James R. Perkins - Publications

Affiliations: 
Boston University, Boston, MA, United States 
Area:
System Science Engineering, Statistics

17 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2011 Wang M, Perkins JR. The time interval alignment (IA) policies, boundary and applications with multiple stream arrivals Journal of Systems Science and Systems Engineering. 20: 400-415. DOI: 10.1007/S11518-011-5183-9  0.538
2007 Wu X, Srikant R, Perkins JR. Scheduling Efficiency of Distributed Greedy Scheduling Algorithms in Wireless Networks Ieee Transactions On Mobile Computing. 6: 595-605. DOI: 10.1109/Tmc.2007.1061  0.378
2006 Wang M, Perkins JR. Using Interval Alignment policies for efficient production control of supply chain systems International Journal of Industrial and Systems Engineering. 1: 87-108. DOI: 10.1504/Ijise.2006.009051  0.557
2004 Kogan K, Shu C, Perkins JR. Optimal finite-horizon production control in a defect-prone environment Ieee Transactions On Automatic Control. 49: 1795-1803. DOI: 10.1109/Tac.2004.835597  0.531
2004 Perkins JR. Optimal Control of Failure-Prone Manufacturing Systems with Constant Repair Times Annals of Operations Research. 125: 233-261. DOI: 10.1023/B:Anor.0000011193.32585.A8  0.453
2003 Eryilmaz A, Srikant R, Perkins JR. Stable scheduling policies for fading wireless channels Ieee International Symposium On Information Theory - Proceedings. 454. DOI: 10.1109/Tnet.2004.842226  0.435
2003 Kogan K, Perkins JR. Infinite horizon production planning with periodic demand: solvable cases and a general numerical approach Iie Transactions. 35: 61-71. DOI: 10.1080/07408170304432  0.422
2002 Wang Y, Perkins JR, Khurana A. Optimal resource allocation in new product development projects: a control-theoretic approach Ieee Transactions On Automatic Control. 47: 1267-1276. DOI: 10.1109/Tac.2002.800740  0.423
2002 Kogan K, Leu Y, Perkins JR. Parallel-machine, multiple-product-type, continuous-time scheduling: decomposable cases Iie Transactions. 34: 11-22. DOI: 10.1023/A:1019237013642  0.435
2001 Martinelli F, Shu C, Perkins JR. On the optimality of myopic production controls for single-server, continuous-flow manufacturing systems Ieee Transactions On Automatic Control. 46: 1269-1273. DOI: 10.1109/9.940932  0.584
2001 Shu C, Perkins JR. Optimal PHP production of multiple part-types on a failure-prone machine with quadratic buffer costs Ieee Transactions On Automatic Control. 46: 541-549. DOI: 10.1109/9.917656  0.565
2001 Perkins JR, Srikant R. Failure-prone production systems with uncertain demand Ieee Transactions On Automatic Control. 46: 441-449. DOI: 10.1109/9.911420  0.507
2001 Perkins JR. Book reviews: Optimal flow control in manufacturing systems: production planning and scheduling Automatica. 37: 1499-1500. DOI: 10.1016/S0005-1098(01)00107-8  0.411
1997 Perkins JR, Srikant R. Scheduling multiple part-types in an unreliable single-machine manufacturing system Ieee Transactions On Automatic Control. 42: 364-377. DOI: 10.1109/9.557579  0.47
1995 Perkins JR, Srikant R. Hedging policies for failure-prone manufacturing systems: optimality of JIT and bounds on buffer levels Proceedings of the Ieee Conference On Decision and Control. 3: 3144-3149. DOI: 10.1109/9.701096  0.509
1995 Perkins JR, Kumar PR. Optimal control of pull manufacturing systems Ieee Transactions On Automatic Control. 40: 2040-2051. DOI: 10.1109/9.478229  0.474
1989 Perkins JR, Kumark PR. Stable, distributed, real-time scheduling of flexible manufacturing/assembly/diassembly systems Ieee Transactions On Automatic Control. 34: 139-148. DOI: 10.1109/9.21085  0.415
Show low-probability matches.