Muhong Zhang, Ph.D.
Affiliations: | 2006 | University of California, Berkeley, Berkeley, CA, United States |
Area:
Industrial Engineering, Operations ResearchGoogle:
"Muhong Zhang"Parents
Sign in to add mentorAlper Atamturk | grad student | 2006 | UC Berkeley | |
(Robust network flow and knapsack polyhedra.) |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Lyon JD, Zhang M, Hedman KW. (2016) Capacity response sets for security-constrained unit commitment with wind uncertainty Electric Power Systems Research. 136: 21-30 |
Lyon JD, Zhang M, Hedman KW. (2015) Locational reserve disqualification for distinct scenarios Ieee Transactions On Power Systems. 30: 357-364 |
Fu M, Askin R, Fowler J, et al. (2015) Stochastic optimization of product–machine qualification in a semiconductor back-end facility Iie Transactions. 47: 739-750 |
Li C, Zhang M, Hedman KW. (2015) N-1 reliable unit commitment via progressive hedging Journal of Energy Engineering. 141 |
Lyon JD, Hedman KW, Zhang M. (2014) Reserve requirements to efficiently manage intra-zonal congestion Ieee Transactions On Power Systems. 29: 251-258 |
Jiang R, Zhang M, Li G, et al. (2014) Two-stage network constrained robust unit commitment problem European Journal of Operational Research. 234: 751-762 |
Jiang R, Wang J, Zhang M, et al. (2013) Two-Stage Minimax Regret Robust Unit Commitment Ieee Transactions On Power Systems. 28: 2271-2282 |
Salas LC, Cárdenas MR, Zhang M. (2012) Inventory policies for humanitarian aid during hurricanes Socio-Economic Planning Sciences. 46: 272-280 |
Fu M, Askin R, Fowler J, et al. (2011) Batch production scheduling for semiconductor back-end operations Ieee Transactions On Semiconductor Manufacturing. 24: 249-260 |
Zhang M. (2011) Two-stage minimax regret robust uncapacitated lot-sizing problems with demand uncertainty Operations Research Letters. 39: 342-345 |