Year |
Citation |
Score |
2022 |
Chung IB, Caldas C. Applicability of Blockchain-Based Implementation for Risk Management in Healthcare Projects. Blockchain in Healthcare Today. 5. PMID 36779025 DOI: 10.30953/bhty.v5.191 |
0.354 |
|
2020 |
Politis SS, Zhang Z, Kouchaki S, Caldas CH. Framework for network-level pavement condition assessment using remote sensing data mining Journal of Applied Remote Sensing. 14: 24504. DOI: 10.1117/1.Jrs.14.024504 |
0.353 |
|
2020 |
Yin Z, Caldas C. Scaffolding in industrial construction projects: current practices, issues, and potential solutions The International Journal of Construction Management. 1-10. DOI: 10.1080/15623599.2020.1808562 |
0.407 |
|
2020 |
Hwang B, Krishnankutty P, Zhu L, Caldas CH, Shounak A, Mulva S. Improving labour productivity in process construction maintenance and shutdown/turnaround projects The International Journal of Construction Management. 20: 822-836. DOI: 10.1080/15623599.2018.1492664 |
0.464 |
|
2020 |
Sharma V, Caldas CH, Mulva SP. Identification and Prioritization of Factors Affecting the Overall Project Cost of Healthcare Facilities Journal of Construction Engineering and Management-Asce. 146: 4019106. DOI: 10.1061/(Asce)Co.1943-7862.0001692 |
0.443 |
|
2020 |
Shan M, Hwang B, Caldas CH, Yin Z, Oliveira DP. Towards cleaner and more productive maintenance in petrochemical facilities: Mechanization and an assessment method Journal of Cleaner Production. 259: 120864. DOI: 10.1016/J.Jclepro.2020.120864 |
0.322 |
|
2019 |
Krishnankutty P, Hwang B, Caldas CH, Muralidharan S, Oliveira DPd. Assessing the Implementation of Best Productivity Practices in Maintenance Activities, Shutdowns, and Turnarounds of Petrochemical Plants Sustainability. 11: 1239. DOI: 10.3390/Su11051239 |
0.432 |
|
2019 |
Al-Aubaidy NA, Caldas CH, Mulva SP. Assessment of underreporting factors on construction safety incidents in US construction projects The International Journal of Construction Management. 1-18. DOI: 10.1080/15623599.2019.1613211 |
0.385 |
|
2019 |
Sharma V, Caldas CH, Mulva SP. Development of metrics and an external benchmarking program for healthcare facilities The International Journal of Construction Management. 1-16. DOI: 10.1080/15623599.2019.1573490 |
0.417 |
|
2017 |
Caldas C, Gupta A. Critical factors impacting the performance of mega-projects Engineering, Construction and Architectural Management. 24: 920-934. DOI: 10.1108/Ecam-05-2016-0117 |
0.478 |
|
2016 |
Shan Y, Zhai D, Goodrum PM, Haas CT, Caldas CH. Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects Journal of Management in Engineering. 32. DOI: 10.1061/(Asce)Me.1943-5479.0000375 |
0.499 |
|
2016 |
Nasir H, Haas CT, Caldas CH, Goodrum PM. An integrated productivity-practices implementation index for planning the execution of infrastructure projects Journal of Infrastructure Systems. 22. DOI: 10.1061/(Asce)Is.1943-555X.0000275 |
0.483 |
|
2016 |
Suk SJ, Chi S, Mulva SP, Caldas CH, An SH. Quantifying combination effects of project management practices on cost performance Ksce Journal of Civil Engineering. 1-13. DOI: 10.1007/S12205-016-0499-0 |
0.489 |
|
2015 |
Caldas CH, Menches CL, Reyes PM, Navarro L, Vargas DM. Materials Management Practices in the Construction Industry Practice Periodical On Structural Design and Construction. 20. DOI: 10.1061/(Asce)Sc.1943-5576.0000238 |
0.465 |
|
2015 |
Caldas CH, Elkington RWT, O'Connor JT, Kim JY. Development of a method to retain experiential knowledge in capital projects organizations Journal of Management in Engineering. 31. DOI: 10.1061/(Asce)Me.1943-5479.0000322 |
0.393 |
|
2015 |
Caldas CH, Kim JY, Haas CT, Goodrum PM, Zhang D. Method to assess the level of implementation of productivity practices on industrial projects Journal of Construction Engineering and Management. 141. DOI: 10.1061/(Asce)Co.1943-7862.0000919 |
0.463 |
|
2014 |
Shan Y, Kim JY, Goodrum PM, Caldas CH, Haas C. Impact of steel quick connection system on steel erection labor productivity: Case studies and simulation based analyses Canadian Journal of Civil Engineering. 41: 1036-1045. DOI: 10.1139/Cjce-2014-0079 |
0.382 |
|
2014 |
Liu J, Shahi A, Haas CT, Goodrum P, Caldas CH. Validation methodologies and their impact in construction productivity research Journal of Construction Engineering and Management. 140. DOI: 10.1061/(Asce)Co.1943-7862.0000882 |
0.395 |
|
2013 |
Shan Y, Goodrum PM, Haas CT, Caldas CH, Zhai D. A comprehensive analysis of project management practices to improve craft productivity Proceedings, Annual Conference - Canadian Society For Civil Engineering. 1: 772-782. |
0.334 |
|
2012 |
Caldas CH, Zhang Z, Halabi RA, Kincaid E. Electronic Appraisal Methodology for Right-of-Way Acquisition in Highway Projects Journal of the Transportation Research Forum. 51: 19. DOI: 10.5399/Osu/Jtrf.51.1.2801 |
0.438 |
|
2012 |
Chanmeka A, Thomas SR, Caldas CH, Mulva SP. Assessing key factors impacting the performance and productivity of oil and gas projects in Alberta Canadian Journal of Civil Engineering. 39: 259-270. DOI: 10.1139/L11-128 |
0.714 |
|
2012 |
Dadi GB, Safa M, Goodrum PM, Haas CT, Caldas CH, MacNeel D. Improving concrete trade labor productivity through the use of innovations Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 2479-2488. DOI: 10.1061/9780784412329.249 |
0.348 |
|
2012 |
Zhang D, Haas CT, Goodrum PM, Caldas CH, Granger R. Construction small-projects rework reduction for capital facilities Journal of Construction Engineering and Management. 138: 1377-1385. DOI: 10.1061/(Asce)Co.1943-7862.0000552 |
0.459 |
|
2012 |
Suk S, Hwang B, Dai J, Caldas CH, Mulva SP. Performance Dashboard for a Pharmaceutical Project Benchmarking Program Journal of Construction Engineering and Management-Asce. 138: 864-876. DOI: 10.1061/(Asce)Co.1943-7862.0000503 |
0.499 |
|
2012 |
Chi S, Caldas CH. Image-based safety assessment: Automated spatial safety risk identification of earthmoving and surface mining activities Journal of Construction Engineering and Management. 138: 341-351. DOI: 10.1061/(Asce)Co.1943-7862.0000438 |
0.301 |
|
2012 |
Hwang BG, Thomas SR, Caldas CH. Application of customized industry-specific metrics to assessment of capital projects performances Ksce Journal of Civil Engineering. 16: 19-27. DOI: 10.1007/S12205-012-1352-8 |
0.727 |
|
2011 |
Caldas CH, Zhang Z, Kockelman KM, Persad KR, Halabi RA, Kincaid E. Development of Best Practices for Right-of-Way Valuations and Negotiations in Transportation Projects Journal of the Transportation Research Forum. 50. DOI: 10.5399/Osu/Jtrf.50.3.4115 |
0.43 |
|
2011 |
Chi S, Caldas CH. Automated Object Identification Using Optical Video Cameras on Construction Sites Computer-Aided Civil and Infrastructure Engineering. 26: 368-380. DOI: 10.1111/J.1467-8667.2010.00690.X |
0.367 |
|
2011 |
Gong J, Borcherding JD, Caldas CH. Effectiveness of craft time utilization in construction Construction Management and Economics. 29: 737-751. DOI: 10.1080/01446193.2011.595013 |
0.591 |
|
2011 |
Shan Y, Goodrum PM, Zhai D, Haas C, Caldas CH. The impact of management practices on mechanical construction productivity Construction Management and Economics. 29: 305-316. DOI: 10.1080/01446193.2010.538070 |
0.489 |
|
2011 |
Gouett MC, Haas CT, Goodrum PM, Caldas CH. Activity analysis for direct-work rate improvement in construction Journal of Construction Engineering and Management. 137: 1117-1124. DOI: 10.1061/(Asce)Co.1943-7862.0000375 |
0.496 |
|
2011 |
Young DA, Haas CT, Goodrum P, Caldas C. Improving construction supply network visibility by using automated materials locating and tracking technology Journal of Construction Engineering and Management. 137: 976-984. DOI: 10.1061/(Asce)Co.1943-7862.0000364 |
0.338 |
|
2011 |
Goodrum PM, Haas CT, Caldas C, Zhai D, Yeiser J, Homm D. Model to predict the impact of a technology on construction productivity Journal of Construction Engineering and Management. 137: 678-688. DOI: 10.1061/(Asce)Co.1943-7862.0000328 |
0.34 |
|
2011 |
Shahandashti SM, Razavi SN, Soibelman L, Berges M, Caldas CH, Brilakis I, Teizer J, Vela PA, Haas C, Garrett J, Akinci B, Zhu Z. Data-fusion approaches and applications for construction engineering Journal of Construction Engineering and Management. 137: 863-869. DOI: 10.1061/(Asce)Co.1943-7862.0000287 |
0.748 |
|
2011 |
Gong J, Siddiqui M, Caldas CH, O'Brien WJ. The special issue of 26th International Symposium on Automation and Robotics in Construction Automation in Construction. 20: 661. DOI: 10.1016/J.Autcon.2011.06.001 |
0.437 |
|
2011 |
Gong J, Caldas CH. An object recognition, tracking, and contextual reasoning-based video interpretation method for rapid productivity analysis of construction operations Automation in Construction. 20: 1211-1226. DOI: 10.1016/J.Autcon.2011.05.005 |
0.52 |
|
2011 |
Gong J, Caldas CH, Gordon C. Learning and classifying actions of construction workers and equipment using Bag-of-Video-Feature-Words and Bayesian network models Advanced Engineering Informatics. 25: 771-782. DOI: 10.1016/J.Aei.2011.06.002 |
0.516 |
|
2011 |
Safa M, Gouett MC, Haas CT, Goodrum PM, Caldas CH. Implementation of weld-less innovations on construction projects Proceedings, Annual Conference - Canadian Society For Civil Engineering. 3: 2070-2079. |
0.328 |
|
2010 |
Nasir H, Haas CT, Young DA, Razavi SN, Caldas CH, Goodrum P. Erratum to An implementation model for automated construction materials tracking and locating (Can. J. Civ. Eng., (2010), 37, 4, 588-599) Canadian Journal of Civil Engineering. 37. DOI: 10.1139/L10-060 |
0.315 |
|
2010 |
Gong J, Caldas CH. Computer vision-based video interpretation model for automated productivity analysis of construction operations Journal of Computing in Civil Engineering. 24: 252-263. DOI: 10.1061/(Asce)Cp.1943-5487.0000027 |
0.595 |
|
2010 |
Hwang BG, Thomas SR, Caldas CH. Performance metric development for pharmaceutical construction projects International Journal of Project Management. 28: 265-274. DOI: 10.1016/J.Ijproman.2009.06.004 |
0.742 |
|
2009 |
Jagars-Cohen CA, Menches CL, Jangid YK, Caldas CH. Priority-ranking workload reduction strategies to address challenges of transportation construction inspection Transportation Research Record. 13-17. DOI: 10.3141/2098-02 |
0.392 |
|
2009 |
Chi S, Caldas CH, Kim DY. A methodology for object identification and tracking in construction based on spatial modeling and image matching techniques Computer-Aided Civil and Infrastructure Engineering. 24: 199-211. DOI: 10.1111/J.1467-8667.2008.00580.X |
0.329 |
|
2009 |
Yun S, Caldas CH. Analysing decision variables that influence preliminary feasibility studies using data mining techniques Construction Management and Economics. 27: 73-87. DOI: 10.1080/01446190802596246 |
0.413 |
|
2009 |
Le T, Caldas CH, Gibson GE, Thole M. Assessing scope and managing risk in the highway project development process Journal of Construction Engineering and Management. 135: 900-910. DOI: 10.1061/(Asce)Co.1943-7862.0000052 |
0.717 |
|
2009 |
Zhai D, Goodrum PM, Haas CT, Caldas CH. Relationship between automation and integration of construction information systems and labor productivity Journal of Construction Engineering and Management. 135: 746-753. DOI: 10.1061/(Asce)Co.1943-7862.0000024 |
0.523 |
|
2009 |
Caldas CH, Gibson GE, Weerasooriya R, Yohe AM. Identification of effective management practices and technologies for lessons learned programs in the construction industry Journal of Construction Engineering and Management. 135: 531-539. DOI: 10.1061/(Asce)Co.1943-7862.0000011 |
0.375 |
|
2009 |
Torrent DG, Caldas CH. Methodology for automating the identification and localization of construction components on industrial projects Journal of Computing in Civil Engineering. 23: 3-13. DOI: 10.1061/(Asce)0887-3801(2009)23:1(3) |
0.461 |
|
2009 |
Chou CC, Caldas CH, O'Connor JT, Sroka AW, Goldman GK. Identification of decision drivers for the strategy of incorporating utility relocations into highway construction contracts Journal of Construction Engineering and Management. 135: 812-818. DOI: 10.1061/(Asce)0733-9364(2009)135:9(812) |
0.401 |
|
2009 |
Hwang BG, Thomas SR, Haas CT, Caldas CH. Measuring the impact of rework on construction cost performance Journal of Construction Engineering and Management. 135: 187-198. DOI: 10.1061/(Asce)0733-9364(2009)135:3(187) |
0.711 |
|
2009 |
Grau D, Caldas CH, Haas CT, Goodrum PM, Gong J. Assessing the impact of materials tracking technologies on construction craft productivity Automation in Construction. 18: 903-911. DOI: 10.1016/J.Autcon.2009.04.001 |
0.543 |
|
2009 |
Grau D, Caldas CH, Haas CT, Goodrum PM, Gong J. Impact of fast automated tracking of construction components on labor productivity 2009 26th International Symposium On Automation and Robotics in Construction, Isarc 2009. 505-511. |
0.355 |
|
2008 |
Caldas CH, Chou CC, O'connor J. Negotiation-based decision support model for utility relocations in transportation infrastructure projects Construction Management and Economics. 26: 1079-1090. DOI: 10.1080/01446190802331388 |
0.42 |
|
2008 |
Hwang BG, Thomas SR, Degezelle D, Caldas CH. Development of a benchmarking framework for pharmaceutical capital projects Construction Management and Economics. 26: 177-195. DOI: 10.1080/01446190701802398 |
0.725 |
|
2008 |
Gong J, Caldas CH. Data processing for real-time construction site spatial modeling Automation in Construction. 17: 526-535. DOI: 10.1016/J.Autcon.2007.09.002 |
0.499 |
|
2008 |
Soibelman L, Wu J, Caldas C, Brilakis I, Lin KY. Management and analysis of unstructured construction data types Advanced Engineering Informatics. 22: 15-27. DOI: 10.1016/J.Aei.2007.08.011 |
0.743 |
|
2007 |
Chou CC, Caldas CH, O'Connor JT. Decision support system for combined transportation and utility construction strategy Transportation Research Record. 9-16. DOI: 10.3141/1994-02 |
0.353 |
|
2007 |
Teizer J, Caldas CH, Haas CT. Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources Journal of Construction Engineering and Management. 133: 880-888. DOI: 10.1061/(Asce)0733-9364(2007)133:11(880) |
0.666 |
|
2007 |
Song J, Haas CT, Caldas CH. A proximity-based method for locating RFID tagged objects Advanced Engineering Informatics. 21: 367-376. DOI: 10.1016/J.Aei.2006.09.002 |
0.323 |
|
2006 |
Kim C, Haas CT, Liapi KA, Caldas CH. Human-assisted obstacle avoidance system using 3D workspace modeling for construction equipment operation Journal of Computing in Civil Engineering. 20: 177-186. DOI: 10.1061/(Asce)0887-3801(2006)20:3(177) |
0.349 |
|
2006 |
Costa DB, Formoso CT, Kagioglou M, Alarcón LF, Caldas CH. Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities Journal of Management in Engineering. 22: 158-167. DOI: 10.1061/(Asce)0742-597X(2006)22:4(158) |
0.378 |
|
2006 |
Song J, Haas CT, Caldas CH. Tracking the location of materials on construction job sites Journal of Construction Engineering and Management. 132: 911-918. DOI: 10.1061/(Asce)0733-9364(2006)132:9(911) |
0.404 |
|
2006 |
Caldas CH, Torrent DG, Haas CT. Using global positioning system to improve materials-locating processes on industrial projects Journal of Construction Engineering and Management. 132: 741-749. DOI: 10.1061/(Asce)0733-9364(2006)132:7(741) |
0.403 |
|
2006 |
Song J, Haas CT, Caldas C, Ergen E, Akinci B. Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects Automation in Construction. 15: 166-177. DOI: 10.1016/J.Autcon.2005.03.001 |
0.39 |
|
2005 |
Teizer J, Kim C, Haas CT, Liapi KA, Caldas CH. Framework for real-time three-dimensional modeling of infrastructure Transportation Research Record. 177-186. DOI: 10.3141/1913-17 |
0.638 |
|
2005 |
Caldas CH, Torrent DG, Haas CT. GPS technology for locating fabricated pipes on industrial projects Proceedings of the 2005 Asce International Conference On Computing in Civil Engineering. 1867-1874. DOI: 10.1061/40794(179)174 |
0.401 |
|
2005 |
Caldas CH, Soibelman L, Gasser L. Methodology for the integration of project documents in model-based information systems Journal of Computing in Civil Engineering. 19: 25-33. DOI: 10.1061/(Asce)0887-3801(2005)19:1(25) |
0.688 |
|
2003 |
Soibelman L, Liu LY, Kirby JG, East EW, Caldas CH, Lin KY. Design review checking system with corporate lessons learned Journal of Construction Engineering and Management. 129: 475-484. DOI: 10.1061/(Asce)0733-9364(2003)129:5(475) |
0.757 |
|
2003 |
Caldas CH, Soibelman L. Automating hierarchical document classification for construction management information systems Automation in Construction. 12: 395-406. DOI: 10.1016/S0926-5805(03)00004-9 |
0.667 |
|
2003 |
Caldas CH, Soibelman L. Integration of Construction Documents in IFC Project Models Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress. 847-854. |
0.652 |
|
2002 |
Caldas CH, Soibelman L, Han J. Automated classification of construction project documents Journal of Computing in Civil Engineering. 16: 234-243. DOI: 10.1061/(Asce)0887-3801(2002)16:4(234) |
0.697 |
|
2002 |
Caldas CH, Soibelman L. Implementing automated methods for document classification in construction management information systems Congress On Computing in Civil Engineering, Proceedings. 194-210. |
0.65 |
|
Show low-probability matches. |