Roberto F. Lu, Ph.D.

Affiliations: 
2008 University of Washington, Seattle, Seattle, WA 
Area:
Industrial Engineering, Management Business Administration
Google:
"Roberto Lu"

Parents

Sign in to add mentor
Richard Storch grad student 2008 University of Washington
 (Asynchronous stochastic learning curve effects in a large scale production system.)
BETA: Related publications

Publications

You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect.

Wu D, Zhang LL, Jiao RJ, et al. (2013) SysML-based design chain information modeling for variety management in production reconfiguration Journal of Intelligent Manufacturing. 24: 575-596
Faber I, Li Z, Lu RF, et al. (2011) A framework for system-level manufacturability assessment 61st Annual Iie Conference and Expo Proceedings
Rusly RP, Al-Aqrabawi ZA, Osa HN, et al. (2010) Modeling of fastener kitting logistics for boeing wide body airplanes Sae International Journal of Aerospace. 2: 241-248
Lu RF, Song S. (2010) A tutorial on concepts and measures of manufacturing processes dependence Proceedings - Winter Simulation Conference. 254-267
Al-Aqrabawi ZA, Fleming DT, Maranan AS, et al. (2009) Modeling of commercial airplanes service request process flows Sae Technical Papers
Lu RF, Petersen TD, Storch RL. (2009) Asynchronous stochastic learning curve effects in engineering-to-order customisation processes International Journal of Production Research. 47: 1309-1329
Lu RF, Petersen TD, Storch RL. (2007) Modeling customized product configuration in large assembly manufacturing with supply-chain considerations International Journal of Flexible Manufacturing Systems. 19: 685-712
Lu RF, Storch RL. (2007) A statistical verification method in modeling mass customization in a production system of asynchronous stochastic learning curves Iie Annual Conference and Expo 2007 - Industrial Engineering's Critical Role in a Flat World - Conference Proceedings. 830-835
Storch RL, Lu RF, Petersen TD. (2007) Optimizing product configuration decision times in shipbuilding Rina - International Conference On Computer Applications in Shipbuilding 2007 - Papers. 1: 71-82
Zeng QL, Tseng MM, Lu RF. (2006) Staged postponement of order specification commitment for supply chain management Cirp Annals - Manufacturing Technology. 55: 501-504
See more...