Barrett W. Thomas - Publications

Affiliations: 
Business Administration University of Iowa, Iowa City, IA 
Area:
Management Business Administration, Industrial Engineering, Computer Science

44 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Ulmer MW, Thomas BW, Campbell AM, Woyak N. The Restaurant Meal Delivery Problem: Dynamic Pickup and Delivery with Deadlines and Random Ready Times Transportation Science. DOI: 10.1287/Trsc.2020.1000  0.372
2020 Song Y, Ulmer MW, Thomas BW, Wallace SW. Building Trust in Home Services—Stochastic Team-Orienteering with Consistency Constraints Transportation Science. 54: 823-838. DOI: 10.1287/Trsc.2019.0927  0.391
2020 Ulmer MW, Goodson JC, Mattfeld DC, Thomas BW. On modeling stochastic dynamic vehicle routing problems Euro Journal On Transportation and Logistics. 9: 100008. DOI: 10.1016/J.Ejtl.2020.100008  0.436
2020 Zhang S, Ohlmann JW, Thomas BW. Multi-period orienteering with uncertain adoption likelihood and waiting at customers European Journal of Operational Research. 282: 288-303. DOI: 10.1016/J.Ejor.2019.09.023  0.488
2020 Ulmer MW, Thomas BW. Meso-parametric value function approximation for dynamic customer acceptances in delivery routing European Journal of Operational Research. 285: 183-195. DOI: 10.1016/J.Ejor.2019.04.029  0.433
2019 Ulmer MW, Thomas BW, Mattfeld DC. Preemptive depot returns for dynamic same-day delivery Euro Journal On Transportation and Logistics. 8: 327-361. DOI: 10.1007/S13676-018-0124-0  0.39
2019 Jin H, Thomas BW. Team orienteering with uncertain rewards and service times with an application to phlebotomist intrahospital routing Networks. 73: 453-465. DOI: 10.1002/Net.21875  0.352
2019 Thomas BW, Calogiuri T, Hewitt M. An exact bidirectional A⋆ approach for solving resource‐constrained shortest path problems Networks. 73: 187-205. DOI: 10.1002/Net.21856  0.381
2018 Zhang S, Ohlmann JW, Thomas BW. Dynamic Orienteering on a Network of Queues Transportation Science. 52: 691-706. DOI: 10.1287/Trsc.2017.0761  0.458
2018 Ehmke JF, Campbell AM, Thomas BW. Optimizing for total costs in vehicle routing in urban areas Transportation Research Part E-Logistics and Transportation Review. 116: 242-265. DOI: 10.1016/J.Tre.2018.06.008  0.355
2018 Chen X, Hewitt M, Thomas BW. An approximate dynamic programming method for the multi-period technician scheduling problem with experience-based service times and stochastic customers International Journal of Production Economics. 196: 122-134. DOI: 10.1016/J.Ijpe.2017.10.028  0.394
2017 Voccia SA, Campbell AM, Thomas BW. The Same-Day Delivery Problem for Online Purchases Transportation Science. 53: 167-184. DOI: 10.1287/Trsc.2016.0732  0.408
2017 Lamsal K, Jones PC, Thomas BW. Sugarcane Harvest Logistics in Brazil Transportation Science. 51: 771-789. DOI: 10.1287/Trsc.2015.0650  0.716
2017 Valeva S, Hewitt M, Thomas BW, Brown KG. Balancing flexibility and inventory in workforce planning with learning International Journal of Production Economics. 183: 194-207. DOI: 10.1016/J.Ijpe.2016.10.026  0.393
2017 Goodson JC, Thomas BW, Ohlmann JW. A rollout algorithm framework for heuristic solutions to finite-horizon stochastic dynamic programs European Journal of Operational Research. 258: 216-229. DOI: 10.1016/J.Ejor.2016.09.040  0.404
2017 Chen X, Thomas BW, Hewitt M. Multi-period technician scheduling with experience-based service times and stochastic customers Computers & Operations Research. 82: 1-14. DOI: 10.1016/J.Cor.2016.12.026  0.485
2016 Goodson JC, Thomas BW, Ohlmann JW. Restocking-based rollout policies for the vehicle routing problem with stochastic demand and duration limits Transportation Science. 50: 591-607. DOI: 10.1287/Trsc.2015.0591  0.425
2016 Lamsal K, Jones PC, Thomas BW. Continuous time scheduling for sugarcane harvest logistics in Louisiana International Journal of Production Research. 54: 616-627. DOI: 10.1080/00207543.2015.1052156  0.707
2016 Chen X, Thomas BW, Hewitt M. The technician routing problem with experience-based service times Omega (United Kingdom). 61: 49-61. DOI: 10.1016/J.Omega.2015.07.006  0.453
2016 Ehmke JF, Campbell AM, Thomas BW. Data-driven approaches for emissions-minimized paths in urban areas Computers and Operations Research. 67: 34-47. DOI: 10.1016/J.Cor.2015.08.013  0.37
2016 Jin H, Thomas BW, Hewit M. Integer programming techniques for makespan minimizing workforce assignment models that recognize human learning Computers and Industrial Engineering. 97: 202-211. DOI: 10.1016/J.Cie.2016.03.027  0.454
2016 Lamsal K, Jones PC, Thomas BW. Harvest logistics in agricultural systems with multiple, independent producers and no on-farm storage Computers and Industrial Engineering. 91: 129-138. DOI: 10.1016/J.Cie.2015.10.018  0.691
2015 Ehmke JF, Campbell AM, Thomas BW. Vehicle routing to minimize time-dependent emissions in urban areas European Journal of Operational Research. DOI: 10.1016/J.Ejor.2015.11.034  0.392
2015 Hewitt M, Chacosky A, Grasman SE, Thomas BW. Integer programming techniques for solving non-linear workforce planning models with learning European Journal of Operational Research. 242: 942-950. DOI: 10.1016/J.Ejor.2014.10.060  0.385
2014 Zhang S, Ohlmann JW, Thomas BW. A priori orienteering with time windows and stochastic wait times at customers European Journal of Operational Research. 239: 70-79. DOI: 10.1016/J.Ejor.2014.04.040  0.508
2014 Thomas BW, Manni E. Scheduled penalty Variable Neighborhood Search Computers and Operations Research. 52: 170-180. DOI: 10.1016/J.Cor.2013.12.004  0.443
2013 Grasman SE, Thomas BW. Scrambled experts: Team handicaps and win probabilities for golf scrambles Journal of Quantitative Analysis in Sports. 9: 217-227. DOI: 10.1515/Jqas-2012-0024  0.325
2013 Goodson JC, Ohlmann JW, Thomas BW. Rollout policies for dynamic solutions to the multivehicle routing problem with stochastic demand and duration limits Operations Research. 61: 138-154. DOI: 10.1287/Opre.1120.1127  0.398
2013 López-Ibáñez M, Blum C, Ohlmann JW, Thomas BW. The travelling salesman problem with time windows: Adapting algorithms from travel-time to makespan optimization Applied Soft Computing Journal. 13: 3806-3815. DOI: 10.1016/J.Asoc.2013.05.009  0.458
2013 Voccia SA, Campbell AM, Thomas BW. The probabilistic traveling salesman problem with time windows Euro Journal On Transportation and Logistics. 2: 89-107. DOI: 10.1007/S13676-013-0018-0  0.503
2012 Ghiani G, Manni E, Thomas BW. A comparison of anticipatory algorithms for the dynamic and stochastic traveling salesman problem Transportation Science. 46: 374-387. DOI: 10.1287/Trsc.1110.0374  0.427
2012 Goodson JC, Ohlmann JW, Thomas BW. Cyclic-order neighborhoods with application to the vehicle routing problem with stochastic demand European Journal of Operational Research. 217: 312-323. DOI: 10.1016/J.Ejor.2011.09.023  0.445
2012 Chen H, Campbell AM, Thomas BW. Network design for time-constrained delivery using subgraphs Computational Management Science. 9: 531-542. DOI: 10.1007/S10287-012-0154-2  0.405
2011 Campbell AM, Gendreau M, Thomas BW. The orienteering problem with stochastic travel and service times Annals of Operations Research. 186: 61-81. DOI: 10.1007/S10479-011-0895-2  0.486
2009 Sim T, Lowe TJ, Thomas BW. The stochastic p-hub center problem with service-level constraints Computers and Operations Research. 36: 3166-3177. DOI: 10.1016/J.Cor.2008.11.020  0.686
2009 Campbell AM, Thomas BW. Runtime reduction techniques for the probabilistic traveling salesman problem with deadlines Computers and Operations Research. 36: 1231-1248. DOI: 10.1016/J.Cor.2008.01.006  0.428
2009 Chen H, Campbell A, Thomas B, Tamir A. Minimax flow tree problems Networks. 54: 117-129. DOI: 10.1002/Net.V54:3  0.381
2008 Ohlmann JW, Fry MJ, Thomas BW. Route Design for Lean Production Systems Transportation Science. 42: 352-370. DOI: 10.1287/Trsc.1070.0222  0.46
2008 Campbell AM, Thomas BW. Probabilistic traveling salesman problem with deadlines Transportation Science. 42: 1-21. DOI: 10.1287/Trsc.1070.0203  0.513
2008 Chen H, Campbell AM, Thomas BW. Network design for time-constrained delivery Naval Research Logistics. 55: 493-515. DOI: 10.1002/Nav.20302  0.415
2007 Thomas BW. Waiting strategies for anticipating service requests from known customer locations Transportation Science. 41: 319-331. DOI: 10.1287/Trsc.1060.0183  0.475
2007 Ohlmann JW, Thomas BW. A Compressed-Annealing Heuristic for the Traveling Salesman Problem with Time Windows Informs Journal On Computing. 19: 80-90. DOI: 10.1287/Ijoc.1050.0145  0.405
2007 Thomas BW, White CC. The dynamic shortest path problem with anticipation European Journal of Operational Research. 176: 836-854. DOI: 10.1016/J.Ejor.2005.09.019  0.422
2004 Thomas BW, White CC. Anticipatory route selection Transportation Science. 38: 473-487. DOI: 10.1287/Trsc.1030.0071  0.438
Show low-probability matches.