Year |
Citation |
Score |
2014 |
Leachman RC, Johnston L, Li S, Shen ZJ. An automated planning engine for biopharmaceutical production European Journal of Operational Research. 238: 327-338. DOI: 10.1016/J.Ejor.2014.03.002 |
0.416 |
|
2013 |
Guerrero SE, Madanat SM, Leachman RC. The Trucking Sector Optimization Model: A tool for predicting carrier and shipper responses to policies aiming to reduce GHG emissions Transportation Research Part E: Logistics and Transportation Review. 59: 85-107. DOI: 10.1016/J.Tre.2013.08.005 |
0.348 |
|
2012 |
Davidson ET, Leachman RC. Optimizing a Multi-strategy Port and Modal Allocation of Containerized Imports From Asia to the United States Journal of Marketing Channels. 19: 120-140. DOI: 10.1080/1046669X.2012.667762 |
0.731 |
|
2012 |
Leachman RC, Jula P. Estimating flow times for containerized imports from Asia to the United States through the Western rail network Transportation Research Part E: Logistics and Transportation Review. 48: 296-309. DOI: 10.1016/J.Tre.2011.07.002 |
0.708 |
|
2011 |
Leachman RC, Jula P. Congestion analysis of waterborne, containerized imports from asia to the united states Transportation Research Part E: Logistics and Transportation Review. 47: 992-1004. DOI: 10.1016/J.Tre.2011.05.010 |
0.726 |
|
2011 |
Jula P, Leachman RC. A supply-chain optimization model of the allocation of containerized imports from Asia to the United States Transportation Research Part E: Logistics and Transportation Review. 47: 609-622. DOI: 10.1016/J.Tre.2011.02.007 |
0.745 |
|
2011 |
Jula P, Leachman RC. Long- and Short-Run supply-chain optimization models for the allocation and congestion management of containerized imports from Asia to the United States Transportation Research Part E: Logistics and Transportation Review. 47: 593-608. DOI: 10.1016/J.Tre.2011.02.006 |
0.751 |
|
2010 |
Jula P, Leachman RC. Coordinated multistage scheduling of parallel batch-processing machines under multiresource constraints Operations Research. 58: 933-947. DOI: 10.1287/Opre.1090.0788 |
0.719 |
|
2010 |
Berglund CN, Leachman RC. The potential for economic application of maskless lithography in semiconductor manufacturing Ieee Transactions On Semiconductor Manufacturing. 23: 39-52. DOI: 10.1109/Tsm.2009.2039247 |
0.353 |
|
2008 |
Leachman RC. Port and modal allocation of waterborne containerized imports from Asia to the United States Transportation Research Part E: Logistics and Transportation Review. 44: 313-331. DOI: 10.1016/J.Tre.2007.07.008 |
0.426 |
|
2008 |
Jula P, Leachman RC. Coordinating decentralized local schedulers in complex supply chain manufacturing Annals of Operations Research. 161: 123-147. DOI: 10.1007/S10479-006-0148-Y |
0.721 |
|
2007 |
Leachman RC, Ding S. Integration of speed economics into decision-making for manufacturing management International Journal of Production Economics. 107: 39-55. DOI: 10.1016/J.Ijpe.2006.08.012 |
0.379 |
|
2006 |
Dessouky MM, Lu Q, Zhao J, Leachman RC. An exact solution procedure to determine the optimal dispatching times for complex rail networks Iie Transactions (Institute of Industrial Engineers). 38: 141-152. DOI: 10.1080/074081791008988 |
0.565 |
|
2005 |
Ding S, Leachman RC. Impact of price decline on planning and scheduling Ieee International Symposium On Semiconductor Manufacturing Conference Proceedings. 67-70. |
0.324 |
|
2004 |
Lu Q, Dessouky M, Leachman RC. Modeling train movements through complex rail networks Acm Transactions On Modeling and Computer Simulation. 14: 48-75. DOI: 10.1145/974734.974737 |
0.634 |
|
2003 |
Shen Y, Leachman RC. Stochastic wafer fabrication scheduling Ieee Transactions On Semiconductor Manufacturing. 16: 2-13. DOI: 10.1109/TSM.2002.807743 |
0.353 |
|
2002 |
Leachman RC, Kang J, Lin V. SLIM: Short cycle time and low inventory in manufacturing at Samsung electronics Interfaces. 32: 61-77. DOI: 10.1287/Inte.32.1.61.15 |
0.383 |
|
2002 |
Jula P, Spanos CJ, Leachman RC. Comparing the economic impact of alternative metrology methods in semiconductor manufacturing Ieee Transactions On Semiconductor Manufacturing. 15: 454-463. DOI: 10.1109/TSM.2002.804909 |
0.719 |
|
2002 |
Dessouky MM, Lu Q, Leachman RC. Using simulation modeling to assess rail track infrastructure in densely trafficked metropolitan areas Winter Simulation Conference Proceedings. 1: 725-731. |
0.555 |
|
2001 |
Spanos CJ, Jula P, Leachman RC. The economic impact of choosing off-line, inline or insitu metrology deployment in semiconductor manufacturing Ieee International Symposium On Semiconductor Manufacturing Conference, Proceedings. 37-40. |
0.709 |
|
1998 |
Gonçalves JF, Leachman RC. A hybrid heuristic and linear programming approach to multi-product machine scheduling European Journal of Operational Research. 110: 548-563. DOI: 10.1016/S0377-2217(97)00153-7 |
0.458 |
|
1997 |
Leachman RC. Closed-loop measurement of equipment efficiency and equipment capacity Ieee Transactions On Semiconductor Manufacturing. 10: 84-97. DOI: 10.1109/66.554490 |
0.347 |
|
1997 |
Dessouky MM, Leachman RC. Dynamic models of production with multiple operations and general processing times Journal of the Operational Research Society. 48: 647-654. DOI: 10.1057/Palgrave.Jors.2600406 |
0.63 |
|
1996 |
Leachman RC, Benson RF, Liu C, Raar DJ. IMPReSS: An automated production-planning and delivery-quotation system at Harris corporation - Semiconductor sector Interfaces. 26: 6-37. DOI: 10.1287/Inte.26.1.6 |
0.42 |
|
1996 |
Leachman RC, Hodges DA. Benchmarking semiconductor manufacturing Ieee Transactions On Semiconductor Manufacturing. 9: 158-169. DOI: 10.1109/66.492810 |
0.323 |
|
1996 |
Kim J, Leachman RC, Suh B. Dynamic release control policy for the semiconductor wafer fabrication lines Journal of the Operational Research Society. 47: 1516-1525. DOI: 10.1057/Jors.1996.195 |
0.318 |
|
1995 |
BENSON RF, CUNNINGHAM SP, LEACHMAN RC. BENCHMARKING MANUFACTURING PERFORMANCE IN THE SEMICONDUCTOR INDUSTRY Production and Operations Management. 4: 201-216. DOI: 10.1111/J.1937-5956.1995.Tb00052.X |
0.312 |
|
1995 |
Gascon A, Lefrancois P, Leachman RC. A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem International Journal of Production Research. 33: 869-873. DOI: 10.1080/00207549508930183 |
0.353 |
|
1994 |
DESSOUKY MM, LEACHMAN RC. AN OPTIMIZATION‐BASED METHODOLOGY FOR RELEASE SCHEDULING Production and Operations Management. 3: 276-295. DOI: 10.1111/J.1937-5956.1994.Tb00125.X |
0.565 |
|
1994 |
Gascon A, Lefrançois P, Leachman RC. Multi-item, single-machine scheduling problem with stochastic demands: A comparison of heuristics International Journal of Production Research. 32: 583-596. DOI: 10.1080/00207549408956954 |
0.388 |
|
1994 |
Ciriani TA, Leachman RC. Optimization in industry 2: Mathematical programming and modeling techniques in practice Journal of the Operational Research Society. 45: 795-796. DOI: 10.1057/Jors.1994.89 |
0.457 |
|
1994 |
Kim JS, Leachman RC. Decomposition method application to a large scale linear programming WIP projection model European Journal of Operational Research. 74: 152-160. DOI: 10.1016/0377-2217(94)90213-5 |
0.386 |
|
1993 |
Kim SY, Leachman RC. Multi-Project Scheduling with Explicit Lateness Costs Iie Transactions (Institute of Industrial Engineers). 25: 34-44. DOI: 10.1080/07408179308964275 |
0.341 |
|
1993 |
Leachman RC, Gascon A, Gascon ZK. Multi-item single-machine scheduling with material supply constraints Journal of the Operational Research Society. 44: 1145-1154. DOI: 10.1057/Jors.1993.186 |
0.435 |
|
1993 |
Leachman RC, Kim S. A revised critical path method for networks including both overlap relationships and variable-duration activities European Journal of Operational Research. 64: 229-248. DOI: 10.1016/0377-2217(93)90179-Q |
0.337 |
|
1992 |
Leachman RC, Carmon TF. On Capacity Modeling for Production Planning with Alternative Machine Types Iie Transactions (Institute of Industrial Engineers). 24: 62-72. DOI: 10.1080/07408179208964234 |
0.435 |
|
1991 |
Leachman RC, Xiong ZK, Gascon A, Park K. Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine Management Science. 37: 1201-1205. DOI: 10.1287/Mnsc.37.9.1201 |
0.383 |
|
1989 |
Hackman ST, Leachman RC. A general framework for modeling production Management Science. 35: 478-495. DOI: 10.1287/Mnsc.35.4.478 |
0.437 |
|
1988 |
Gascon A, Leachman RC. A dynamic programming solution to the dynamic, multi-item, single-machine scheduling Operations Research. 36: 50-56. DOI: 10.1287/Opre.36.1.50 |
0.457 |
|
1988 |
Gonçalves JF, Leachman RC, Gascon A, Xiong ZK. A Heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands Management Science. 34: 1455-1468. DOI: 10.1287/Mnsc.40.11.1455 |
0.404 |
|
1983 |
Leachman RC. Multiple resource leveling in construction systems through variation of activity intensities Naval Research Logistics Quarterly. 30: 187-198. DOI: 10.1002/Nav.3800300202 |
0.382 |
|
1982 |
Leachman RC. Production planning for multi‐resource network systems Naval Research Logistics Quarterly. 29: 47-54. DOI: 10.1002/Nav.3800290105 |
0.384 |
|
Show low-probability matches. |