Keith R. Molenaar
Affiliations: | Civil Engineering | University of Colorado, Boulder, Boulder, CO, United States |
Area:
Civil EngineeringWebsite:
https://www.colorado.edu/ceae/keith-molenaarGoogle:
"Keith Robert Molenaar" OR "Keith R Molenaar"Bio:
https://www.proquest.com/openview/f500c6e8aa2b5535d0dfa056314c5a13/1
Parents
Sign in to add mentorAnthony D. Songer | grad student | 1997 | CU Boulder | |
(Public sector design-build: A model for project selection) |
Children
Sign in to add traineeKyungsoon Chang | grad student | 2004 | CU Boulder |
Douglas D. Gransberg | grad student | 2004 | CU Boulder |
Susan Bogus Halter | grad student | 2004 | CU Boulder |
Alfonso Bastias | grad student | 2006 | CU Boulder |
Jennifer S. Shane | grad student | 2006 | CU Boulder |
Sangjoo Lee | grad student | 2007 | CU Boulder |
Leonardo Rosas Sanchez | grad student | 2008 | CU Boulder |
Spencer J. Won | grad student | 2011 | CU Boulder |
Elizabeth R. Kraft | grad student | 2013 | CU Boulder |
Nathaniel J. Sobin | grad student | 2013 | CU Boulder |
Dai (Daniel) Tran | grad student | 2013 | CU Boulder |
Christofer M. Harper | grad student | 2014 | CU Boulder |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Calahorra-Jimenez M, Alarcon LF, Torres-Machi C, et al. (2020) Improving cost performance in design-bid-build road projects by mapping the reasons for cost overruns into the project phases. Revista De La Construccion. 19: 334-345 |
Mesa HA, Molenaar KR, Alarcón LF. (2020) Modeling Supply Chain Integration in an Integrated Project Delivery System Sustainability. 12: 5092 |
Madson KM, Franz B, Molenaar KR, et al. (2020) Strategic development of flexible manufacturing facilities Engineering, Construction and Architectural Management. 27: 1299-1314 |
Bhandari S, Molenaar KR. (2020) Using Debiasing Strategies to Manage Cognitive Biases in Construction Risk Management: Recommendations for Practice and Future Research Practice Periodical On Structural Design and Construction. 25: 4020033 |
Calahorra-Jimenez M, Molenaar K, Torres-Machi C, et al. (2020) Structured Approach for Best-Value Evaluation Criteria: US Design–Build Highway Procurement Journal of Management in Engineering. 36: 4020086 |
Stanford MS, Molenaar KR. (2020) Cost Implications of Indefinite Delivery–Indefinite Quantity Contracting in the US Defense Sector Journal of Management in Engineering. 36: 4020065 |
Papajohn D, Asmar ME, Molenaar KR, et al. (2020) Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects Journal of Management in Engineering. 36: 4019038 |
Alleman D, Stanford MS, Papajohn D, et al. (2020) Characteristics of Stipends and Their Value-Adding Potential in Design-Build US Highway Construction Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 4520011 |
Alleman D, Antoine ALC, Stanford MS, et al. (2020) Project Delivery Methods’ Change-Order Types and Magnitudes Experienced in Highway Construction Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 4520006 |
Franz B, Molenaar KR, Roberts BAM. (2020) Revisiting Project Delivery System Performance from 1998 to 2018 Journal of Construction Engineering and Management-Asce. 146: 4020100 |