Sangwon Han, Ph.D.

Affiliations: 
2008 University of Illinois, Urbana-Champaign, Urbana-Champaign, IL 
Area:
Civil Engineering
Google:
"Sangwon Han"

Parents

Sign in to add mentor
Feniosky P. Mora grad student 2008 UIUC
 (A hybrid simulation model for understanding and managing non-value adding activities in large-scale design and construction projects.)
BETA: Related publications

Publications

You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect.

Park J, Cha Y, Jassmi HA, et al. (2020) Identification of Defect Generation Rules among Defects in Construction Projects Using Association Rule Mining Sustainability. 12: 3875
Park I, Kim J, Han S, et al. (2020) Analysis of Fatal Accidents and Their Causes in the Korean Construction Industry Sustainability. 12: 3120
Kim W, Park J, Cha Y, et al. (2019) Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP - Korean Journal of Construction Engineering and Management. 20: 22-31
Jin Z, Kim J, Hyun C, et al. (2019) Development of a Model for Predicting Probabilistic Life-Cycle Cost for the Early Stage of Public-Office Construction Sustainability. 11: 3828
Lee S, Cha Y, Han S, et al. (2019) Application of Association Rule Mining and Social Network Analysis for Understanding Causality of Construction Defects Sustainability. 11: 618
Kim H, Han S. (2018) Accuracy Improvement of Real-Time Location Tracking for Construction Workers Sustainability. 10: 1488
Moon S, Han S, Zekavat PR, et al. (2017) Process-waste reduction in the construction supply chain using proactive information network Concurrent Engineering. 25: 123-135
Jung S, Park J, Cha Y, et al. (2016) Improvement of Construction Quality Management through Analyzing Construction Work's Quality Inspection Results Korean Journal of Construction Engineering and Management. 17: 110-118
Jun I, Jin Z, Han S, et al. (2016) Progress Measurement Model Based on Documents for Pre-Construction Phase of Design Build Project Journal of the Architectural Institute of Korea Planning & Design. 32: 63-71
Pareek P, Han S, Misra S. (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation International Journal of Construction Management. 1-13
See more...