Soon-Wook Kwon, Ph.D.
Affiliations: | 2003 | University of Texas at Austin, Austin, Texas, U.S.A. |
Area:
Civil EngineeringGoogle:
"Soon-Wook Kwon"Parents
Sign in to add mentorCarl T. Haas | grad student | 2003 | UT Austin | |
(Human-assisted fitting and matching of objects to sparse point clouds for rapid workspace modeling in construction automation.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Moon D, Chung S, Kwon S, et al. (2019) Comparison and utilization of point cloud generated from photogrammetry and laser scanning: 3D world model for smart heavy equipment planning Automation in Construction. 98: 322-331 |
Shin J, Kwon S, Moon D, et al. (2018) A Study on Method of Vertical Zoning of Construction Lift for High-rise Building based on Lift Planning & Operation History Database Ksce Journal of Civil Engineering. 22: 2664-2677 |
Lee D, Kim S, Park J, et al. (2017) Generation of 3D Terrain Map using Cell Deviation Algorithm for Earthwork Procedia Engineering. 196: 436-440 |
Lee K, Kwon S, Shin J, et al. (2017) A Prediction Method of Vertical Lifting Loads Based on Long-term Time Series Analysis for High-rise Building Construction Procedia Engineering. 196: 121-127 |
Kwon S, Park J, Moon D, et al. (2017) Smart Merging Method for Hybrid Point Cloud Data using UAV and LIDAR in Earthwork Construction Procedia Engineering. 196: 21-28 |
Lee M, Lee S, Kwon S, et al. (2017) A study on scan data matching for reverse engineering of pipes in plant construction Ksce Journal of Civil Engineering. 21: 2027-2036 |
Shin J, Kwon S, Lee K, et al. (2015) A Study of the Establishment of Framework for Information Exchange based on IFC Model in Domestic Collaborative Design Environment Korean Journal of Construction Engineering and Management. 16: 24-34 |
Chung S, Kwon S. (2014) Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project Korean Journal of Construction Engineering and Management. 15: 53-61 |
Kwon S, Lee G, Ahn D, et al. (2014) A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site Journal of Construction Engineering and Project Management. 4: 45-50 |
Shin J, Kwon S. (2013) Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building Korean Journal of Construction Engineering and Management. 14: 153-163 |