Yih-Long Chang - Publications

Affiliations: 
Georgia Institute of Technology, Atlanta, GA 
Area:
Management Business Administration, Operations Research

23 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2017 Lin CM, Su JC, Chang YJ, Liu CK, Lu HH, Jong YJ. Is carotid sonography a useful tool for predicting functional capabilities in ischemic stroke patients following carotid artery stenting? Medicine. 96: e6363. PMID 28328821 DOI: 10.1097/MD.0000000000006363  0.459
2011 Su JCP, Chang Y, Ho JC. Framework of overlapping product development activities to maximize profit Journal of the Chinese Institute of Industrial Engineers. 28: 616-627. DOI: 10.1080/10170669.2011.651166  0.321
2010 Su JCP, Chang Y, Ferguson M, Ho JC. The impact of delayed differentiation in make-to-order environments International Journal of Production Research. 48: 5809-5829. DOI: 10.1080/00207540903241970  0.356
2009 Manikas A, Chang Y. A scatter search approach to sequence-dependent setup times job shop scheduling International Journal of Production Research. 47: 5217-5236. DOI: 10.1080/00207540701805646  0.682
2009 Manikas A, Chang Y, Ferguson M. BlueLinx can benefit from innovative inventory management methods for commodity forward buys Omega-International Journal of Management Science. 37: 545-554. DOI: 10.1016/J.Omega.2007.10.003  0.66
2009 Manikas A, Chang Y. Multi-criteria sequence-dependent job shop scheduling using genetic algorithms Computers & Industrial Engineering. 56: 179-185. DOI: 10.1016/J.Cie.2008.05.002  0.679
2007 Ho JC, Solis AO, Chang Y. An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems Computers & Operations Research. 34: 2562-2575. DOI: 10.1016/J.Cor.2005.09.020  0.34
2006 Ho JC, Chang Y, Solis AO. Two modifications of the least cost per period heuristic for dynamic lot-sizing Journal of the Operational Research Society. 57: 1005-1013. DOI: 10.1057/Palgrave.Jors.2602076  0.353
2005 Su JCP, Chang Y, Ferguson M. Evaluation of postponement structures to accommodate mass customization Journal of Operations Management. 23: 305-318. DOI: 10.1016/J.Jom.2004.10.016  0.334
2004 Su JCP, Chang Y, Ho JC. Evaluation of Component Commonality Strategies in Supply Chain Environment Asia-Pacific Management Review. 9: 801-821. DOI: 10.6126/Apmr.2004.9.5.03  0.307
2003 Ho JC, Chang YL. A new MRP/GT lot sizing heuristic: A simulation study Production Planning and Control. 14: 215-224. DOI: 10.1080/0953728031000085261  0.34
2001 Ho JC, Chang YL. An integrated MRP and JIT framework Computers and Industrial Engineering. 41: 173-185. DOI: 10.1016/S0360-8352(01)00052-3  0.352
1997 Hatoum KW, Chang Y. Trade-off between quoted lead time and price Production Planning & Control. 8: 158-172. DOI: 10.1080/095372897235424  0.35
1996 Chang Y, Sueyoshi T, Sullivan RS. Ranking Dispatching Rules by Data Envelopment Analysis in a Job Shop Environment Iie Transactions. 28: 631-642. DOI: 10.1080/15458830.1996.11770708  0.35
1995 Ho JC, Chang YL. Minimizing the number of tardy jobs for m parallel machines European Journal of Operational Research. 84: 343-355. DOI: 10.1016/0377-2217(93)E0280-B  0.38
1994 Chang YL. Time window capacity analysis for synchronous production Production Planning and Control. 5: 66-81. DOI: 10.1080/09537289408919473  0.372
1991 Ho JC, Chang YL. A new heuristic for the n-job, M-machine flow-shop problem European Journal of Operational Research. 52: 194-202. DOI: 10.1016/0377-2217(91)90080-F  0.361
1991 Ho JC, Chang Y. Heuristics for minimizing mean tardiness form parallel machines Naval Research Logistics. 38: 367-381. DOI: 10.1002/1520-6750(199106)38:3<367::Aid-Nav3220380307>3.0.Co;2-I  0.353
1990 Moeeni F, Chang Y. An Approximate Solution to Deterministic Kanban Systems Decision Sciences. 21: 596-607. DOI: 10.1111/J.1540-5915.1990.Tb00337.X  0.372
1990 Chang Y, Sullivan RS. Schedule generation in a dynamic job shop International Journal of Production Research. 28: 65-74. DOI: 10.1080/00207549008942684  0.348
1990 Vakharia AJ, Chang Y. A simulated annealing approach to scheduling a manufacturing cell Naval Research Logistics. 37: 559-577. DOI: 10.1002/1520-6750(199008)37:4<559::Aid-Nav3220370409>3.0.Co;2-8  0.386
1989 Chang Y, Matsuo H, Sullivan RS. A bottleneck-based beam search for job scheduling in a flexible manufacturing system International Journal of Production Research. 27: 1949-1961. DOI: 10.1080/00207548908942666  0.362
1987 Bagchi U, Sullivan RS, Chang Y. Minimizing Mean Squared Deviation of Completion Times About a Common Due Date Management Science. 33: 894-906. DOI: 10.1287/Mnsc.33.7.894  0.37