Year |
Citation |
Score |
2020 |
Burke EK, Pinedo M. Journal of scheduling (2020) Journal of Scheduling. 23: 1-2. DOI: 10.1007/S10951-020-00642-X |
0.402 |
|
2020 |
Hermelin D, Manoussakis G, Pinedo M, Shabtay D, Yedidsion L. Parameterized Multi-Scenario Single-Machine Scheduling Problems Algorithmica. 82: 2644-2667. DOI: 10.1007/S00453-020-00702-W |
0.44 |
|
2019 |
Yu T, Pinedo M. Flow shops with reentry: Reversibility properties and makespan optimal schedules European Journal of Operational Research. 282: 478-490. DOI: 10.1016/J.Ejor.2019.09.036 |
0.41 |
|
2019 |
Hermelin D, Pinedo M, Shabtay D, Talmon N. On the parameterized tractability of single machine scheduling with rejection European Journal of Operational Research. 273: 67-73. DOI: 10.1016/J.Ejor.2018.07.038 |
0.492 |
|
2019 |
Burke EK, Pinedo M. Journal of scheduling (2019) Journal of Scheduling. 22: 1-2. DOI: 10.1007/S10951-019-00603-Z |
0.402 |
|
2018 |
Jung KS, Geismar HN, Pinedo M, Sriskandarajah C. Throughput Optimization in Circular Dual‐Gripper Robotic Cells Production and Operations Management. 27: 285-303. DOI: 10.1111/Poms.12797 |
0.328 |
|
2018 |
Allahverdi A, Pesch E, Pinedo M, Werner F. Scheduling in manufacturing systems: new trends and perspectives International Journal of Production Research. 56: 6333-6335. DOI: 10.1080/00207543.2018.1504252 |
0.334 |
|
2018 |
Burke EK, Pinedo M. Journal of Scheduling (2018) Journal of Scheduling. 21: 1-1. DOI: 10.1007/S10951-018-0555-3 |
0.402 |
|
2018 |
Hermelin D, Karhi S, Pinedo M, Shabtay D. New Algorithms for Minimizing the Weighted Number of Tardy Jobs On a Single Machine Annals of Operations Research. 1-17. DOI: 10.1007/S10479-018-2852-9 |
0.412 |
|
2017 |
Zacharias C, Pinedo M. Managing customer arrivals in service systems with multiple identical servers Manufacturing & Service Operations Management. 19: 639-656. DOI: 10.1287/Msom.2017.0629 |
0.408 |
|
2017 |
Burke E, Pinedo M. Journal of Scheduling (2017) Journal of Scheduling. 20: 1-1. DOI: 10.1007/S10951-017-0509-1 |
0.402 |
|
2017 |
Su H, Pinedo M, Wan G. Parallel machine scheduling with eligibility constraints: A composite dispatching rule to minimize total weighted tardiness Naval Research Logistics. 64: 249-267. DOI: 10.1002/Nav.21744 |
0.449 |
|
2015 |
Jung KS, Geismar HN, Pinedo M, Sriskandarajah C. Approximations to optimal sequences in single-gripper and dual-gripper robotic cells with circular layouts Iie Transactions (Institute of Industrial Engineers). 47: 634-652. DOI: 10.1080/0740817X.2014.937019 |
0.387 |
|
2015 |
Pinedo M, Zacharias C, Zhu N. Scheduling in the service industries: An overview Journal of Systems Science and Systems Engineering. 24: 1-48. DOI: 10.1007/S11518-015-5266-0 |
0.363 |
|
2015 |
Burke EK, Pinedo M. Journal of Scheduling (2015) Journal of Scheduling. 18: 1-1. DOI: 10.1007/S10951-014-0412-Y |
0.402 |
|
2015 |
Lei L, Pinedo M, Qi L, Wang S, Yang J. Personnel scheduling and supplies provisioning in emergency relief operations Annals of Operations Research. DOI: 10.1007/S10479-015-1990-6 |
0.326 |
|
2014 |
Zacharias C, Pinedo M. Appointment scheduling with no-shows and overbooking Production and Operations Management. 23: 788-801. DOI: 10.1111/Poms.12065 |
0.432 |
|
2014 |
Burke E, Pinedo M. Journal of Scheduling (2014) Journal of Scheduling. 17: 1-2. DOI: 10.1007/S10951-013-0365-6 |
0.402 |
|
2013 |
Cadenillas A, Lakner P, Pinedo M. Optimal production management when demand depends on the business cycle Operations Research. 61: 1046-1062. DOI: 10.1287/Opre.2013.1181 |
0.421 |
|
2013 |
Lee K, Lei L, Pinedo M, Wang S. Operations scheduling with multiple resources and transportation considerations International Journal of Production Research. 51: 7071-7090. DOI: 10.1080/00207543.2013.781283 |
0.353 |
|
2013 |
Pinedo M, Reed J. The least flexible job first rule in scheduling and in queueing Operations Research Letters. 41: 618-621. DOI: 10.1016/J.Orl.2013.08.009 |
0.469 |
|
2013 |
Burke E, Pinedo M. Journal of Scheduling (2013) Journal of Scheduling. 16: 1-2. DOI: 10.1007/S10951-013-0316-2 |
0.402 |
|
2012 |
Burke EK, Pinedo M. Editorial: Journal of Scheduling (2012) Journal of Scheduling. 15: 1-2. DOI: 10.1007/S10951-012-0268-Y |
0.393 |
|
2012 |
Lee K, Lei L, Pinedo M. Production scheduling with history-dependent setup times Naval Research Logistics. 59: 58-68. DOI: 10.1002/Nav.21472 |
0.517 |
|
2011 |
Briskorn D, Leung J, Pinedo M. Robust scheduling on a single machine using time buffers Iie Transactions. 43: 383-398. DOI: 10.1080/0740817X.2010.505123 |
0.491 |
|
2011 |
Haksöz Ç, Pinedo M. Economic lot scheduling with resources in parallel International Journal of Production Research. 49: 2625-2641. DOI: 10.1080/00207543.2010.532931 |
0.497 |
|
2010 |
Cadenillas A, Lakner P, Pinedo M. Optimal control of a mean-reverting inventoryz Operations Research. 58: 1697-1710. DOI: 10.1287/Opre.1100.0835 |
0.359 |
|
2010 |
Leung JYT, Pinedo M, Wan G. Competitive Two-Agent Scheduling and Its Applications Operations Research. 58: 458-469. DOI: 10.1287/Opre.1090.0744 |
0.423 |
|
2010 |
Hatzakis ED, Nair SK, Pinedo M. Operations in financial services - An overview Production and Operations Management. 19: 633-664. DOI: 10.1111/J.1937-5956.2010.01163.X |
0.343 |
|
2010 |
Geismar HN, Pinedo M. Robotic cells with stochastic processing times Iie Transactions (Institute of Industrial Engineers). 42: 897-914. DOI: 10.1080/0740817X.2010.491505 |
0.342 |
|
2010 |
Dawande M, Geismar HN, Pinedo M, Sriskandarajah C. Throughput optimization in dual-gripper interval robotic cells Iie Transactions (Institute of Industrial Engineers). 42: 1-15. DOI: 10.1080/07408170902789092 |
0.344 |
|
2010 |
Briskorn D, Choi B, Lee K, Leung JY-, Pinedo M. Complexity of single machine scheduling subject to nonnegative inventory constraints European Journal of Operational Research. 207: 605-619. DOI: 10.1016/J.Ejor.2010.05.036 |
0.491 |
|
2010 |
Wan G, Vakati SR, Leung JY-, Pinedo M. Scheduling two agents with controllable processing times European Journal of Operational Research. 205: 528-539. DOI: 10.1016/J.Ejor.2010.01.005 |
0.465 |
|
2010 |
Bock S, Pinedo M. A decomposition scheme for single stage scheduling problems Journal of Scheduling. 13: 203-212. DOI: 10.1007/S10951-010-0165-1 |
0.399 |
|
2009 |
Dawande M, Pinedo M, Sriskandarajah C. Multiple part-type production in robotic cells: equivalence of two real-world models Manufacturing and Service Operations Management. 11: 210-228. DOI: 10.1287/Msom.1070.0208 |
0.381 |
|
2009 |
Kreipl S, Pinedo M. Planning and Scheduling in Supply Chains: An Overview of Issues in Practice Production and Operations Management. 13: 77-92. DOI: 10.1111/J.1937-5956.2004.Tb00146.X |
0.352 |
|
2009 |
Mckay K, Pinedo M, Webster S. Practice-Focused Research Issues For Scheduling Systems Production and Operations Management. 11: 249-258. DOI: 10.1111/J.1937-5956.2002.Tb00494.X |
0.324 |
|
2009 |
Pinedo M. Commentary On “An Exposition Of Multiple Constraint Scheduling As Implemented In The Goal System” Production and Operations Management. 6: 25-27. DOI: 10.1111/J.1937-5956.1997.Tb00411.X |
0.347 |
|
2009 |
Burke EK, Pinedo M, Velde Svd. Journal of Scheduling: Editorial Journal of Scheduling. 12: 1-2. DOI: 10.1007/S10951-008-0100-X |
0.393 |
|
2008 |
Apte U, Maglaras C, Pinedo M. Operations in the Service Industries: Introduction to the Special Issue Production and Operations Management. 17: 235-237. DOI: 10.3401/Poms.1080.0032 |
0.32 |
|
2008 |
Leung JY-, Li H, Pinedo M. Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time Annals of Operations Research. 159: 107-123. DOI: 10.1007/S10479-007-0270-5 |
0.488 |
|
2008 |
Krasik V, Leung J, Pinedo M, Zhang J. Scheduling multiple products on parallel machines with setup costs Naval Research Logistics. 55: 654-669. DOI: 10.1002/Nav.20309 |
0.618 |
|
2008 |
Chao X, Seshadri S, Pinedo M. Optimal capacity in a coordinated supply chain Naval Research Logistics. 55: 130-141. DOI: 10.1002/Nav.20271 |
0.597 |
|
2007 |
Pinedo M. Stochastic batch scheduling and the “smallest variance first” rule Probability in the Engineering and Informational Sciences. 21: 579-595. DOI: 10.1017/S0269964807000332 |
0.509 |
|
2007 |
Leung JYT, Li H, Pinedo M, Zhang J. Minimizing total weighted completion time when scheduling orders in a flexible environment with uniform machines Information Processing Letters. 103: 119-129. DOI: 10.1016/J.Ipl.2007.03.002 |
0.506 |
|
2007 |
Leung JYT, Li H, Pinedo M. Scheduling orders for multiple product types to minimize total weighted completion time Discrete Applied Mathematics. 155: 945-970. DOI: 10.1016/J.Dam.2006.09.012 |
0.486 |
|
2006 |
Gonzalez TF, Leung JYT, Pinedo M. Minimizing total completion time on uniform machines with deadline constraints Acm Transactions On Algorithms. 2: 95-115. DOI: 10.1145/1125994.1126000 |
0.493 |
|
2006 |
Leung JY-, Li H, Pinedo M. Scheduling orders for multiple product types with due date related objectives European Journal of Operational Research. 168: 370-389. DOI: 10.1016/J.Ejor.2004.03.030 |
0.463 |
|
2006 |
Leung JY, Li H, Pinedo M. Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel Naval Research Logistics. 53: 243-260. DOI: 10.1002/Nav.20138 |
0.488 |
|
2005 |
Leung JYT, Li H, Pinedo M, Sriskandarajah C. Open shops with jobs overlap-revisited European Journal of Operational Research. 163: 569-571. DOI: 10.1016/J.Ejor.2003.11.023 |
0.465 |
|
2005 |
Leung JY, Li H, Pinedo M. Order Scheduling in an Environment with Dedicated Resources in Parallel Journal of Scheduling. 8: 355-386. DOI: 10.1007/S10951-005-2860-X |
0.494 |
|
2004 |
Leung JY-, Pinedo M. A note on scheduling parallel machines subject to breakdown and repair Naval Research Logistics. 51: 60-71. DOI: 10.1002/Nav.10105 |
0.442 |
|
2000 |
Yang Y, Kreipl S, Pinedo M. Heuristics for minimizing total weighted tardiness in flexible flow shops Journal of Scheduling. 3: 89-108. DOI: 10.1002/(Sici)1099-1425(200003/04)3:2<89::Aid-Jos36>3.0.Co;2-N |
0.399 |
|
1999 |
Seshadri S, Pinedo M. Optimal allocation of resources in a job shop environment Iie Transactions. 31: 195-206. DOI: 10.1080/07408179908969820 |
0.493 |
|
1999 |
Pinedo M, Singer M. A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop Naval Research Logistics. 46: 1-17. DOI: 10.1002/(Sici)1520-6750(199902)46:1<1::Aid-Nav1>3.0.Co;2-# |
0.455 |
|
1998 |
Singer M, Pinedo M. A computational study of branch and bound techniques for minimizing the total weighted tardiness in job shops Iie Transactions. 30: 109-118. DOI: 10.1023/A:1007405915227 |
0.464 |
|
1998 |
Seshadri S, Pinedo M. Bounds on the Mean Delay in Multiclass Queueing Networks under Shortfall-Based Priority Rules Probability in the Engineering and Informational Sciences. 12: 329-350. DOI: 10.1017/S0269964800005234 |
0.364 |
|
1998 |
Shakhlevich N, Hoogeveen H, Pinedo M. Minimizing total weighted completion time in a proportionate flow shop Journal of Scheduling. 1: 157-168. DOI: 10.1002/(Sici)1099-1425(1998100)1:3<157::Aid-Jos12>3.0.Co;2-Y |
0.445 |
|
1997 |
Lee YH, Bhaskaran K, Pinedo M. A heuristic to minimize the total weighted tardiness with sequence-dependent setups Iie Transactions. 29: 45-52. DOI: 10.1080/07408179708966311 |
0.355 |
|
1997 |
Pinedo M, Yen BP-. On the Design and Development of Object-Oriented Scheduling Systems Annals of Operations Research. 70: 359-378. DOI: 10.1023/A:1018986524234 |
0.324 |
|
1997 |
Lee YH, Pinedo M. Scheduling jobs on parallel machines with sequence-dependent setup times European Journal of Operational Research. 100: 464-474. DOI: 10.1016/S0377-2217(95)00376-2 |
0.395 |
|
1996 |
Chao X, Pinedo M, Shaw D. Networks of queues with batch services and customer coalescence Journal of Applied Probability. 33: 858-869. DOI: 10.1017/S0021900200100269 |
0.569 |
|
1995 |
Chao X, Pinedo M. On Queueing Networks with Signals and History-Dependent Routing Probability in the Engineering and Informational Sciences. 9: 341-354. DOI: 10.1017/S0269964800003910 |
0.564 |
|
1995 |
Chao X, Pinedo M. Networks of queues with batch services, signals and product form solutions Operations Research Letters. 17: 237-242. DOI: 10.1016/0167-6377(95)00026-G |
0.546 |
|
1995 |
Du C, Pinedo M. A note on minimizing the expected makespan in flowshops subject to breakdowns Naval Research Logistics. 42: 1251-1262. DOI: 10.1002/1520-6750(199512)42:8<1251::Aid-Nav3220420809>3.0.Co;2-Q |
0.379 |
|
1993 |
Eck BT, Pinedo M. On the minimization of the makespan subject to flowtime optimality Operations Research. 41: 797-801. DOI: 10.1287/Opre.41.4.797 |
0.478 |
|
1993 |
Adler L, Fraiman N, Kobacker E, Pinedo M, Plotnicoff JC, Wu TP. BPSS: a scheduling support system for the packaging industry Operations Research. 41: 641-648. DOI: 10.1287/Opre.41.4.641 |
0.439 |
|
1993 |
Hsu W, Mckay K, Ow PS, Pinedo M. Integration of disciplines for applied scheduling: a workshop report Production Planning & Control. 4: 416-421. DOI: 10.1080/09537289308919464 |
0.315 |
|
1993 |
Chao X, Pinedo M. On generalized networks of queues with positive and negative arrivals Probability in the Engineering and Informational Sciences. 7: 301-334. DOI: 10.1017/S0269964800002941 |
0.556 |
|
1992 |
Pinedo M, Shaw D, Chao X. On optimal permutation scheduling in stochastic proportionate flowshops Probability in the Engineering and Informational Sciences. 6: 513-523. DOI: 10.1017/S0269964800002709 |
0.643 |
|
1992 |
Chang C, Chao X, Pinedo M, Weber R. On the optimality of LEPT and cµ rules for machines in parallel Journal of Applied Probability. 29: 667-681. DOI: 10.1017/S0021900200043485 |
0.644 |
|
1992 |
Chao X, Pinedo M. On reversibility of tandem queues with blocking Naval Research Logistics. 39: 957-974. DOI: 10.1002/1520-6750(199212)39:7<957::Aid-Nav3220390707>3.0.Co;2-3 |
0.482 |
|
1991 |
Chang C, Chao XL, Pinedo M. Monotonicity results for queues with doubly stochastic Poisson arrivals Ross's conjecture Advances in Applied Probability. 23: 210-228. DOI: 10.2307/1427518 |
0.315 |
|
1991 |
Chang CS, Chao X, Pinedo M, Shanthikumar JG. Stochastic Convexity for Multidimensional Processes and Its Applications Ieee Transactions On Automatic Control. 36: 1347-1355. DOI: 10.1109/9.106151 |
0.527 |
|
1991 |
Chang C, Nelson R, Pinedo M. Scheduling Two Classes Of Exponential Jobs On Parallel Processors: Structural Results And Worst-Case Analysis Advances in Applied Probability. 23: 925-944. DOI: 10.1017/S0001867800024022 |
0.507 |
|
1990 |
Chang CS, Chao XL, Pinedo M. Integration of discrete-time correlated markov processes in a tdm system: Structural results Probability in the Engineering and Informational Sciences. 4: 29-56. DOI: 10.1017/S0269964800001443 |
0.53 |
|
1990 |
Emmons H, Pinedo M. Scheduling stochastic jobs with due dates on parallel machines European Journal of Operational Research. 47: 49-55. DOI: 10.1016/0377-2217(90)90088-S |
0.468 |
|
1990 |
Chang CS, Pinedo M. Bounds and inequalities for single server loss systems Queueing Systems. 6: 425-435. DOI: 10.1007/Bf02411487 |
0.331 |
|
1989 |
McCormick ST, Pinedo M, Shenker S, Wolf B. Sequencing in an assembly line with blocking to minimize cycle time Operations Research. 37: 925-935. DOI: 10.1287/Opre.37.6.925 |
0.385 |
|
1989 |
Chao X, Pinedo M, Sigman K. On the interchangeability and stochastic ordering of exponential queues in tandem with blocking Probability in the Engineering and Informational Sciences. 3: 223-236. DOI: 10.1017/S0269964800001108 |
0.544 |
|
1988 |
Pinedo M, Rammouz E. A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and Repair Probability in the Engineering and Informational Sciences. 2: 41-49. DOI: 10.1017/S0269964800000619 |
0.449 |
|
1987 |
Pinedo M, Weiss G. The “largest variance first policy in some stochastic scheduling problems Operations Research. 35: 884-891. DOI: 10.1287/Opre.35.6.884 |
0.488 |
|
1986 |
Wie SH, Pinedo M. On Minimizing the Expected Makespan and Flow Time in Stochastic Flow Shops with Blocking Mathematics of Operations Research. 11: 336-342. DOI: 10.1287/Moor.11.2.336 |
0.339 |
|
1986 |
Pinedo M, Wie S‐. Inequalities for stochastic flow shops and job shops Applied Stochastic Models and Data Analysis. 2: 61-69. DOI: 10.1002/Asm.3150020106 |
0.482 |
|
1985 |
Pinedo M, Weiss G. Scheduling Jobs with Exponentially Distributed Processing Times and Intree Precedence Constraints on Two Parallel Machines Operations Research. 33: 1381-1388. DOI: 10.1287/Opre.33.6.1381 |
0.449 |
|
1985 |
Pinedo M. A Note on Stochastic Shop Models in Which Jobs have the Same Processing Requirements on Each Machine Management Science. 31: 840-846. DOI: 10.1287/Mnsc.31.7.840 |
0.453 |
|
1985 |
Pinedo M, Schechner Z. Inequalities And Bounds For The Scheduling Of Stochastic Jobs On Parallel Machines Journal of Applied Probability. 22: 739-744. DOI: 10.1017/S002190020002951X |
0.462 |
|
1984 |
Pinedo M, Weiss G. Scheduling Jobs with Exponentially Distributed Processing Times on Two Machines with Resource Constraints Management Science. 30: 883-899. DOI: 10.1287/Mnsc.30.7.883 |
0.467 |
|
1984 |
Pinedo M. A note on the flow time and the number of tardy jobs in stochastic open shops European Journal of Operational Research. 18: 81-85. DOI: 10.1016/0377-2217(84)90265-0 |
0.488 |
|
1984 |
Pinedo M. Optimal policies in stochastic shop scheduling Annals of Operations Research. 1: 305-329. DOI: 10.1007/Bf01874395 |
0.472 |
|
1983 |
Pinedo M. Stochastic Scheduling with Release Dates and Due Dates Operations Research. 31: 559-572. DOI: 10.1287/Opre.31.3.559 |
0.401 |
|
1982 |
Pinedo M, Wolff RW. A Comparison Between Tandem Queues with Dependent and Independent Service Times Operations Research. 30: 464-479. DOI: 10.1287/Opre.30.3.464 |
0.358 |
|
1982 |
Pinedo M. Minimizing the Expected Makespan in Stochastic Flow Shops Operations Research. 30: 148-162. DOI: 10.1287/Opre.30.1.148 |
0.469 |
|
1981 |
Pinedo M. Minimizing Makespan with Bimodal Processing Time Distributions Management Science. 27: 582-586. DOI: 10.1287/Mnsc.27.5.582 |
0.379 |
|
1981 |
Pinedo M. A note on the two machine job shop with exponential processing times Naval Research Logistics Quarterly. 28: 693-696. DOI: 10.1002/Nav.3800280417 |
0.423 |
|
1980 |
Pinedo M. Scheduling spares with exponential lifetimes in a two-component parallel system Journal of Applied Probability. 17: 1025-1032. DOI: 10.1017/S002190020009731X |
0.357 |
|
1980 |
Weiss G, Pinedo M. Scheduling Tasks with Exponential Service Times on Nonidentical Processors to Minimize Various Cost Functions. Journal of Applied Probability. 17: 187-202. DOI: 10.1017/S0021900200046921 |
0.411 |
|
1979 |
Pinedo M, Weiss G. Scheduling of stochastic tasks on two parallel processors Naval Research Logistics Quarterly. 26: 527-535. DOI: 10.1002/Nav.3800260314 |
0.355 |
|
Show low-probability matches. |