Carl T. Haas - Publications

Affiliations: 
University of Texas at Austin, Austin, Texas, U.S.A. 
Area:
Civil Engineering, Industrial Engineering, Labor Economics

149 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2016 Safa M, Shahi A, Haas CT, Hipel KW. Construction contract management using value packaging systems International Journal of Construction Management. 1-15. DOI: 10.1080/15623599.2016.1167369  1
2016 Ryu J, Seo J, Liu M, Lee S, Haas CT. Action Recognition Using a Wristband-Type Activity Tracker: Case Study of Masonry Work Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, Crc 2016. 790-799. DOI: 10.1061/9780784479827.080  1
2016 Shahtaheri M, Haas CT, Salimi T. A Stochastic Simulation Approach for the Integration of Risk and Uncertainty into Megaproject Cost and Schedule Estimates Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, Crc 2016. 607-615. DOI: 10.1061/9780784479827.062  1
2016 Shan Y, Zhai D, Goodrum PM, Haas CT, Caldas CH. Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects Journal of Management in Engineering. 32. DOI: 10.1061/(ASCE)ME.1943-5479.0000375  0.52
2016 Nasir H, Haas CT, Caldas CH, Goodrum PM. An integrated productivity-practices implementation index for planning the execution of infrastructure projects Journal of Infrastructure Systems. 22. DOI: 10.1061/(ASCE)IS.1943-555X.0000275  1
2016 Nahangi M, Czerniawski T, Haas CT, Walbridge S, West J. Parallel systems and structural frames realignment planning and actuation strategy Journal of Computing in Civil Engineering. 30. DOI: 10.1061/(ASCE)CP.1943-5487.0000545  1
2016 Antony Chettupuzha AJ, Haas CT. Algorithm for Determining the Criticality of Documents within a Construction Information System Journal of Computing in Civil Engineering. 30. DOI: 10.1061/(ASCE)CP.1943-5487.0000515  1
2016 Nahangi M, Haas CT, West J, Walbridge S. Automatic Realignment of Defective Assemblies Using an Inverse Kinematics Analogy Journal of Computing in Civil Engineering. 30. DOI: 10.1061/(ASCE)CP.1943-5487.0000477  1
2016 Shokri S, Ahn S, Lee S, Haas CT, Haas RCG. Current status of interface management in construction: Drivers and effects of systematic interface management Journal of Construction Engineering and Management. 142. DOI: 10.1061/(ASCE)CO.1943-7862.0001035  1
2016 Shokri S, Haas CT, Haas RCG, Lee SH. Interface-management process for managing risks in complex capital projects Journal of Construction Engineering and Management. 142. DOI: 10.1061/(ASCE)CO.1943-7862.0000990  1
2016 Golzarpoor B, Haas CT, Rayside D. Improving process conformance with Industry Foundation Processes (IFP) Advanced Engineering Informatics. 30: 143-156. DOI: 10.1016/j.aei.2016.02.005  1
2015 Shahi A, Safa M, Haas CT, West JS. Data Fusion Process Management for Automated Construction Progress Estimation Journal of Computing in Civil Engineering. 29. DOI: 10.1061/(ASCE)CP.1943-5487.0000436  1
2015 Shadpour A, Unger AJA, Knight MA, Haas CT. Numerical DAE approach for solving a system dynamics problem Journal of Computing in Civil Engineering. 29. DOI: 10.1061/(ASCE)CP.1943-5487.0000349  1
2015 Caldas CH, Kim JY, Haas CT, Goodrum PM, Zhang D. Method to assess the level of implementation of productivity practices on industrial projects Journal of Construction Engineering and Management. 141. DOI: 10.1061/(ASCE)CO.1943-7862.0000919  1
2015 Nahangi M, Yeung J, Haas CT, Walbridge S, West J. Automated assembly discrepancy feedback using 3D imaging and forward kinematics Automation in Construction. 56: 36-46. DOI: 10.1016/j.autcon.2015.04.005  1
2015 Safa M, Shahi A, Haas CT, Fiander-McCann D, Hipel K, MacGillivray S. Competitive intelligence (CI) for evaluation of construction contractors Automation in Construction. 59: 149-157. DOI: 10.1016/j.autcon.2015.02.009  1
2015 Nahangi M, Haas CT. Automated 3D compliance checking in pipe spool fabrication Advanced Engineering Informatics. 28: 360-369. DOI: 10.1016/j.aei.2014.04.001  1
2015 Nahangi M, Chaudhary L, Yeung J, Haas CT, Walbridge S. Skeleton-based registration of 3D laser scans for automated quality assurance of industrial facilities Congress On Computing in Civil Engineering, Proceedings. 2015: 33-40.  1
2014 Alwasel AA, Abdel-Rahman EM, Haas CT. A technique to detect fatigue in the lower limbs Proceedings of the Asme Design Engineering Technical Conference. 8. DOI: 10.1115/DETC2014-35484  1
2014 Turkan Y, Bosché F, Haas CT, Haas R. Tracking of secondary and temporary objects in structural concrete work Construction Innovation. 14: 145-167. DOI: 10.1108/CI-12-2012-0063  1
2014 Nahangi M, Yeung J, Amaral J, Freitas FN, Walbridge S, Haas CT. Automated deviation analysis for as-built status assessment of steel assemblies and pipe spools Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference On Computing in Civil and Building Engineering. 2063-2070. DOI: 10.1061/9780784413616.256  1
2014 Shokri S, Ahn S, Czerniawski T, Haas CT, Lee SH. Current state of interface management in mega-construction projects Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. 2266-2275. DOI: 10.1061/9780784413517.0230  1
2014 Nahangi M, Safa M, Shahi A, Haas CT. Automated registration of 3D point clouds with 3D cad models for remote assessment of staged fabrication Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. 1004-1013. DOI: 10.1061/9780784413517.0103  1
2014 Bosché F, Guillemet A, Turkan Y, Haas CT, Haas R. Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system Journal of Computing in Civil Engineering. 28. DOI: 10.1061/(ASCE)CP.1943-5487.0000343  1
2014 Ahmed MF, Haas CT, Haas R. Automatic detection of cylindrical objects in built facilities Journal of Computing in Civil Engineering. 28. DOI: 10.1061/(ASCE)CP.1943-5487.0000329  1
2014 Shahi A, Haas CT, West JS, Akinci B. Workflow-based construction research data management and dissemination Journal of Computing in Civil Engineering. 28: 244-252. DOI: 10.1061/(ASCE)CP.1943-5487.0000251  1
2014 Shahtaheri M, Nasir H, Haas CT. Setting baseline rates for on-site work categories in the construction industry Journal of Construction Engineering and Management. 141. DOI: 10.1061/(ASCE)CO.1943-7862.0000959  1
2014 Liu J, Shahi A, Haas CT, Goodrum P, Caldas CH. Validation methodologies and their impact in construction productivity research Journal of Construction Engineering and Management. 140. DOI: 10.1061/(ASCE)CO.1943-7862.0000882  1
2014 Rehan R, Unger AJA, Knight MA, Haas CT. Financially sustainable management strategies for urban wastewater collection infrastructure - Implementation of a system dynamics model Tunnelling and Underground Space Technology. 39: 102-115. DOI: 10.1016/j.tust.2012.12.004  1
2014 Rehan R, Knight MA, Unger AJA, Haas CT. Financially sustainable management strategies for urban wastewater collection infrastructure - development of a system dynamics model Tunnelling and Underground Space Technology. 39: 116-129. DOI: 10.1016/j.tust.2012.12.003  1
2014 Safa M, Shahi A, Haas CT, Hipel KW. Supplier selection process in an integrated construction materials management model Automation in Construction. 48: 64-73. DOI: 10.1016/j.autcon.2014.08.008  1
2014 Bosché F, Ahmed M, Turkan Y, Haas CT, Haas R. The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components Automation in Construction. DOI: 10.1016/j.autcon.2014.05.014  1
2014 Yeung J, Nahangi M, Walbridge S, Haas CT. A preliminary investigation into automated identification of structural steel without a priori knowledge 31st International Symposium On Automation and Robotics in Construction and Mining, Isarc 2014 - Proceedings. 847-853.  1
2014 Safa M, Shahi A, Haas CT, Hipel K, MacGillivray S, Fiander-McCann D. A model for construction contractor selection using competitive intelligence (CI) 31st International Symposium On Automation and Robotics in Construction and Mining, Isarc 2014 - Proceedings. 329-336.  1
2013 Rehan R, Knight MA, Unger AJ, Haas CT. Development of a system dynamics model for financially sustainable management of municipal watermain networks. Water Research. 47: 7184-205. PMID 24238258 DOI: 10.1016/j.watres.2013.09.061  1
2013 Hashemi Vaziri S, Haas CT, Rothenburg L, Haas RC, Jiang X. Investigation of the effects of air temperature and speed on performance of piezoelectric weigh-in-motion systems Canadian Journal of Civil Engineering. 40: 935-944. DOI: 10.1139/cjce-2012-0227  1
2013 Vaziri SH, Haas CT, Rothenburg L, Haas RC. Investigation of the effect of weight factor on performance of piezoelectric weigh-in-motion sensors Journal of Transportation Engineering. 139: 913-922. DOI: 10.1061/(ASCE)TE.1943-5436.0000561  1
2013 Turkan Y, Bosché F, Haas CT, Haas R. Toward automated earned value tracking using 3D imaging tools Journal of Construction Engineering and Management. 139: 423-433. DOI: 10.1061/(ASCE)CO.1943-7862.0000629  1
2013 Shahi A, West JS, Haas CT. Onsite 3D marking for construction activity tracking Automation in Construction. 30: 136-143. DOI: 10.1016/j.autcon.2012.11.027  1
2013 Ahmed M, Haas CT, Haas R. Autonomous modeling of pipes within point clouds Isarc 2013 - 30th International Symposium On Automation and Robotics in Construction and Mining, Held in Conjunction With the 23rd World Mining Congress. 1093-1100.  1
2013 Karimidorabati S, Haas CT, Gray J. A model for implementing & continuously improving the automated change management process for construction mega projects Isarc 2013 - 30th International Symposium On Automation and Robotics in Construction and Mining, Held in Conjunction With the 23rd World Mining Congress. 643-652.  1
2013 Antony Chettupuzha AJ, Haas CT, Gray J. A conceptual approach to discovering knowledge from construction workflows Isarc 2013 - 30th International Symposium On Automation and Robotics in Construction and Mining, Held in Conjunction With the 23rd World Mining Congress. 972-978.  1
2013 Shokri S, Haas CT, Haas RCG, Maloney K, MacGillivray S. How to identify the critical stakeholders in an interface management system? Isarc 2013 - 30th International Symposium On Automation and Robotics in Construction and Mining, Held in Conjunction With the 23rd World Mining Congress. 945-954.  1
2013 Turkan Y, Bosché F, Haas CT, Haas R. Tracking secondary and temporary concrete construction objects using 3D imaging technologies Computing in Civil Engineering - Proceedings of the 2013 Asce International Workshop On Computing in Civil Engineering. 749-756.  1
2013 Safa M, Nahangi M, Shahi A, Haas CT. An integrated quality management system for piping fabrication using 3D laser scanning and photogrammetry Isarc 2013 - 30th International Symposium On Automation and Robotics in Construction and Mining, Held in Conjunction With the 23rd World Mining Congress. 669-676.  1
2013 Antony Chettupuzha AJ, Haas CT, Gray J, Simonson R. Determining critical construction documents through knowledge discovery Isarc 2013 - 30th International Symposium On Automation and Robotics in Construction and Mining, Held in Conjunction With the 23rd World Mining Congress. 979-986.  1
2013 Safa M, Reinsma S, Haas CT, Goodrum PM, Caldas CH. A method for choosing concrete forming systems Proceedings, Annual Conference - Canadian Society For Civil Engineering. 2: 1010-1019.  1
2013 Shan Y, Goodrum PM, Haas CT, Caldas CH, Zhai D. A comprehensive analysis of project management practices to improve craft productivity Proceedings, Annual Conference - Canadian Society For Civil Engineering. 1: 772-782.  1
2013 Safa M, Shokri S, Shahi A, Gray J, Haas CT, Haas R, Hipel KW. Front end planning tool Proceedings, Annual Conference - Canadian Society For Civil Engineering. 2: 1000-1009.  1
2013 Bosché F, Turkan Y, Haas CT, Chiamone T, Vassena G, Ciribini A. Tracking MEP installation works Isarc 2013 - 30th International Symposium On Automation and Robotics in Construction and Mining, Held in Conjunction With the 23rd World Mining Congress. 229-239.  1
2012 Ahmed M, Haas CT, Haas R. Using digital photogrammetry for pipe-works progress tracking Canadian Journal of Civil Engineering. 39: 1062-1071. DOI: 10.1139/L2012-055  1
2012 Nasir H, Haas CT, Rankin JH, Fayek AR, Forgues D, Ruwanpura J. Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement Canadian Journal of Civil Engineering. 39: 957-967. DOI: 10.1139/L2012-030  1
2012 Dadi GB, Safa M, Goodrum PM, Haas CT, Caldas CH, MacNeel D. Improving concrete trade labor productivity through the use of innovations Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 2479-2488. DOI: 10.1061/9780784412329.249  1
2012 Shahi A, Cardona JM, Haas CT, West JS, Caldwell GL. Activity-based data fusion for automated progress tracking of construction projects Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 838-847. DOI: 10.1061/9780784412329.085  1
2012 Shahi A, Carlson K, Chettupuzha AJA, Haas CT, West JS, Akinci B. Construction research data management Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 678-687. DOI: 10.1061/9780784412329.069  1
2012 Shokri S, Safa M, Haas CT, Haas RCG, Maloney K, MacGillivray S. Interface management model for mega capital projects Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 447-456. DOI: 10.1061/9780784412329.045  1
2012 Cho YK, Wang C, Tang P, Haas CT. Target-focused local workspace modeling for construction automation applications Journal of Computing in Civil Engineering. 26: 661-670. DOI: 10.1061/(ASCE)CP.1943-5487.0000166  1
2012 Razavi SN, Haas CT. Reliability-based hybrid data fusion method for adaptive location estimation in construction Journal of Computing in Civil Engineering. 26: 1-10. DOI: 10.1061/(ASCE)CP.1943-5487.0000101  1
2012 Zhang D, Haas CT, Goodrum PM, Caldas CH, Granger R. Construction small-projects rework reduction for capital facilities Journal of Construction Engineering and Management. 138: 1377-1385. DOI: 10.1061/(ASCE)CO.1943-7862.0000552  1
2012 Shahi A, Aryan A, West JS, Haas CT, Haas RCG. Deterioration of UWB positioning during construction Automation in Construction. 24: 72-80. DOI: 10.1016/j.autcon.2012.02.009  1
2012 Turkan Y, Bosche F, Haas CT, Haas R. Automated progress tracking using 4D schedule and 3D sensing technologies Automation in Construction. 22: 414-421. DOI: 10.1016/j.autcon.2011.10.003  1
2011 Rehan R, Knight MA, Haas CT, Unger AJ. Application of system dynamics for developing financially self-sustaining management policies for water and wastewater systems. Water Research. 45: 4737-50. PMID 21802109 DOI: 10.1016/j.watres.2011.06.001  1
2011 Ahmed M, Haas CT, Haas R. Toward low-cost 3D automatic pavement distress surveying: The close range photogrammetry approach Canadian Journal of Civil Engineering. 38: 1301-1313. DOI: 10.1139/L11-088  1
2011 Gouett MC, Haas CT, Goodrum PM, Caldas CH. Activity analysis for direct-work rate improvement in construction Journal of Construction Engineering and Management. 137: 1117-1124. DOI: 10.1061/(ASCE)CO.1943-7862.0000375  1
2011 Young DA, Haas CT, Goodrum P, Caldas C. Improving construction supply network visibility by using automated materials locating and tracking technology Journal of Construction Engineering and Management. 137: 976-984. DOI: 10.1061/(ASCE)CO.1943-7862.0000364  1
2011 Goodrum PM, Haas CT, Caldas C, Zhai D, Yeiser J, Homm D. Model to predict the impact of a technology on construction productivity Journal of Construction Engineering and Management. 137: 678-688. DOI: 10.1061/(ASCE)CO.1943-7862.0000328  1
2011 Razavi SN, Haas CT. Using reference RFID tags for calibrating the estimated locations of construction materials Automation in Construction. 20: 677-685. DOI: 10.1016/j.autcon.2010.12.009  1
2011 Pradhan A, Akinci B, Haas CT. Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring Automation in Construction. 20: 389-398. DOI: 10.1016/j.autcon.2010.11.009  1
2011 Shokri S, Safa M, Haas CT, Haas RCG. A conceptual framework to improve information and process management in the execution of capital projects Proceedings, Annual Conference - Canadian Society For Civil Engineering. 3: 2409-2418.  1
2011 Turkan Y, Bosche F, Haas CT, Haas R. Automated progress tracking of erection of concrete structures Proceedings, Annual Conference - Canadian Society For Civil Engineering. 4: 2746-2756.  1
2011 Aryan A, Shahi A, West JS, Haas CT, Haas RCG, Caldwell G. Evaluation of ultra-wideband technology for position location and progress tracking in indoor construction environments Proceedings, Annual Conference - Canadian Society For Civil Engineering. 3: 2474-2484.  1
2011 Ahmed M, Guillemet A, Shahi A, Haas CT, West JS, Haas RCG. Comparison of point-cloud acquisition from laser-scanning and photogrammetry based on field experimentation Proceedings, Annual Conference - Canadian Society For Civil Engineering. 3: 2328-2338.  1
2011 Zhang D, Haas CT, Goodrum P, Caldas CH, Granger R. Analysis of a rework reduction program for construction productivity continuous improvement Proceedings, Annual Conference - Canadian Society For Civil Engineering. 3: 2219-2228.  1
2011 Safa M, Gouett MC, Haas CT, Goodrum PM, Caldas CH. Implementation of weld-less innovations on construction projects Proceedings, Annual Conference - Canadian Society For Civil Engineering. 3: 2070-2079.  1
2011 Shahi A, Safa M, Karimidorabati S, Nasir H, Haas CT. Discrete modelling and simulation for optimization and planning Proceedings, Annual Conference - Canadian Society For Civil Engineering. 3: 2339-2348.  1
2010 Nasir H, Haas CT, Young DA, Razavi SN, Caldas C, Goodrum P. An implementation model for automated construction materials tracking and locating Canadian Journal of Civil Engineering. 37: 588-599. DOI: 10.1139/L09-178  1
2010 Razavi SN, Haas CT. Multisensor data fusion for on-site materials tracking in construction Automation in Construction. 19: 1037-1046. DOI: 10.1016/j.autcon.2010.07.017  1
2010 Bosché F, Turkan Y, Haas CT, Haas R. Fusing 4D modelling and laser scanning for construction schedule control Association of Researchers in Construction Management, Arcom 2010 - Proceedings of the 26th Annual Conference. 1229-1238.  1
2009 Wang Y, Goodrum PM, Haas CT, Glover RW. Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the u.s. industrial construction sector Journal of Construction Engineering and Management. 135: 999-1008. DOI: 10.1061/(ASCE)CO.1943-7862.0000072  1
2009 Zhai D, Goodrum PM, Haas CT, Caldas CH. Relationship between automation and integration of construction information systems and labor productivity Journal of Construction Engineering and Management. 135: 746-753. DOI: 10.1061/(ASCE)CO.1943-7862.0000024  1
2009 Bosche F, Haas CT, Akinci B. Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control Journal of Computing in Civil Engineering. 23: 311-318. DOI: 10.1061/(ASCE)0887-3801(2009)23:6(311)  1
2009 Chong WK, Kumar S, Haas CT, Beheiry SMA, Coplen L, Oey M. Understanding and interpreting baseline perceptions of sustainability in construction among civil engineers in the United States Journal of Management in Engineering. 25: 143-154. DOI: 10.1061/(ASCE)0742-597X(2009)25:3(143)  1
2009 Hwang BG, Thomas SR, Haas CT, Caldas CH. Measuring the impact of rework on construction cost performance Journal of Construction Engineering and Management. 135: 187-198. DOI: 10.1061/(ASCE)0733-9364(2009)135:3(187)  1
2009 Grau D, Caldas CH, Haas CT, Goodrum PM, Gong J. Assessing the impact of materials tracking technologies on construction craft productivity Automation in Construction. 18: 903-911. DOI: 10.1016/j.autcon.2009.04.001  1
2009 Razavi SN, Haas CT, Vanheeghe P, Duflos E. Real world implementation of belief function theory to detect dislocation of materials in construction 2009 12th International Conference On Information Fusion, Fusion 2009. 748-755.  1
2009 Grau D, Caldas CH, Haas CT, Goodrum PM, Gong J. Impact of fast automated tracking of construction components on labor productivity 2009 26th International Symposium On Automation and Robotics in Construction, Isarc 2009. 505-511.  1
2008 Baïz S, Tighe SL, Haas CT, Mills B, Perchanok M. Development of frost and thaw depth predictors for decision making about variable load restrictions Transportation Research Record. 1-8. DOI: 10.3141/2053-01  1
2008 Wang Y, Goodrum PM, Haas CT, Glover RW. Craft training issues in American industrial and commercial construction Journal of Construction Engineering and Management. 134: 795-803. DOI: 10.1061/(ASCE)0733-9364(2008)134:10(795)  1
2008 Bosche F, Haas CT. Automated retrieval of 3D CAD model objects in construction range images Automation in Construction. 17: 499-512. DOI: 10.1016/j.autcon.2007.09.001  1
2008 Bosche F, Haas CT, Murray P. Performance of automated project progress tracking with 3D data fusion Proceedings, Annual Conference - Canadian Society For Civil Engineering. 1: 349-358.  1
2008 Bosche FN, Haas CT. Automated retrieval of project three-dimensional CAD objects in range point clouds to support automated dimensional QA/QC Electronic Journal of Information Technology in Construction. 13: 71-85.  1
2008 Bosche F, Haas CT. Automated 3D data collection (A3dDC) for 3D Building Information Modeling Isarc 2008 - Proceedings From the 25th International Symposium On Automation and Robotics in Construction. 279-285.  1
2007 Bosche F, Haas CT. Towards automated retrieval of 3D designed data in 3D sensed data Congress On Computing in Civil Engineering, Proceedings. 648-656. DOI: 10.1061/40937(261)77  1
2007 Teizer J, Caldas CH, Haas CT. Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources Journal of Construction Engineering and Management. 133: 880-888. DOI: 10.1061/(ASCE)0733-9364(2007)133:11(880)  1
2007 Song J, Haas CT, Caldas CH. A proximity-based method for locating RFID tagged objects Advanced Engineering Informatics. 21: 367-376. DOI: 10.1016/j.aei.2006.09.002  1
2006 Caldas CH, Haas CT, Liapi KA, Teizer J. Modeling job sites in real time to improve safety during equipment operation Proceedings of Spie - the International Society For Optical Engineering. 6174. DOI: 10.1117/12.657939  1
2006 Teizer J, Haas CT, Caldas CH, Bosche F. Real-time three-dimensional object detection and tracking in transportation Applications of Advanced Technology in Transportation - Proceedings of the Ninth International Conference On Applications of Advanced Technology in Transportation. 123-128. DOI: 10.1061/40799(213)21  1
2006 Kim C, Haas CT, Liapi KA, Caldas CH. Human-assisted obstacle avoidance system using 3D workspace modeling for construction equipment operation Journal of Computing in Civil Engineering. 20: 177-186. DOI: 10.1061/(ASCE)0887-3801(2006)20:3(177)  1
2006 Brandenburg SG, Haas CT, Byrom K. Strategic management of human resources in construction Journal of Management in Engineering. 22: 89-96. DOI: 10.1061/(ASCE)0742-597X(2006)22:2(89)  1
2006 Song J, Haas CT, Caldas CH. Tracking the location of materials on construction job sites Journal of Construction Engineering and Management. 132: 911-918. DOI: 10.1061/(ASCE)0733-9364(2006)132:9(911)  1
2006 Caldas CH, Torrent DG, Haas CT. Using global positioning system to improve materials-locating processes on industrial projects Journal of Construction Engineering and Management. 132: 741-749. DOI: 10.1061/(ASCE)0733-9364(2006)132:7(741)  1
2006 Beheiry SMA, Chong WK, Haas CT. Examining the business impact of owner commitment to sustainability Journal of Construction Engineering and Management. 132: 384-392. DOI: 10.1061/(ASCE)0733-9364(2006)132:4(384)  1
2006 Srour IM, Haas CT, Morton DP. Linear programming approach to optimize strategic investment in the construction workforce Journal of Construction Engineering and Management. 132: 1158-1166. DOI: 10.1061/(ASCE)0733-9364(2006)132:11(1158)  1
2006 Srour IM, Haas CT, Borcherding JD. What does the construction industry value in its workers? Journal of Construction Engineering and Management. 132: 1053-1058. DOI: 10.1061/(ASCE)0733-9364(2006)132:10(1053)  1
2006 Song J, Haas CT, Caldas C, Ergen E, Akinci B. Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects Automation in Construction. 15: 166-177. DOI: 10.1016/j.autcon.2005.03.001  1
2005 Castañeda JA, Tucker RL, Haas CT. Workers' skills and receptiveness to operate under the Tier II construction management strategy Journal of Construction Engineering and Management. 131: 799-807. DOI: 10.1061/(ASCE)0733-9364(2005)131:7(799)  1
2005 Song J, Fagerlund WR, Haas CT, Tatum CB, Vanegas JA. Considering prework on industrial projects Journal of Construction Engineering and Management. 131: 723-733. DOI: 10.1061/(ASCE)0733-9364(2005)131:6(723)  1
2005 Kim C, Haas CT, Liapi KA. Rapid, on-site spatial information acquisition and its use for infrastructure operation and maintenance Automation in Construction. 14: 666-684. DOI: 10.1016/j.autcon.2005.02.002  1
2005 Caldas CH, Torrent DG, Haas CT. GPS technology for locating fabricated pipes on industrial projects Proceedings of the 2005 Asce International Conference On Computing in Civil Engineering. 1867-1874.  1
2005 Teizer J, Kim C, Haas CT, Liapi KA, Caldas CH. Framework for real-time three-dimensional modeling of infrastructure Transportation Research Record. 177-186.  1
2005 Teizer J, Liapi KA, Caldas CH, Haas CT. Experiments in real-time spatial data acquisition for obstacle detection Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress. 1099-1108.  1
2005 Teizer J, Bosche F, Caldas CH, Haas CT, Liapi KA. Real-time, three-dimensional object detection and modeling in construction 22nd International Symposium On Automation and Robotics in Construction, Isarc 2005 1
2004 Kim H, Rauch AF, Haas CT. Automated quality assessment of stone aggregates based on laser imaging and a neural network Journal of Computing in Civil Engineering. 18: 58-64. DOI: 10.1061/(ASCE)0887-3801(2004)18:1(58)  1
2004 Cho YK, Haas CT, Sreenivasan SV, Liapi K. Position error modeling for automated construction manipulators Journal of Construction Engineering and Management. 130: 50-58. DOI: 10.1061/(ASCE)0733-9364(2004)130:1(50)  1
2004 Goodrum PM, Haas CT. Long-term impact of equipment technology on labor productivity in the U.S. construction industry at the activity level Journal of Construction Engineering and Management. 130: 124-133. DOI: 10.1061/(ASCE)0733-9364(2004)130:1(124)  1
2004 Kwon SW, Bosche F, Kim C, Haas CT, Liapi KA. Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds Automation in Construction. 13: 67-81. DOI: 10.1016/j.autcon.2003.08.007  1
2004 Chiu YC, Haas CT. Making ITS communication technology acquisition decisions under uncertainty Ieee Conference On Intelligent Transportation Systems, Proceedings, Itsc. 797-802.  1
2004 Kim C, Haas CT, Liapi KA, McLaughlin J, Teizer J, Bosché F. Rapid Human-Assisted, Obstacle Avoidance System using Sparse Range Point Clouds Engineering Construction and Operations in Challenging Environments Earth and Space 2004: Proceedings of the Ninth Biennial Asce Aerospace Division International Conference. 115-122.  1
2003 Carley LA, Haas CT, Borcherding JD, Goodrum PM. Experiences with multiskilling among non-union craft workers in US industrial construction projects Engineering, Construction and Architectural Management. 10: 374-381. DOI: 10.1108/09699980310509345  1
2003 Khoury JA, Haas CT, Mahmassani H, Logman H, Rioux T. Performance comparison of automatic vehicle identification and inductive loop traffic detectors for incident detection Journal of Transportation Engineering. 129: 600-607. DOI: 10.1061/(ASCE)0733-947X(2003)129:6(600)  1
2003 Cho YK, Haas CT. Rapid geometric modeling for unstructured construction workspaces Computer-Aided Civil and Infrastructure Engineering. 18: 242-253.  1
2003 Browne C, Rauch AF, Haas CT, Kim H. Performance Evaluation of Automated Machines for Measuring Gradation of Aggregates Geotechnical Testing Journal. 26: 373-381.  1
2003 Kim H, Haas CT, Rauch AF, Browne C. 3D image segmentation of aggregates from laser profiling Computer-Aided Civil and Infrastructure Engineering. 18: 254-263.  1
2002 Kim YS, Haas CT. A man-machine balanced rapid object model for automation of pavement crack sealing and maintenance Canadian Journal of Civil Engineering. 29: 459-474. DOI: 10.1139/l02-018  1
2002 Goodrum PM, Haas CT, Glover RW. The divergence in aggregate and activity estimates of US construction productivity Construction Management and Economics. 20: 415-423. DOI: 10.1080/01446190210145868  1
2002 Kim H, Haas CT, Rauch AF, Browne C. Dimensional ratios for stone aggregates from three-dimensional laser scans Journal of Computing in Civil Engineering. 16: 175-183. DOI: 10.1061/(ASCE)0887-3801(2002)16:3(175)  1
2002 Goodrum PM, Haas CT. Partial factor productivity and equipment technology change at activity level in U.S. construction industry Journal of Construction Engineering and Management. 128: 463-472. DOI: 10.1061/(ASCE)0733-9364(2002)128:6(463)  1
2002 Gomar JE, Haas CT, Morton DP. Assignment and allocation optimization of partially multiskilled workforce Journal of Construction Engineering and Management. 128: 103-109. DOI: 10.1061/(ASCE)0733-9364(2002)128:2(103)  1
2002 Cho YK, Haas CT, Liapi K, Sreenivasan SV. A framework for rapid local area modeling for construction automation Automation in Construction. 11: 629-641. DOI: 10.1016/S0926-5805(02)00004-3  1
2002 Kim H, Haas CT, Rauch AF, Browne C. Wavelet-based three-dimensional descriptors of aggregate particles Transportation Research Record. 109-116.  1
2001 Cho YK, Haas CT, Liapi KA, Sreenivasan SV. Rapid visualization of geometric information in a construction environment Proceedings of the International Conference On Information Visualisation. 2001: 31-36. DOI: 10.1109/IV.2001.942036  1
2001 Goodrum PM, Haas CT. Closure by Paul M. Goodrum and Carl T. Haas Journal of Construction Engineering and Management. 127: 428-429.  1
2000 Goodrum PM, Haas CT, Borcherding JD, Allmon E. Case studies of U.S. construction labor productivity trends, 1970-1998 Proceedings of Construction Congress Vi: Building Together For a Better Tomorrow in An Increasingly Complex World. 278: 808-817. DOI: 10.1061/40475(278)85  1
2000 Goodrum PM, Haas CT. Variables affecting innovations in the U.S. construction industry Proceedings of Construction Congress Vi: Building Together For a Better Tomorrow in An Increasingly Complex World. 278: 525-533. DOI: 10.1061/40475(278)57  1
2000 Allmon E, Haas CT, Borcherding JD, Goodrum PM. U.S. construction labor productivity trends, 1970-1998 Journal of Construction Engineering and Management. 126: 97-104. DOI: 10.1061/(ASCE)0733-9364(2000)126:2(97)  1
2000 Kim YS, Haas CT. Model for automation of infrastructure maintenance using representational forms Automation in Construction. 10: 57-68. DOI: 10.1016/S0926-5805(99)00028-X  1
2000 Bauhan TL, Fowler DW, Haas CT. Wastewater line spot repair: Two trenchless alternatives Journal of Protective Coatings and Linings. 17: 12 pp.  1
2000 Seo J, Haas CT, Saidi K, Sreenivasan SV. Graphical control interface for construction and maintenance equipment Journal of Construction Engineering and Management. 126: 210-218.  1
1999 Ueki M, Haas CT, Seo J. Decision tool for microtunneling method selection Journal of Construction Engineering and Management. 125: 123-131. DOI: 10.1061/(ASCE)0733-9364(1999)125:2(123)  1
1999 Saidi KS, Seo J, Sreenivasan SV, Haas CT, Traver AE. Design of a tele-operated robot for the maintenance of boiler hoppers in electric power plants Journal of Mechanical Design, Transactions of the Asme. 121: 647-649.  1
1998 Kim YS, Haas CT, Greer R. Path planning for machine vision assisted, teleoperated pavement crack sealer Journal of Transportation Engineering. 124: 137-143.  1
1998 Burleson RC, Haas CT, Tucker RL, Stanley A. Multiskilled labor utilization strategies in construction Journal of Construction Engineering and Management. 124: 480-489.  1
1998 LeBlond D, Owen F, Gibson GE, Haas CT, Traver AE. Control improvement for advanced construction equipment Journal of Construction Engineering and Management. 124: 289-296.  1
1997 Bauhan TL, Fowler DW, Haas CT. Performance testing of trenchless wastewater line spot repairs Journal of Infrastructure Systems. 3: 40-48.  1
1997 Gambatese JA, Hinze JW, Haas CT. Tool to design for construction worker safety Journal of Architectural Engineering. 3: 32-41.  1
1996 Lin KL, Haas CT. An interactive planning environment for critical operations Journal of Construction Engineering and Management. 122: 212-230.  1
1996 Lin KL, Haas CT. Multiple heavy lifts optimization Journal of Construction Engineering and Management. 122: 354-362.  1
1994 Tucker RL, O'Connor JT, Gatton TM, Gibson GE, Haas CT, Hudson DN. The Impact of Computer Technology on Construction's Future Computer‐Aided Civil and Infrastructure Engineering. 9: 3-11. DOI: 10.1111/j.1467-8667.1994.tb00357.x  1
1993 Hornaday WC, Haas CT, O’Connor JT, Wen J. Computer-aided planning for heavy lifts Journal of Construction Engineering and Management. 119: 498-515. DOI: 10.1061/(ASCE)0733-9364(1993)119:3(498)  1
Show low-probability matches.