Robert C. Leachman - Publications

Affiliations: 
Industrial Engineering & Operations Research University of California, Berkeley, Berkeley, CA, United States 
Area:
Industrial Engineering, Operations Research
Website:
https://ieor.berkeley.edu/people/robert-leachman/

42 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2014 Leachman RC, Johnston L, Li S, Shen ZJ. An automated planning engine for biopharmaceutical production European Journal of Operational Research. 238: 327-338. DOI: 10.1016/J.Ejor.2014.03.002  0.416
2013 Guerrero SE, Madanat SM, Leachman RC. The Trucking Sector Optimization Model: A tool for predicting carrier and shipper responses to policies aiming to reduce GHG emissions Transportation Research Part E: Logistics and Transportation Review. 59: 85-107. DOI: 10.1016/J.Tre.2013.08.005  0.348
2012 Davidson ET, Leachman RC. Optimizing a Multi-strategy Port and Modal Allocation of Containerized Imports From Asia to the United States Journal of Marketing Channels. 19: 120-140. DOI: 10.1080/1046669X.2012.667762  0.731
2012 Leachman RC, Jula P. Estimating flow times for containerized imports from Asia to the United States through the Western rail network Transportation Research Part E: Logistics and Transportation Review. 48: 296-309. DOI: 10.1016/J.Tre.2011.07.002  0.708
2011 Leachman RC, Jula P. Congestion analysis of waterborne, containerized imports from asia to the united states Transportation Research Part E: Logistics and Transportation Review. 47: 992-1004. DOI: 10.1016/J.Tre.2011.05.010  0.726
2011 Jula P, Leachman RC. A supply-chain optimization model of the allocation of containerized imports from Asia to the United States Transportation Research Part E: Logistics and Transportation Review. 47: 609-622. DOI: 10.1016/J.Tre.2011.02.007  0.745
2011 Jula P, Leachman RC. Long- and Short-Run supply-chain optimization models for the allocation and congestion management of containerized imports from Asia to the United States Transportation Research Part E: Logistics and Transportation Review. 47: 593-608. DOI: 10.1016/J.Tre.2011.02.006  0.751
2010 Jula P, Leachman RC. Coordinated multistage scheduling of parallel batch-processing machines under multiresource constraints Operations Research. 58: 933-947. DOI: 10.1287/Opre.1090.0788  0.719
2010 Berglund CN, Leachman RC. The potential for economic application of maskless lithography in semiconductor manufacturing Ieee Transactions On Semiconductor Manufacturing. 23: 39-52. DOI: 10.1109/Tsm.2009.2039247  0.353
2008 Leachman RC. Port and modal allocation of waterborne containerized imports from Asia to the United States Transportation Research Part E: Logistics and Transportation Review. 44: 313-331. DOI: 10.1016/J.Tre.2007.07.008  0.426
2008 Jula P, Leachman RC. Coordinating decentralized local schedulers in complex supply chain manufacturing Annals of Operations Research. 161: 123-147. DOI: 10.1007/S10479-006-0148-Y  0.721
2007 Leachman RC, Ding S. Integration of speed economics into decision-making for manufacturing management International Journal of Production Economics. 107: 39-55. DOI: 10.1016/J.Ijpe.2006.08.012  0.379
2006 Dessouky MM, Lu Q, Zhao J, Leachman RC. An exact solution procedure to determine the optimal dispatching times for complex rail networks Iie Transactions (Institute of Industrial Engineers). 38: 141-152. DOI: 10.1080/074081791008988  0.565
2005 Ding S, Leachman RC. Impact of price decline on planning and scheduling Ieee International Symposium On Semiconductor Manufacturing Conference Proceedings. 67-70.  0.324
2004 Lu Q, Dessouky M, Leachman RC. Modeling train movements through complex rail networks Acm Transactions On Modeling and Computer Simulation. 14: 48-75. DOI: 10.1145/974734.974737  0.634
2003 Shen Y, Leachman RC. Stochastic wafer fabrication scheduling Ieee Transactions On Semiconductor Manufacturing. 16: 2-13. DOI: 10.1109/TSM.2002.807743  0.353
2002 Leachman RC, Kang J, Lin V. SLIM: Short cycle time and low inventory in manufacturing at Samsung electronics Interfaces. 32: 61-77. DOI: 10.1287/Inte.32.1.61.15  0.383
2002 Jula P, Spanos CJ, Leachman RC. Comparing the economic impact of alternative metrology methods in semiconductor manufacturing Ieee Transactions On Semiconductor Manufacturing. 15: 454-463. DOI: 10.1109/TSM.2002.804909  0.719
2002 Dessouky MM, Lu Q, Leachman RC. Using simulation modeling to assess rail track infrastructure in densely trafficked metropolitan areas Winter Simulation Conference Proceedings. 1: 725-731.  0.555
2001 Spanos CJ, Jula P, Leachman RC. The economic impact of choosing off-line, inline or insitu metrology deployment in semiconductor manufacturing Ieee International Symposium On Semiconductor Manufacturing Conference, Proceedings. 37-40.  0.709
1998 Gonçalves JF, Leachman RC. A hybrid heuristic and linear programming approach to multi-product machine scheduling European Journal of Operational Research. 110: 548-563. DOI: 10.1016/S0377-2217(97)00153-7  0.458
1997 Leachman RC. Closed-loop measurement of equipment efficiency and equipment capacity Ieee Transactions On Semiconductor Manufacturing. 10: 84-97. DOI: 10.1109/66.554490  0.347
1997 Dessouky MM, Leachman RC. Dynamic models of production with multiple operations and general processing times Journal of the Operational Research Society. 48: 647-654. DOI: 10.1057/Palgrave.Jors.2600406  0.63
1996 Leachman RC, Benson RF, Liu C, Raar DJ. IMPReSS: An automated production-planning and delivery-quotation system at Harris corporation - Semiconductor sector Interfaces. 26: 6-37. DOI: 10.1287/Inte.26.1.6  0.42
1996 Leachman RC, Hodges DA. Benchmarking semiconductor manufacturing Ieee Transactions On Semiconductor Manufacturing. 9: 158-169. DOI: 10.1109/66.492810  0.323
1996 Kim J, Leachman RC, Suh B. Dynamic release control policy for the semiconductor wafer fabrication lines Journal of the Operational Research Society. 47: 1516-1525. DOI: 10.1057/Jors.1996.195  0.318
1995 BENSON RF, CUNNINGHAM SP, LEACHMAN RC. BENCHMARKING MANUFACTURING PERFORMANCE IN THE SEMICONDUCTOR INDUSTRY Production and Operations Management. 4: 201-216. DOI: 10.1111/J.1937-5956.1995.Tb00052.X  0.312
1995 Gascon A, Lefrancois P, Leachman RC. A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem International Journal of Production Research. 33: 869-873. DOI: 10.1080/00207549508930183  0.353
1994 DESSOUKY MM, LEACHMAN RC. AN OPTIMIZATION‐BASED METHODOLOGY FOR RELEASE SCHEDULING Production and Operations Management. 3: 276-295. DOI: 10.1111/J.1937-5956.1994.Tb00125.X  0.565
1994 Gascon A, Lefrançois P, Leachman RC. Multi-item, single-machine scheduling problem with stochastic demands: A comparison of heuristics International Journal of Production Research. 32: 583-596. DOI: 10.1080/00207549408956954  0.388
1994 Ciriani TA, Leachman RC. Optimization in industry 2: Mathematical programming and modeling techniques in practice Journal of the Operational Research Society. 45: 795-796. DOI: 10.1057/Jors.1994.89  0.457
1994 Kim JS, Leachman RC. Decomposition method application to a large scale linear programming WIP projection model European Journal of Operational Research. 74: 152-160. DOI: 10.1016/0377-2217(94)90213-5  0.386
1993 Kim SY, Leachman RC. Multi-Project Scheduling with Explicit Lateness Costs Iie Transactions (Institute of Industrial Engineers). 25: 34-44. DOI: 10.1080/07408179308964275  0.341
1993 Leachman RC, Gascon A, Gascon ZK. Multi-item single-machine scheduling with material supply constraints Journal of the Operational Research Society. 44: 1145-1154. DOI: 10.1057/Jors.1993.186  0.435
1993 Leachman RC, Kim S. A revised critical path method for networks including both overlap relationships and variable-duration activities European Journal of Operational Research. 64: 229-248. DOI: 10.1016/0377-2217(93)90179-Q  0.337
1992 Leachman RC, Carmon TF. On Capacity Modeling for Production Planning with Alternative Machine Types Iie Transactions (Institute of Industrial Engineers). 24: 62-72. DOI: 10.1080/07408179208964234  0.435
1991 Leachman RC, Xiong ZK, Gascon A, Park K. Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine Management Science. 37: 1201-1205. DOI: 10.1287/Mnsc.37.9.1201  0.383
1989 Hackman ST, Leachman RC. A general framework for modeling production Management Science. 35: 478-495. DOI: 10.1287/Mnsc.35.4.478  0.437
1988 Gascon A, Leachman RC. A dynamic programming solution to the dynamic, multi-item, single-machine scheduling Operations Research. 36: 50-56. DOI: 10.1287/Opre.36.1.50  0.457
1988 Gonçalves JF, Leachman RC, Gascon A, Xiong ZK. A Heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands Management Science. 34: 1455-1468. DOI: 10.1287/Mnsc.40.11.1455  0.404
1983 Leachman RC. Multiple resource leveling in construction systems through variation of activity intensities Naval Research Logistics Quarterly. 30: 187-198. DOI: 10.1002/Nav.3800300202  0.382
1982 Leachman RC. Production planning for multi‐resource network systems Naval Research Logistics Quarterly. 29: 47-54. DOI: 10.1002/Nav.3800290105  0.384
Show low-probability matches.