Zofia K. Rybkowski, Ph.D.
Affiliations: | 2009 | University of California, Berkeley, Berkeley, CA, United States |
Area:
Civil Engineering, Architectural Engineering, Health Care ManagementGoogle:
"Zofia Rybkowski"Parents
Sign in to add mentorIris D. Tommelein | grad student | 2009 | UC Berkeley | |
(The application of root cause analysis and target value design to evidence-based design in the capital planning of healthcare facilities.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Bajpayee A, Farahbakhsh M, Zakira U, et al. (2020) In situ Resource Utilization and Reconfiguration of Soils Into Construction Materials for the Additive Manufacturing of Buildings Frontiers in Materials. 7 |
Saseendran A, Bigelow BF, Rybkowski ZK, et al. (2020) Disputes in Construction: Evaluation of Contractual Effects of ConsensusDOCS Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 04520008 |
Rybkowski ZK. (2017) Applying Lean Methods to Healthcare Design. Herd. 10: 12-17 |
Alves TD, Lichtig W, Rybkowski ZK. (2017) Implementing Target Value Design. Herd. 1937586717690865 |
Kalantari S, Shepley MM, Rybkowski ZK, et al. (2017) Collaboration between designers and facility managers Facilities. 35: 557-572 |
Rybkowski ZK, Shepley MM, Bryant JA, et al. (2017) Facility management in Qatar: current state, perceptions and recommendations Facilities. 35: 335-355 |
Kalantari S, Shepley MM, Rybkowski ZK, et al. (2017) Designing for operational efficiency: facility managers’ perspectives on how their knowledge can be better incorporated during design Architectural Engineering and Design Management. 13: 457-478 |
Sindhu J, Choi K, Lavy S, et al. (2017) Effects of Front-End Planning under Fast-Tracked Project Delivery Systems for Industrial Projects International Journal of Construction Education and Research. 14: 163-178 |
Nanda U, Rybkowski Z, Pati S, et al. (2016) A Value Analysis of Lean Processes in Target Value Design and Integrated Project Delivery: Stakeholder Perception. Herd |
Lee S, Tabb P, Rogers J, et al. (2016) The Impacts of Cost Determinism in Architectural Foundation Design Education: An Analysis of Foundation Design Studio Procedia - Social and Behavioral Sciences. 216: 923-932 |