Gary E. Whitehouse

Affiliations: 
1965-1978 Industrial Engineering Lehigh University, Bethlehem, PA, United States 
 1978-2004 University of Central Florida, Orlando, FL, United States 
Area:
Industrial Engineering, Operations Research
Website:
https://www.iise.org/Details.aspx?id=44308
Google:
"Gary Edward Whitehouse" OR "Gary E. Whitehouse"
Bio:

(1938 - 2017)
DOI: 10.1080/05695556908974412

Cross-listing: Management Tree

Parents

Sign in to add mentor
A. Alan B. Pritsker grad student 1965 Arizona State
 (Extensions, New Developments, and Applications of GERT)
BETA: Related publications

Publications

You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect.

Hepdogan S, Moraga RJ, DePuy GW, et al. (2009) A Meta-RaPS for the early/tardy single machine scheduling problem International Journal of Production Research. 47: 1717-1732
Lan G, DePuy GW, Whitehouse GE. (2007) An effective and simple heuristic for the set covering problem European Journal of Operational Research. 176: 1387-1403
DePuy GW, Moraga RJ, Whitehouse GE. (2005) Meta-RaPS: a simple and effective approach for solving the traveling salesman problem Transportation Research Part E-Logistics and Transportation Review. 41: 115-130
Moraga RJ, DePuy GW, Whitehouse GE. (2005) Meta-RaPS approach for the 0-1 Multidimensional Knapsack Problem Computers & Industrial Engineering. 48: 83-96
Whitehouse GE, DePuy GW. (2001) Solving Constrained Multiple Resource Networks Both Forward and Backward Using Brooks Algorithm Project Management Journal. 32: 24-31
Depuy GW, Whitehouse GE. (2001) A simple and effective heuristic for the resource constrained project scheduling problem International Journal of Production Research. 39: 3275-3287
DePuy GW, Whitehouse GE. (2000) Applying the COMSOAL computer heuristic to the constrained resource allocation problem Computers & Industrial Engineering. 38: 413-422
Whitehouse GE, Hanson G, Orooji A. (1990) Application of SLAM in the design and performance analysis of a multi-processor database system Computers and Industrial Engineering. 18: 49-67
Morse LC, Whitehouse GE. (1988) A study of combining heuristics for scheduling projects with limited multiple resources Computers & Industrial Engineering. 15: 153-161
Whitehouse GE, Brown JR. (1979) GENRES: An extension of Brooks Algorithm for project scheduling with resource constraints Computers & Industrial Engineering. 3: 261-268
See more...