Wallace J. Hopp - Publications

Affiliations: 
1984-2007 Industrial Engineering and Management Sciences Northwestern University, Evanston, IL 
 2007- University of Michigan, Ann Arbor, Ann Arbor, MI 
Area:
Industrial Engineering
Website:
https://michiganross.umich.edu/faculty-research/faculty/wally-hopp

71 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2018 Saghafian S, Hopp WJ, Iravani SMR, Cheng Y, Diermeier D. Workload Management in Telemedical Physician Triage and Other Knowledge-Based Service Systems Management Science. 64: 5180-5197. DOI: 10.1287/Mnsc.2017.2905  0.387
2018 Hopp WJ. Positive lean: merging the science of efficiency with the psychology of work International Journal of Production Research. 56: 398-413. DOI: 10.1080/00207543.2017.1387301  0.332
2013 Gokpinar B, Hopp WJ, Iravani SMR. In-house globalization: The role of globally distributed design and product architecture on product development performance Production and Operations Management. 22: 1509-1523. DOI: 10.1111/Poms.12079  0.763
2011 Ebrahim-Khanjari N, Hopp W, Iravani SMR. Trust and Information Sharing in Supply Chains Production and Operations Management. 21: 444-464. DOI: 10.1111/J.1937-5956.2011.01284.X  0.37
2010 Hopp WJ, Iravani SMR, Xu WL. Vertical flexibility in supply chains Management Science. 56: 495-502. DOI: 10.1287/Mnsc.1090.1127  0.338
2010 Gokpinar B, Hopp WJ, Iravani SMR. The impact of misalignment of organizational structure and product architecture on quality in complex product development Management Science. 56: 468-484. DOI: 10.1287/Mnsc.1090.1117  0.766
2009 Xu X, Hopp WJ. Price trends in a dynamic pricing model with heterogeneous customers: A martingale perspective Operations Research. 57: 1298-1302. DOI: 10.1287/Opre.1090.0703  0.371
2009 Hopp WJ, Iravani SMR, Liu F. Managing white-collar work: An operations-oriented survey Production and Operations Management. 18: 1-32. DOI: 10.1111/J.1937-5956.2009.01002.X  0.302
2009 Tekin E, Hopp WJ, Van Oyen MP. Pooling strategies for call center agent cross-training Iie Transactions (Institute of Industrial Engineers). 41: 546-561. DOI: 10.1080/07408170802512586  0.582
2009 Hopp WJ, Iravani SMR, Shou B, Lien R. Design and control of agile automated CONWIP production lines Naval Research Logistics. 56: 42-56. DOI: 10.1002/Nav.20325  0.385
2008 Hopp WJ, Xu X. A static approximation for dynamic demand substitution with applications in a competitive market Operations Research. 56: 630-645. DOI: 10.1287/Opre.1080.0541  0.378
2008 Chayet S, Hopp WJ. Risk-sensitive sizing of responsive facilities Naval Research Logistics. 55: 218-233. DOI: 10.1002/Nav.20278  0.389
2007 Hopp WJ, Iravani SMR, Shou B. A Diagnostic Tree for Improving Production Line Performance Production and Operations Management. 16: 77-92. DOI: 10.1111/J.1937-5956.2007.Tb00167.X  0.325
2007 Gel ES, Hopp WJ, Van Oyen MP. Hierarchical cross-training in Work-In-Process-constrained systems Iie Transactions (Institute of Industrial Engineers). 39: 125-143. DOI: 10.1080/07408170600729184  0.38
2006 Xu X, Hopp WJ. A monopolistic and oligopolistic stochastic flow revenue management model Operations Research. 54: 1098-1109. DOI: 10.1287/Opre.1060.0336  0.356
2006 Yuen G, Hopp WJ, Iravani SMR. Operations systems with discretionary task completion Manufacturing and Service Operations Management. 8: 114-117. DOI: 10.1287/Mnsc.1060.0598  0.311
2006 Diermeier D, Hopp WJ, Iravani S. Innovating under Pressure: Towards a Science of Crisis Management Innovation Policy and the Economy. 7: 125-154. DOI: 10.1086/Ipe.7.25056192  0.343
2005 Hopp WJ, Iravani SMR, Shou B. Serial agile production systems with automation Operations Research. 53: 852-866. DOI: 10.1287/Opre.1050.0226  0.425
2005 Hopp WJ, Xu X. Product line selection and pricing with modularity in design Manufacturing and Service Operations Management. 7: 172-187. DOI: 10.1287/Msom.1050.0077  0.419
2004 Hopp WJ, Spearman ML. To pull or not to pull: What is the question? Manufacturing and Service Operations Management. 6: 133-148. DOI: 10.1287/Msom.1030.0028  0.7
2004 Hopp WJ, Tekin E, Van Oyen MP. Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers Management Science. 50: 83-98. DOI: 10.1287/Mnsc.1030.0166  0.611
2004 Hopp WJ, Van Oyen MP. Agile workforce evaluation: A framework for cross-training and coordination Iie Transactions (Institute of Industrial Engineers). 36: 919-940. DOI: 10.1080/07408170490487759  0.353
2002 Tekin E, Hopp WJ, Van Oyen MP. Benefits of Skill Chaining in Production Lines with Cross-Trained Workers: An Extended Abstract Manufacturing & Service Operations Management. 4: 17-20. DOI: 10.1287/Msom.4.1.17.293  0.556
2002 Gel ES, Hopp WJ, Van Oyen MP. Factors affecting opportunity of worksharing as a dynamic line balancing mechanism Iie Transactions (Institute of Industrial Engineers). 34: 847-863. DOI: 10.1080/07408170208928917  0.393
2002 Hopp WJ, Spearman ML, Chayet S, Donohue KL, Gel ES. Using an optimized queueing network model to support wafer fab design Iie Transactions (Institute of Industrial Engineers). 34: 119-130. DOI: 10.1080/07408170208928855  0.726
2002 Donohue KL, Hopp WJ, Spearman ML. Optimal design of stochastic production lines: A dynamic programming approach Iie Transactions (Institute of Industrial Engineers). 34: 891-903. DOI: 10.1023/A:1015736926725  0.736
2002 Bassok Y, Hopp WJ, Rohatgi M. A simple linear heuristic for the service constrained random yield problem Iie Transactions (Institute of Industrial Engineers). 34: 479-487. DOI: 10.1023/A:1013523421387  0.464
2001 Hopp WJ, Sturgis MR. A Simple, Robust Leadtime-Quoting Policy Manufacturing and Service Operations Management. 3: 321-336. DOI: 10.1287/Msom.3.4.321.9968  0.432
2001 Hegedus MG, Hopp WJ. Setting procurement safety lead-times for assembly systems International Journal of Production Research. 39: 3459-3478. DOI: 10.1080/00207540110061625  0.747
2001 Van Oyen MP, Gel EGS, Hopp WJ. Performance opportunity for workforce agility in collaborative and noncollaborative work systems Iie Transactions (Institute of Industrial Engineers). 33: 761-777. DOI: 10.1023/A:1010997816249  0.43
2001 Zhang RQ, Hopp WJ, Supatgiat C. Spreadsheet implementable inventory control for a distribution center Journal of Heuristics. 7: 185-203. DOI: 10.1023/A:1009613921001  0.595
2001 Hegedus MG, Hopp WJ. Due date setting with supply constraints in systems using MRP Computers and Industrial Engineering. 39: 293-305. DOI: 10.1016/S0360-8352(01)00007-9  0.757
2000 Hopp WJ, Roof Sturgis ML. Quoting manufacturing due dates subject to a service level constraint Iie Transactions (Institute of Industrial Engineers). 32: 771-784. DOI: 10.1080/07408170008967437  0.397
1999 Hopp WJ, Zhang RQ, Spearman ML. An easily implementable hierarchical heuristic for a two-echelon spare parts distribution system Iie Transactions (Institute of Industrial Engineers). 31: 977-988. DOI: 10.1080/07408179908969898  0.748
1998 Spearman ML, Hopp WJ. Teaching operations management from a science of manufacturing Production and Operations Management. 7: 132-145. DOI: 10.1111/J.1937-5956.1998.Tb00445.X  0.695
1998 Hopp WJ, Roof ML. Setting WIP levels with statistical throughput control (STC) in CONWIP production lines International Journal of Production Research. 36: 867-882. DOI: 10.1080/002075498193435  0.423
1998 Hopp WJ, Kuo YL. Heuristics for multicomponent joint replacement: Applications to aircraft engine maintenance Naval Research Logistics. 45: 435-458. DOI: 10.1002/(Sici)1520-6750(199808)45:5<435::Aid-Nav1>3.0.Co;2-4  0.384
1998 Hopp WJ, Kuo YL. An optimal structured policy for maintenance of partially observable aircraft engine components Naval Research Logistics. 45: 335-352. DOI: 10.1002/(Sici)1520-6750(199806)45:4<335::Aid-Nav1>3.0.Co;2-6  0.363
1997 Hopp WJ, Spearman ML, Zhang RQ. Easily implementable inventory control policies Operations Research. 45: 327-340. DOI: 10.1287/Opre.45.3.327  0.77
1997 Duenyas I, Hopp WJ, Bassok Y. Production quotas as bounds on interplant JIT contracts Management Science. 43: 1372-1386. DOI: 10.1287/Mnsc.43.10.1372  0.461
1995 Duenyas I, Hopp WJ. Quoting Customer Lead Times Management Science. 41: 43-57. DOI: 10.1287/Mnsc.41.1.43  0.441
1995 Simon JT, Hopp WJ. Throughput and average inventory in discrete balanced assembly systems Iie Transactions (Institute of Industrial Engineers). 27: 368-373. DOI: 10.1080/07408179508936752  0.327
1994 Hopp WJ, Nair SK. Markovian deterioration and technological change Iie Transactions (Institute of Industrial Engineers). 26: 74-82. DOI: 10.1080/07408179408966640  0.345
1993 Duenyas I, Hopp WJ, Spearman ML. Characterizing the Output Process of a CONWIP Line with Deterministic Processing and Random Outages Management Science. 39: 975-988. DOI: 10.1287/Mnsc.39.8.975  0.711
1993 Hopp WJ, Spearman ML, Duenyas I. ECONOMIC PRODUCTION QUOTAS FOR PULL MANUFACTURING SYSTEMS Iie Transactions (Institute of Industrial Engineers). 25: 71-79. DOI: 10.1080/07408179308964279  0.745
1993 Hopp WJ, Spearman ML. Setting Safety Leadtimes for Purchased Components in Assembly Systems Iie Transactions (Institute of Industrial Engineers). 25: 2-11. DOI: 10.1080/07408179308964272  0.725
1993 Hopp WJ, Simon JT. Estimating throughput in an unbalanced assembly-like flow system International Journal of Production Research. 31: 851-868. DOI: 10.1080/00207549308956762  0.314
1993 Duenyas I, Hopp WJ. Estimating the throughput of an exponential CONWIP assembly system Queueing Systems. 14: 135-157. DOI: 10.1007/Bf01153531  0.367
1992 Bean JC, Hopp WJ, Duenyas I. A stopping rule for forecast horizons in nonhomogeneous Markov decision processes Operations Research. 40: 1188-1199. DOI: 10.1287/Opre.40.6.1188  0.638
1992 Duenyas I, Hopp WJ. Conwip Assembly with Deterministic Processing and Random Outages Iie Transactions (Institute of Industrial Engineers). 24: 97-109. DOI: 10.1080/07408179208964237  0.386
1992 Jones PC, Hopp WJ, Zydiak JL. Capital asset valuation and depreciation for stochastically deteriorating equipment Engineering Economist. 38: 19-30. DOI: 10.1080/00137919208903084  0.331
1992 Nair SK, Hopp WJ. A model for equipment replacement due to technological obsolescence European Journal of Operational Research. 63: 207-221. DOI: 10.1016/0377-2217(92)90026-6  0.326
1992 Daskin MS, Hopp WJ, Medina B. Forecast horizons and dynamic facility location planning Annals of Operations Research. 40: 125-151. DOI: 10.1007/Bf02060473  0.38
1991 Simon JT, Hopp WJ. Availability and average inventory of balanced assembly-like flow systems Iie Transactions (Institute of Industrial Engineers). 23: 161-168. DOI: 10.1080/07408179108963851  0.345
1991 Hopp WJ, Spearman ML. Throughput of a constant work in process manufacturing line subject to failures International Journal of Production Research. 29: 635-655. DOI: 10.1080/00207549108930093  0.721
1991 Jones PC, Zydiak JL, Hopp WJ. Parallel machine replacement Naval Research Logistics. 38: 351-365. DOI: 10.1002/1520-6750(199106)38:3<351::Aid-Nav3220380306>3.0.Co;2-U  0.364
1991 Hopp WJ, Nair SK. Timing replacement decisions under discontinuous technological change Naval Research Logistics. 38: 203-220. DOI: 10.1002/1520-6750(199104)38:2<203::Aid-Nav3220380207>3.0.Co;2-E  0.314
1990 Hopp WJ, Wu SC. Machine maintenance with multiple maintenance actions Iie Transactions (Institute of Industrial Engineers). 22: 226-233. DOI: 10.1080/07408179008964177  0.361
1990 Spearman ML, Woodruff DL, Hopp WJ. CONWIP: A pull alternative to kanban International Journal of Production Research. 28: 879-894. DOI: 10.1080/00207549008942761  0.678
1990 Jones PC, Hopp WJ, Zydiak JL. Generalized imputed salvage values Engineering Economist. 35: 215-229. DOI: 10.1080/00137919008903018  0.333
1990 Jones PC, Zydiak JL, Hopp WJ. Stable economic depreciation Operations Research Letters. 9: 325-333. DOI: 10.1016/0167-6377(90)90027-3  0.404
1990 Duenyas I, Hopp WJ. Estimating variance of output from cyclic exponential queueing systems Queueing Systems. 7: 337-353. DOI: 10.1007/Bf01154550  0.382
1989 Hopp WJ. Technical Note—Identifying Forecast Horizons in Nonhomogeneous Markov Decision Processes Operations Research. 37: 339-343. DOI: 10.1287/Opre.37.2.339  0.373
1989 Hopp WJ, Pati N, Jones PC. Optimal inventory control in a production flow system with failures International Journal of Production Research. 27: 1367-1384. DOI: 10.1080/00207548908942628  0.357
1989 Jones PC, Zydiak JL, Hopp WJ. Stable economic depreciation neutral replacement decisions Engineering Economist. 34: 115-128. DOI: 10.1080/00137918908902981  0.347
1989 Hopp WJ, Simon JT. Bounds and heuristics for assembly-like queues Queueing Systems. 4: 137-155. DOI: 10.1007/Bf01158549  0.358
1988 Jones PC, Zydiak JL, Hopp WJ. Stationary dual prices and depreciation Mathematical Programming. 41: 357-366. DOI: 10.1007/Bf01580773  0.364
1988 Hopp WJ. Sensitivity analysis in discrete dynamic programming Journal of Optimization Theory and Applications. 56: 257-269. DOI: 10.1007/Bf00939411  0.379
1988 Hopp WJ, Wu S. Multiaction maintenance under markovian deterioration and incomplete state information Naval Research Logistics. 35: 447-462. DOI: 10.1002/1520-6750(198810)35:5<447::Aid-Nav3220350509>3.0.Co;2-I  0.39
1987 Hopp WJ, Bean JC, Smith RL. A New Optimality Criterion for Nonhomogeneous Markov Decision Processes Operations Research. 35: 875-883. DOI: 10.1287/Opre.35.6.875  0.686
1987 Hopp WJ. A Sequential Model of R&D Investment Over an Unbounded Time Horizon Management Science. 33: 500-508. DOI: 10.1287/Mnsc.33.4.500  0.311
Show low-probability matches.