Year |
Citation |
Score |
2015 |
Wu Q, Leung JY, Yuan X, Huang X, Li H, Huang Z, Li Y. Biological risk, source and pollution history of organochlorine pesticides (OCPs) in the sediment in Nansha mangrove, South China. Marine Pollution Bulletin. 96: 57-64. PMID 26021291 DOI: 10.1016/j.marpolbul.2015.05.047 |
0.476 |
|
2015 |
Wu Q, Leung JY, Geng X, Chen S, Huang X, Li H, Huang Z, Zhu L, Chen J, Lu Y. Heavy metal contamination of soil and water in the vicinity of an abandoned e-waste recycling site: implications for dissemination of heavy metals. The Science of the Total Environment. 506: 217-25. PMID 25460954 DOI: 10.1016/j.scitotenv.2014.10.121 |
0.466 |
|
2007 |
Leung JY-, Li H, Zhao H. Scheduling Two-Machine Flow Shops With Exact Delays International Journal of Foundations of Computer Science. 18: 341-359. DOI: 10.1142/S0129054107004711 |
0.349 |
|
2007 |
Leung JYT, Li H, Pinedo M, Zhang J. Minimizing total weighted completion time when scheduling orders in a flexible environment with uniform machines Information Processing Letters. 103: 119-129. DOI: 10.1016/J.Ipl.2007.03.002 |
0.389 |
|
2007 |
Leung JYT, Li H, Pinedo M. Scheduling orders for multiple product types to minimize total weighted completion time Discrete Applied Mathematics. 155: 945-970. DOI: 10.1016/J.Dam.2006.09.012 |
0.393 |
|
2006 |
Leung JY-, Li H, Pinedo M. Scheduling orders for multiple product types with due date related objectives European Journal of Operational Research. 168: 370-389. DOI: 10.1016/J.Ejor.2004.03.030 |
0.374 |
|
2006 |
Leung JY, Li H, Pinedo M. Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel Naval Research Logistics. 53: 243-260. DOI: 10.1002/Nav.20138 |
0.555 |
|
2005 |
Leung JYT, Li H, Pinedo M, Sriskandarajah C. Open shops with jobs overlap-revisited European Journal of Operational Research. 163: 569-571. DOI: 10.1016/J.Ejor.2003.11.023 |
0.338 |
|
2005 |
Leung JY, Li H, Pinedo M. Order Scheduling in an Environment with Dedicated Resources in Parallel Journal of Scheduling. 8: 355-386. DOI: 10.1007/S10951-005-2860-X |
0.562 |
|
Show low-probability matches. |