Year |
Citation |
Score |
2018 |
Saghafian S, Hopp WJ, Iravani SMR, Cheng Y, Diermeier D. Workload Management in Telemedical Physician Triage and Other Knowledge-Based Service Systems Management Science. 64: 5180-5197. DOI: 10.1287/Mnsc.2017.2905 |
0.387 |
|
2018 |
Hopp WJ. Positive lean: merging the science of efficiency with the psychology of work International Journal of Production Research. 56: 398-413. DOI: 10.1080/00207543.2017.1387301 |
0.332 |
|
2013 |
Gokpinar B, Hopp WJ, Iravani SMR. In-house globalization: The role of globally distributed design and product architecture on product development performance Production and Operations Management. 22: 1509-1523. DOI: 10.1111/Poms.12079 |
0.763 |
|
2011 |
Ebrahim-Khanjari N, Hopp W, Iravani SMR. Trust and Information Sharing in Supply Chains Production and Operations Management. 21: 444-464. DOI: 10.1111/J.1937-5956.2011.01284.X |
0.37 |
|
2010 |
Hopp WJ, Iravani SMR, Xu WL. Vertical flexibility in supply chains Management Science. 56: 495-502. DOI: 10.1287/Mnsc.1090.1127 |
0.338 |
|
2010 |
Gokpinar B, Hopp WJ, Iravani SMR. The impact of misalignment of organizational structure and product architecture on quality in complex product development Management Science. 56: 468-484. DOI: 10.1287/Mnsc.1090.1117 |
0.766 |
|
2009 |
Xu X, Hopp WJ. Price trends in a dynamic pricing model with heterogeneous customers: A martingale perspective Operations Research. 57: 1298-1302. DOI: 10.1287/Opre.1090.0703 |
0.371 |
|
2009 |
Hopp WJ, Iravani SMR, Liu F. Managing white-collar work: An operations-oriented survey Production and Operations Management. 18: 1-32. DOI: 10.1111/J.1937-5956.2009.01002.X |
0.302 |
|
2009 |
Tekin E, Hopp WJ, Van Oyen MP. Pooling strategies for call center agent cross-training Iie Transactions (Institute of Industrial Engineers). 41: 546-561. DOI: 10.1080/07408170802512586 |
0.582 |
|
2009 |
Hopp WJ, Iravani SMR, Shou B, Lien R. Design and control of agile automated CONWIP production lines Naval Research Logistics. 56: 42-56. DOI: 10.1002/Nav.20325 |
0.385 |
|
2008 |
Hopp WJ, Xu X. A static approximation for dynamic demand substitution with applications in a competitive market Operations Research. 56: 630-645. DOI: 10.1287/Opre.1080.0541 |
0.378 |
|
2008 |
Chayet S, Hopp WJ. Risk-sensitive sizing of responsive facilities Naval Research Logistics. 55: 218-233. DOI: 10.1002/Nav.20278 |
0.389 |
|
2007 |
Hopp WJ, Iravani SMR, Shou B. A Diagnostic Tree for Improving Production Line Performance Production and Operations Management. 16: 77-92. DOI: 10.1111/J.1937-5956.2007.Tb00167.X |
0.325 |
|
2007 |
Gel ES, Hopp WJ, Van Oyen MP. Hierarchical cross-training in Work-In-Process-constrained systems Iie Transactions (Institute of Industrial Engineers). 39: 125-143. DOI: 10.1080/07408170600729184 |
0.38 |
|
2006 |
Xu X, Hopp WJ. A monopolistic and oligopolistic stochastic flow revenue management model Operations Research. 54: 1098-1109. DOI: 10.1287/Opre.1060.0336 |
0.356 |
|
2006 |
Yuen G, Hopp WJ, Iravani SMR. Operations systems with discretionary task completion Manufacturing and Service Operations Management. 8: 114-117. DOI: 10.1287/Mnsc.1060.0598 |
0.311 |
|
2006 |
Diermeier D, Hopp WJ, Iravani S. Innovating under Pressure: Towards a Science of Crisis Management Innovation Policy and the Economy. 7: 125-154. DOI: 10.1086/Ipe.7.25056192 |
0.343 |
|
2005 |
Hopp WJ, Iravani SMR, Shou B. Serial agile production systems with automation Operations Research. 53: 852-866. DOI: 10.1287/Opre.1050.0226 |
0.425 |
|
2005 |
Hopp WJ, Xu X. Product line selection and pricing with modularity in design Manufacturing and Service Operations Management. 7: 172-187. DOI: 10.1287/Msom.1050.0077 |
0.419 |
|
2004 |
Hopp WJ, Spearman ML. To pull or not to pull: What is the question? Manufacturing and Service Operations Management. 6: 133-148. DOI: 10.1287/Msom.1030.0028 |
0.7 |
|
2004 |
Hopp WJ, Tekin E, Van Oyen MP. Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers Management Science. 50: 83-98. DOI: 10.1287/Mnsc.1030.0166 |
0.611 |
|
2004 |
Hopp WJ, Van Oyen MP. Agile workforce evaluation: A framework for cross-training and coordination Iie Transactions (Institute of Industrial Engineers). 36: 919-940. DOI: 10.1080/07408170490487759 |
0.353 |
|
2002 |
Tekin E, Hopp WJ, Van Oyen MP. Benefits of Skill Chaining in Production Lines with Cross-Trained Workers: An Extended Abstract Manufacturing & Service Operations Management. 4: 17-20. DOI: 10.1287/Msom.4.1.17.293 |
0.556 |
|
2002 |
Gel ES, Hopp WJ, Van Oyen MP. Factors affecting opportunity of worksharing as a dynamic line balancing mechanism Iie Transactions (Institute of Industrial Engineers). 34: 847-863. DOI: 10.1080/07408170208928917 |
0.393 |
|
2002 |
Hopp WJ, Spearman ML, Chayet S, Donohue KL, Gel ES. Using an optimized queueing network model to support wafer fab design Iie Transactions (Institute of Industrial Engineers). 34: 119-130. DOI: 10.1080/07408170208928855 |
0.726 |
|
2002 |
Donohue KL, Hopp WJ, Spearman ML. Optimal design of stochastic production lines: A dynamic programming approach Iie Transactions (Institute of Industrial Engineers). 34: 891-903. DOI: 10.1023/A:1015736926725 |
0.736 |
|
2002 |
Bassok Y, Hopp WJ, Rohatgi M. A simple linear heuristic for the service constrained random yield problem Iie Transactions (Institute of Industrial Engineers). 34: 479-487. DOI: 10.1023/A:1013523421387 |
0.464 |
|
2001 |
Hopp WJ, Sturgis MR. A Simple, Robust Leadtime-Quoting Policy Manufacturing and Service Operations Management. 3: 321-336. DOI: 10.1287/Msom.3.4.321.9968 |
0.432 |
|
2001 |
Hegedus MG, Hopp WJ. Setting procurement safety lead-times for assembly systems International Journal of Production Research. 39: 3459-3478. DOI: 10.1080/00207540110061625 |
0.747 |
|
2001 |
Van Oyen MP, Gel EGS, Hopp WJ. Performance opportunity for workforce agility in collaborative and noncollaborative work systems Iie Transactions (Institute of Industrial Engineers). 33: 761-777. DOI: 10.1023/A:1010997816249 |
0.43 |
|
2001 |
Zhang RQ, Hopp WJ, Supatgiat C. Spreadsheet implementable inventory control for a distribution center Journal of Heuristics. 7: 185-203. DOI: 10.1023/A:1009613921001 |
0.595 |
|
2001 |
Hegedus MG, Hopp WJ. Due date setting with supply constraints in systems using MRP Computers and Industrial Engineering. 39: 293-305. DOI: 10.1016/S0360-8352(01)00007-9 |
0.757 |
|
2000 |
Hopp WJ, Roof Sturgis ML. Quoting manufacturing due dates subject to a service level constraint Iie Transactions (Institute of Industrial Engineers). 32: 771-784. DOI: 10.1080/07408170008967437 |
0.397 |
|
1999 |
Hopp WJ, Zhang RQ, Spearman ML. An easily implementable hierarchical heuristic for a two-echelon spare parts distribution system Iie Transactions (Institute of Industrial Engineers). 31: 977-988. DOI: 10.1080/07408179908969898 |
0.748 |
|
1998 |
Spearman ML, Hopp WJ. Teaching operations management from a science of manufacturing Production and Operations Management. 7: 132-145. DOI: 10.1111/J.1937-5956.1998.Tb00445.X |
0.695 |
|
1998 |
Hopp WJ, Roof ML. Setting WIP levels with statistical throughput control (STC) in CONWIP production lines International Journal of Production Research. 36: 867-882. DOI: 10.1080/002075498193435 |
0.423 |
|
1998 |
Hopp WJ, Kuo YL. Heuristics for multicomponent joint replacement: Applications to aircraft engine maintenance Naval Research Logistics. 45: 435-458. DOI: 10.1002/(Sici)1520-6750(199808)45:5<435::Aid-Nav1>3.0.Co;2-4 |
0.384 |
|
1998 |
Hopp WJ, Kuo YL. An optimal structured policy for maintenance of partially observable aircraft engine components Naval Research Logistics. 45: 335-352. DOI: 10.1002/(Sici)1520-6750(199806)45:4<335::Aid-Nav1>3.0.Co;2-6 |
0.363 |
|
1997 |
Hopp WJ, Spearman ML, Zhang RQ. Easily implementable inventory control policies Operations Research. 45: 327-340. DOI: 10.1287/Opre.45.3.327 |
0.77 |
|
1997 |
Duenyas I, Hopp WJ, Bassok Y. Production quotas as bounds on interplant JIT contracts Management Science. 43: 1372-1386. DOI: 10.1287/Mnsc.43.10.1372 |
0.461 |
|
1995 |
Duenyas I, Hopp WJ. Quoting Customer Lead Times Management Science. 41: 43-57. DOI: 10.1287/Mnsc.41.1.43 |
0.441 |
|
1995 |
Simon JT, Hopp WJ. Throughput and average inventory in discrete balanced assembly systems Iie Transactions (Institute of Industrial Engineers). 27: 368-373. DOI: 10.1080/07408179508936752 |
0.327 |
|
1994 |
Hopp WJ, Nair SK. Markovian deterioration and technological change Iie Transactions (Institute of Industrial Engineers). 26: 74-82. DOI: 10.1080/07408179408966640 |
0.345 |
|
1993 |
Duenyas I, Hopp WJ, Spearman ML. Characterizing the Output Process of a CONWIP Line with Deterministic Processing and Random Outages Management Science. 39: 975-988. DOI: 10.1287/Mnsc.39.8.975 |
0.711 |
|
1993 |
Hopp WJ, Spearman ML, Duenyas I. ECONOMIC PRODUCTION QUOTAS FOR PULL MANUFACTURING SYSTEMS Iie Transactions (Institute of Industrial Engineers). 25: 71-79. DOI: 10.1080/07408179308964279 |
0.745 |
|
1993 |
Hopp WJ, Spearman ML. Setting Safety Leadtimes for Purchased Components in Assembly Systems Iie Transactions (Institute of Industrial Engineers). 25: 2-11. DOI: 10.1080/07408179308964272 |
0.725 |
|
1993 |
Hopp WJ, Simon JT. Estimating throughput in an unbalanced assembly-like flow system International Journal of Production Research. 31: 851-868. DOI: 10.1080/00207549308956762 |
0.314 |
|
1993 |
Duenyas I, Hopp WJ. Estimating the throughput of an exponential CONWIP assembly system Queueing Systems. 14: 135-157. DOI: 10.1007/Bf01153531 |
0.367 |
|
1992 |
Bean JC, Hopp WJ, Duenyas I. A stopping rule for forecast horizons in nonhomogeneous Markov decision processes Operations Research. 40: 1188-1199. DOI: 10.1287/Opre.40.6.1188 |
0.638 |
|
1992 |
Duenyas I, Hopp WJ. Conwip Assembly with Deterministic Processing and Random Outages Iie Transactions (Institute of Industrial Engineers). 24: 97-109. DOI: 10.1080/07408179208964237 |
0.386 |
|
1992 |
Jones PC, Hopp WJ, Zydiak JL. Capital asset valuation and depreciation for stochastically deteriorating equipment Engineering Economist. 38: 19-30. DOI: 10.1080/00137919208903084 |
0.331 |
|
1992 |
Nair SK, Hopp WJ. A model for equipment replacement due to technological obsolescence European Journal of Operational Research. 63: 207-221. DOI: 10.1016/0377-2217(92)90026-6 |
0.326 |
|
1992 |
Daskin MS, Hopp WJ, Medina B. Forecast horizons and dynamic facility location planning Annals of Operations Research. 40: 125-151. DOI: 10.1007/Bf02060473 |
0.38 |
|
1991 |
Simon JT, Hopp WJ. Availability and average inventory of balanced assembly-like flow systems Iie Transactions (Institute of Industrial Engineers). 23: 161-168. DOI: 10.1080/07408179108963851 |
0.345 |
|
1991 |
Hopp WJ, Spearman ML. Throughput of a constant work in process manufacturing line subject to failures International Journal of Production Research. 29: 635-655. DOI: 10.1080/00207549108930093 |
0.721 |
|
1991 |
Jones PC, Zydiak JL, Hopp WJ. Parallel machine replacement Naval Research Logistics. 38: 351-365. DOI: 10.1002/1520-6750(199106)38:3<351::Aid-Nav3220380306>3.0.Co;2-U |
0.364 |
|
1991 |
Hopp WJ, Nair SK. Timing replacement decisions under discontinuous technological change Naval Research Logistics. 38: 203-220. DOI: 10.1002/1520-6750(199104)38:2<203::Aid-Nav3220380207>3.0.Co;2-E |
0.314 |
|
1990 |
Hopp WJ, Wu SC. Machine maintenance with multiple maintenance actions Iie Transactions (Institute of Industrial Engineers). 22: 226-233. DOI: 10.1080/07408179008964177 |
0.361 |
|
1990 |
Spearman ML, Woodruff DL, Hopp WJ. CONWIP: A pull alternative to kanban International Journal of Production Research. 28: 879-894. DOI: 10.1080/00207549008942761 |
0.678 |
|
1990 |
Jones PC, Hopp WJ, Zydiak JL. Generalized imputed salvage values Engineering Economist. 35: 215-229. DOI: 10.1080/00137919008903018 |
0.333 |
|
1990 |
Jones PC, Zydiak JL, Hopp WJ. Stable economic depreciation Operations Research Letters. 9: 325-333. DOI: 10.1016/0167-6377(90)90027-3 |
0.404 |
|
1990 |
Duenyas I, Hopp WJ. Estimating variance of output from cyclic exponential queueing systems Queueing Systems. 7: 337-353. DOI: 10.1007/Bf01154550 |
0.382 |
|
1989 |
Hopp WJ. Technical Note—Identifying Forecast Horizons in Nonhomogeneous Markov Decision Processes Operations Research. 37: 339-343. DOI: 10.1287/Opre.37.2.339 |
0.373 |
|
1989 |
Hopp WJ, Pati N, Jones PC. Optimal inventory control in a production flow system with failures International Journal of Production Research. 27: 1367-1384. DOI: 10.1080/00207548908942628 |
0.357 |
|
1989 |
Jones PC, Zydiak JL, Hopp WJ. Stable economic depreciation neutral replacement decisions Engineering Economist. 34: 115-128. DOI: 10.1080/00137918908902981 |
0.347 |
|
1989 |
Hopp WJ, Simon JT. Bounds and heuristics for assembly-like queues Queueing Systems. 4: 137-155. DOI: 10.1007/Bf01158549 |
0.358 |
|
1988 |
Jones PC, Zydiak JL, Hopp WJ. Stationary dual prices and depreciation Mathematical Programming. 41: 357-366. DOI: 10.1007/Bf01580773 |
0.364 |
|
1988 |
Hopp WJ. Sensitivity analysis in discrete dynamic programming Journal of Optimization Theory and Applications. 56: 257-269. DOI: 10.1007/Bf00939411 |
0.379 |
|
1988 |
Hopp WJ, Wu S. Multiaction maintenance under markovian deterioration and incomplete state information Naval Research Logistics. 35: 447-462. DOI: 10.1002/1520-6750(198810)35:5<447::Aid-Nav3220350509>3.0.Co;2-I |
0.39 |
|
1987 |
Hopp WJ, Bean JC, Smith RL. A New Optimality Criterion for Nonhomogeneous Markov Decision Processes Operations Research. 35: 875-883. DOI: 10.1287/Opre.35.6.875 |
0.686 |
|
1987 |
Hopp WJ. A Sequential Model of R&D Investment Over an Unbounded Time Horizon Management Science. 33: 500-508. DOI: 10.1287/Mnsc.33.4.500 |
0.311 |
|
Show low-probability matches. |