Lin KL, Haas CT. An interactive planning environment for critical operations Journal of Construction Engineering and Management. 122: 212-230. DOI: 10.1061/(Asce)0733-9364(1996)122:3(212)  0.333
1996 Haas C. Evolution of an automated crack sealer: a study in construction technology development Automation in Construction. 4: 293-305. DOI: 10.1016/0926-5805(95)00010-0  0.312
1995 Haas C, Fowler D, Conegliano B, Wright C, Bauhan T. Evaluation of New Underground Infrastructure-Maintenance Technologies Journal of Infrastructure Systems. 1: 204-213. DOI: 10.1061/(Asce)1076-0342(1995)1:4(204)  0.318
1994 Tucker RL, O'Connor JT, Gatton TM, Gibson GE, Haas CT, Hudson DN. The Impact of Computer Technology on Construction's Future Computer‐Aided Civil and Infrastructure Engineering. 9: 3-11. DOI: 10.1111/J.1467-8667.1994.Tb00357.X  0.385
1994 Hsieh T, Haas C. Determining functional requirements for large scale manipulators Automation in Construction. 3: 55-64. DOI: 10.1016/0926-5805(94)90032-9  0.352
1993 Hornaday WC, Haas CT, O’Connor JT, Wen J. Computer-aided planning for heavy lifts Journal of Construction Engineering and Management. 119: 498-515. DOI: 10.1061/(Asce)0733-9364(1993)119:3(498)  0.351
1990 Phelan RS, Radjy F, Haas C, Hendrickson C. Computer-aided concrete-placement optimization Journal of Construction Engineering and Management. 116: 172-187. DOI: 10.1061/(Asce)0733-9364(1990)116:1(172)  0.324
Show low-probability matches.