Year |
Citation |
Score |
2020 |
Mintz Y, Aswani A, Kaminsky P, Flowers E, Fukuoka Y. Nonstationary Bandits with Habituation and Recovery Dynamics Operations Research. 68: 1493-1516. DOI: 10.1287/Opre.2019.1918 |
0.365 |
|
2020 |
Ding S, Kaminsky PM. Centralized and Decentralized Warehouse Logistics Collaboration Manufacturing & Service Operations Management. 22: 812-831. DOI: 10.1287/Msom.2019.0774 |
0.341 |
|
2020 |
Jabbari A, Tommelein ID, Kaminsky PM. Workload leveling based on work space zoning for takt planning Automation in Construction. 118: 103223. DOI: 10.1016/J.Autcon.2020.103223 |
0.314 |
|
2019 |
Aswani A, Kaminsky P, Mintz Y, Flowers E, Fukuoka Y. Behavioral Modeling in Weight Loss Interventions. European Journal of Operational Research. 272: 1058-1072. PMID 30778275 DOI: 10.1016/J.Ejor.2018.07.011 |
0.326 |
|
2019 |
Kaminsky P, Wang Y. Multi-period process flexibility with inventory Flexible Services and Manufacturing Journal. 31: 833-893. DOI: 10.1007/S10696-019-09342-X |
0.383 |
|
2018 |
Şen A, Atamtürk A, Kaminsky P. Technical Note—A Conic Integer Optimization Approach to the Constrained Assortment Problem Under the Mixed Multinomial Logit Model Operations Research. 66: 994-1003. DOI: 10.1287/Opre.2017.1703 |
0.394 |
|
2018 |
Kaminsky PM, Liu S. A two-step gradient estimation approach for setting supply chain operating parameters Computers & Operations Research. 92: 98-110. DOI: 10.1016/J.Cor.2017.12.001 |
0.381 |
|
2017 |
Ahn H, Jasin S, Kaminsky PM, Wang Y. Analysis of Deterministic Control and Its Improvements for an Inventory Problem with Multiproduct Batch Differentiation Operations Research. 66: 58-76. DOI: 10.1287/Opre.2017.1647 |
0.426 |
|
2016 |
Gümüş M, Kaminsky P, Mathur S. The impact of product substitution and retail capacity on the timing and depth of price promotions: theory and evidence International Journal of Production Research. 54: 2108-2135. DOI: 10.2139/Ssrn.1964325 |
0.609 |
|
2015 |
Kaminsky P, Wang Y. Analytical models for biopharmaceutical operations and supply chain management: a survey of research literature Pharmaceutical Bioprocessing. 3: 61-73. DOI: 10.4155/Pbp.14.57 |
0.307 |
|
2015 |
Hwang HC, Ahn HS, Kaminsky P. Algorithms for the two-stage production-capacitated lot-sizing problem Journal of Global Optimization. 1-23. DOI: 10.1007/S10898-015-0392-2 |
0.339 |
|
2014 |
Kaminsky P, Yuen M. Production capacity investment with data updates Iie Transactions. 46: 664-682. DOI: 10.1080/0740817X.2013.849838 |
0.643 |
|
2013 |
Hwang HC, Ahn HS, Kaminsky P. Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem Operations Research. 61: 469-482. DOI: 10.1287/Opre.1120.1141 |
0.472 |
|
2013 |
Bülbül K, Kaminsky P. A linear programming-based method for job shop scheduling Journal of Scheduling. 16: 161-183. DOI: 10.1007/S10951-012-0270-4 |
0.458 |
|
2011 |
Guo X, Kaminsky PM, Tomecek PI, Yuen M. Optimal spot market inventory strategies in the presence of cost and price risk Mathematical Methods of Operations Research. 73: 109-137. DOI: 10.1007/S00186-010-0336-Z |
0.456 |
|
2009 |
Ahn H, Gümüş M, Kaminsky P. Inventory, Discounts, and the Timing Effect Manufacturing & Service Operations Management. 11: 613-629. DOI: 10.1287/Msom.1080.0241 |
0.609 |
|
2009 |
Kaminsky P, Kaya O. Combined make-to-order/make-to-stock supply chains Iie Transactions (Institute of Industrial Engineers). 41: 103-119. DOI: 10.1080/07408170801975065 |
0.482 |
|
2008 |
Kaminsky P, Kaya O. Inventory positioning, scheduling and lead-time quotation in supply chains International Journal of Production Economics. 114: 276-293. DOI: 10.1016/J.Ijpe.2008.02.006 |
0.369 |
|
2008 |
Kaminsky P, Lee Z. Effective on-line algorithms for reliable due date quotation and large-scale scheduling Journal of Scheduling. 11: 187-204. DOI: 10.1007/S10951-008-0053-0 |
0.627 |
|
2008 |
Kaminsky P, Kaya O. Scheduling and due-date quotation in a make-to-order supply chain Naval Research Logistics. 55: 444-458. DOI: 10.1002/Nav.20297 |
0.49 |
|
2007 |
Ahn H, Gümüş M, Kaminsky P. Pricing and Manufacturing Decisions When Demand Is a Function of Prices in Multiple Periods Operations Research. 55: 1039-1057. DOI: 10.1287/Opre.1070.0411 |
0.607 |
|
2007 |
Bülbül K, Kaminsky P, Yano C. Preemption in single machine earliness/tardiness scheduling Journal of Scheduling. 10: 271-292. DOI: 10.1007/S10951-007-0028-6 |
0.421 |
|
2005 |
Ahn HS, Kaminsky P. Production and distribution policy in a two-stage stochastic push-pull supply chain Iie Transactions. 37: 609-621. DOI: 10.1080/07408170590948477 |
0.424 |
|
2004 |
Kaminsky P, Swaminathan JM. Effective heuristics for capacitated production planning with multiperiod production and demand with forecast band refinement Manufacturing and Service Operations Management. 6: 184-194. DOI: 10.1287/Msom.1030.0032 |
0.399 |
|
2004 |
Bülbül K, Kaminsky P, Yano C. Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs Naval Research Logistics. 51: 407-445. DOI: 10.1002/Nav.20000 |
0.498 |
|
2003 |
Kaminsky P, Simchi-Levi D. Production and distribution lot sizing in a two stage supply chain Iie Transactions. 35: 1065-1075. DOI: 10.1080/07408170304401 |
0.583 |
|
2003 |
Kaminsky P. The effectiveness of the longest delivery time rule for the flow shop delivery time problem Naval Research Logistics. 50: 257-272. DOI: 10.1002/Nav.10054 |
0.464 |
|
2001 |
Kaminsky P, Simchi-Levi D. The Asymptotic Optimality of the SPT Rule for the Flow Shop Mean Completion Time Problem Operations Research. 49: 293-304. DOI: 10.1287/Opre.49.2.293.13536 |
0.622 |
|
2001 |
Kaminsky P, Simchi-Levi D. Asymptotic analysis of an on-line algorithm for the single machine completion time problem with release dates Operations Research Letters. 29: 141-148. DOI: 10.1016/S0167-6377(01)00099-2 |
0.614 |
|
2000 |
Kaminsky P, Swaminathan JM. Utilizing Forecast Band Refinement for Capacitated Production Planning Manufacturing & Service Operations Management. 3: 68-81. DOI: 10.1287/Msom.3.1.68.9999 |
0.455 |
|
1998 |
Kaminsky P, Simchi-Levi D. Probabilistic Analysis and Practical Algorithms for the Flow Shop Weighted Completion Time Problem Operations Research. 46: 872-882. DOI: 10.1287/Opre.46.6.872 |
0.636 |
|
Show low-probability matches. |