I-Tung Yang, Ph.D.
Affiliations: | 2002 | University of Michigan, Ann Arbor, Ann Arbor, MI |
Area:
Civil Engineering, Industrial EngineeringGoogle:
"I-Tung Yang"Parents
Sign in to add mentorPhotios G. Ioannou | grad student | 2002 | University of Michigan | |
(Repetitive project planner: Resource -driven scheduling for repetitive construction projects.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Chou J, Cheng M, Hsieh Y, et al. (2019) Optimal path planning in real time for dynamic building fire rescue operations using wireless sensors and visual guidance Automation in Construction. 99: 1-17 |
Cheng M, Chiu K, Hsieh Y, et al. (2017) BIM integrated smart monitoring technique for building fire prevention and disaster relief Automation in Construction. 84: 14-30 |
Lin YC, Lee HY, Yang IT. (2016) Developing as-built BIM model process management system for general contractors: A case study Journal of Civil Engineering and Management. 22: 608-621 |
Ioannou PG, Yang IT. (2016) Repetitive Scheduling Method: Requirements, Modeling, and Implementation Journal of Construction Engineering and Management. 142 |
Yang IT, Hsieh YH, Kuo CG. (2016) Integrated multiobjective framework for reliability-based design optimization with discrete design variables Automation in Construction. 63: 162-172 |
Yang I, Lin Y, Lee H. (2014) Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off Journal of Construction Engineering and Management-Asce. 140: 4013036-4013036 |
Wang W, Yu W, Yang I, et al. (2013) Applying the AHP to support the best-value contractor selection-lessons learned from two case studies in Taiwan Journal of Civil Engineering and Management. 19: 24-36 |
Yang I, Hsieh Y. (2013) Reliability-based design optimization with cooperation between support vector machine and particle swarm optimization Engineering With Computers. 29: 151-163 |
Yang IT, Hsieh YM, Kung LO. (2012) Parallel computing platform for multiobjective simulation optimization of bridge maintenance planning Journal of Construction Engineering and Management. 138: 215-226 |
Lee H, Yang I, Lin Y. (2012) Laying out the occupant flows in public buildings for operating efficiency Building and Environment. 51: 231-242 |