Mehmet R. Taner, Ph.D.
Affiliations: | 2001 | North Carolina State University, Raleigh, NC |
Area:
Industrial Engineering, Operations ResearchGoogle:
"Mehmet Taner"Parents
Sign in to add mentorRussell E. King | grad student | 2001 | NCSU | |
(Scheduling with sequence dependent setup times.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Şahinyazan FG, Kara BY, Taner MR. (2015) Selective vehicle routing for a mobile blood donation system European Journal of Operational Research. 245: 22-34 |
Taner MR, Kara BY. (2015) Endogenous Effects of Hubbing on Flow Intensities Networks and Spatial Economics |
Taner MR, Karasan OE, Yavuzturk E. (2012) Scheduling beams with different priorities on a military surveillance radar Ieee Transactions On Aerospace and Electronic Systems. 48: 1725-1739 |
Taner MR, Hodgson TJ, King RE, et al. (2007) Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure Computers and Industrial Engineering. 52: 57-70 |
Schultz SR, Hodgson TJ, King RE, et al. (2004) Minimizing Lmax for the single machine scheduling problem with family set-ups International Journal of Production Research. 42: 4315-4330 |
Schultz SR, Taner MR. (2004) Parallel dedicated machine scheduling with A single server: Full precedence case Iie Annual Conference and Exhibition 2004. 841-846 |
Taner MR, Hodgson TJ, King RE, et al. (2003) Satisfying due-dates in a job shop with sequence-dependent family set-ups International Journal of Production Research. 41: 4153-4169 |
Thoney KA, Hodgson TJ, King RE, et al. (2002) Satisfying due-dates in large multi-factory supply chains Iie Transactions. 34: 803-811 |
Thoney KA, Hodgson TJ, King RE, et al. (2002) Satisfying due-dates in large multi-factory supply chains Iie Transactions (Institute of Industrial Engineers). 34: 803-811 |