Gary E. Whitehouse
Affiliations: | 1965-1978 | Industrial Engineering | Lehigh University, Bethlehem, PA, United States |
1978-2004 | University of Central Florida, Orlando, FL, United States |
Area:
Industrial Engineering, Operations ResearchWebsite:
https://www.iise.org/Details.aspx?id=44308Google:
"Gary Edward Whitehouse" OR "Gary E. Whitehouse"Bio:
(1938 - 2017)
DOI: 10.1080/05695556908974412
Cross-listing: Management Tree
Parents
Sign in to add mentorA. Alan B. Pritsker | grad student | 1965 | Arizona State | |
(Extensions, New Developments, and Applications of GERT) |
Children
Sign in to add traineeAdedeji B. Badiru | grad student | 1982-1984 | University of Central Florida (MathTree) |
Reinaldo J. Moraga | grad student | 2002 | University of Central Florida |
Seyhun Hepdogan | grad student | 2006 | University of Central Florida |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Hepdogan S, Moraga RJ, DePuy GW, et al. (2009) A Meta-RaPS for the early/tardy single machine scheduling problem International Journal of Production Research. 47: 1717-1732 |
Lan G, DePuy GW, Whitehouse GE. (2007) An effective and simple heuristic for the set covering problem European Journal of Operational Research. 176: 1387-1403 |
DePuy GW, Moraga RJ, Whitehouse GE. (2005) Meta-RaPS: a simple and effective approach for solving the traveling salesman problem Transportation Research Part E-Logistics and Transportation Review. 41: 115-130 |
Moraga RJ, DePuy GW, Whitehouse GE. (2005) Meta-RaPS approach for the 0-1 Multidimensional Knapsack Problem Computers & Industrial Engineering. 48: 83-96 |
Whitehouse GE, DePuy GW. (2001) Solving Constrained Multiple Resource Networks Both Forward and Backward Using Brooks Algorithm Project Management Journal. 32: 24-31 |
Depuy GW, Whitehouse GE. (2001) A simple and effective heuristic for the resource constrained project scheduling problem International Journal of Production Research. 39: 3275-3287 |
DePuy GW, Whitehouse GE. (2000) Applying the COMSOAL computer heuristic to the constrained resource allocation problem Computers & Industrial Engineering. 38: 413-422 |
Whitehouse GE, Hanson G, Orooji A. (1990) Application of SLAM in the design and performance analysis of a multi-processor database system Computers and Industrial Engineering. 18: 49-67 |
Morse LC, Whitehouse GE. (1988) A study of combining heuristics for scheduling projects with limited multiple resources Computers & Industrial Engineering. 15: 153-161 |
Whitehouse GE, Brown JR. (1979) GENRES: An extension of Brooks Algorithm for project scheduling with resource constraints Computers & Industrial Engineering. 3: 261-268 |