Grisselle Centeno - Publications

Affiliations: 
Industrial and Management Systems Engineering University of South Florida, Tampa, FL, United States 
Area:
Operations Research

13 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2016 Gunpinar S, Centeno G. An integer programming approach to the bloodmobile routing problem Transportation Research Part E: Logistics and Transportation Review. 86: 94-115. DOI: 10.1016/J.Tre.2015.12.005  0.681
2015 Gunpinar S, Centeno G. Stochastic integer programming models for reducing wastages and shortages of blood products at hospitals Computers and Operations Research. 54: 129-141. DOI: 10.1016/J.Cor.2014.08.017  0.659
2013 Kuznia L, Zeng B, Centeno G, Miao Z. Stochastic optimization for power system configuration with renewable energy in remote areas Annals of Operations Research. 210: 411-432. DOI: 10.1007/S10479-012-1110-9  0.592
2012 Otero LD, Centeno G, Otero CE, Ruiz-Torres AJ. A fuzzy goal programming model for skill-based personnel assignments International Journal of Multicriteria Decision Making. 2: 313-337. DOI: 10.1504/Ijmcdm.2012.050675  0.37
2011 Centeno G, Kuznia L, Rico F. Constructivist case-based learning in work analysis and design course 61st Annual Iie Conference and Expo Proceedings 0.576
2009 Otero LD, Centeno G, Ruiz-Torres AJ, Otero CE. A systematic approach for resource allocation in software projects Computers and Industrial Engineering. 56: 1333-1339. DOI: 10.1016/J.Cie.2008.08.002  0.346
2008 Ruiz-Torres AJ, Centeno G. Minimizing the number of late jobs for the permutation flowshop problem with secondary resources Computers and Operations Research. 35: 1227-1249. DOI: 10.1016/J.Cor.2006.07.013  0.4
2007 Ruiz-Torres AJ, Centeno G. Scheduling with flexible resources in parallel workcenters to minimize maximum completion time Computers and Operations Research. 34: 48-69. DOI: 10.1016/J.Cor.2005.02.042  0.392
2006 Lopez P, Centeno G. Integrated system to maximize efficiency in transit maintenance departments International Journal of Productivity and Performance Management. 55: 638-654. DOI: 10.1108/17410400610710189  0.371
2005 Centeno G, Chaudhary R, Lopez P. Developing standard times for repair activities for transit vehicles a systematic approach Transportation Research Record. 112-122. DOI: 10.3141/1927-13  0.348
2004 Zekri S, Clayton L, Ferguson E, Okogbaa G, Kumar A, Das T, Centeno G, Martin-Vega L. An Impact Study of the Implementation of a Materials Science and Engineering Module at the Fifth Grade Level Mrs Proceedings. 827. DOI: 10.1557/Proc-827-Bb3.3  0.327
2004 Labrador MA, Wolan J, Centeno G, Kumar A, Schlaf R. A research initiative to close the gap between undergraduate and graduate school in engineering Proceedings - Frontiers in Education Conference, Fie. 3: S1B-1-S1B-5. DOI: 10.1109/Fie.2004.1408674  0.323
2004 Centeno G, Clayton L, Otero LD, Zekri S. Innovative modules to introduce advance science and engineering concepts Proceedings - Frontiers in Education Conference, Fie. 2. DOI: 10.1109/Fie.2004.1408626  0.357
Show low-probability matches.