Roberto F. Lu, Ph.D.
Affiliations: | 2008 | University of Washington, Seattle, Seattle, WA |
Area:
Industrial Engineering, Management Business AdministrationGoogle:
"Roberto Lu"Parents
Sign in to add mentorRichard Storch | grad student | 2008 | University of Washington | |
(Asynchronous stochastic learning curve effects in a large scale production system.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Wu D, Zhang LL, Jiao RJ, et al. (2013) SysML-based design chain information modeling for variety management in production reconfiguration Journal of Intelligent Manufacturing. 24: 575-596 |
Faber I, Li Z, Lu RF, et al. (2011) A framework for system-level manufacturability assessment 61st Annual Iie Conference and Expo Proceedings |
Rusly RP, Al-Aqrabawi ZA, Osa HN, et al. (2010) Modeling of fastener kitting logistics for boeing wide body airplanes Sae International Journal of Aerospace. 2: 241-248 |
Lu RF, Song S. (2010) A tutorial on concepts and measures of manufacturing processes dependence Proceedings - Winter Simulation Conference. 254-267 |
Al-Aqrabawi ZA, Fleming DT, Maranan AS, et al. (2009) Modeling of commercial airplanes service request process flows Sae Technical Papers |
Lu RF, Petersen TD, Storch RL. (2009) Asynchronous stochastic learning curve effects in engineering-to-order customisation processes International Journal of Production Research. 47: 1309-1329 |
Lu RF, Petersen TD, Storch RL. (2007) Modeling customized product configuration in large assembly manufacturing with supply-chain considerations International Journal of Flexible Manufacturing Systems. 19: 685-712 |
Lu RF, Storch RL. (2007) A statistical verification method in modeling mass customization in a production system of asynchronous stochastic learning curves Iie Annual Conference and Expo 2007 - Industrial Engineering's Critical Role in a Flat World - Conference Proceedings. 830-835 |
Storch RL, Lu RF, Petersen TD. (2007) Optimizing product configuration decision times in shipbuilding Rina - International Conference On Computer Applications in Shipbuilding 2007 - Papers. 1: 71-82 |
Zeng QL, Tseng MM, Lu RF. (2006) Staged postponement of order specification commitment for supply chain management Cirp Annals - Manufacturing Technology. 55: 501-504 |