Year |
Citation |
Score |
2020 |
Yussef A, Gibson GE, Asmar ME, Ramsey D. Industry Survey for Determining the State of Practice of Front End Engineering Design for Industrial Construction Practice Periodical On Structural Design and Construction. 25: 4020025. DOI: 10.1061/(Asce)Sc.1943-5576.0000504 |
0.549 |
|
2020 |
Feghaly J, Asmar ME, Ariaratnam ST. State of Professional Practice for Water Infrastructure Project Delivery Practice Periodical On Structural Design and Construction. 25: 4020018. DOI: 10.1061/(Asce)Sc.1943-5576.0000500 |
0.575 |
|
2020 |
Papajohn D, Asmar ME. Percent Base Design and Initial Award Performance in Design-Build Highway Projects Journal of Management in Engineering. 36: 4020008. DOI: 10.1061/(Asce)Me.1943-5479.0000759 |
0.61 |
|
2020 |
Papajohn D, Asmar ME, Molenaar KR, Alleman D. Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects Journal of Management in Engineering. 36: 4019038. DOI: 10.1061/(Asce)Me.1943-5479.0000727 |
0.506 |
|
2020 |
Asmar ME, Ramsey D, Gibson GE, Bearup W. Design-Build for Transportation Projects: Cost and Schedule Change Performance Analysis Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 4519030. DOI: 10.1061/(Asce)La.1943-4170.0000335 |
0.677 |
|
2020 |
Ramsey D, Asmar ME. Cost and Schedule Performance Analysis of Transportation Public–Private Partnership Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 4519032. DOI: 10.1061/(Asce)La.1943-4170.0000328 |
0.507 |
|
2020 |
Azar E, O'Brien W, Carlucci S, Hong T, Sonta A, Kim J, Andargie MS, Abuimara T, Asmar ME, Jain RK, Ouf MM, Tahmasebi F, Zhou J. Simulation-aided occupant-centric building design: A critical review of tools, methods, and applications Energy and Buildings. 224: 110292. DOI: 10.1016/J.Enbuild.2020.110292 |
0.351 |
|
2020 |
Cho N, Asmar ME, Underwood S, Kamarianakis Y. Long-Term Performance Benefits of the Design-Build Delivery Method Applied to Road Pavement Projects in the U.S. Ksce Journal of Civil Engineering. 24: 1049-1059. DOI: 10.1007/S12205-020-1814-3 |
0.587 |
|
2019 |
Feghaly J, Asmar ME, Ariaratnam S, Bearup W. Selecting project delivery methods for water treatment plants Engineering, Construction and Architectural Management. 27: 936-951. DOI: 10.1108/Ecam-06-2019-0308 |
0.58 |
|
2019 |
Papajohn D, Asmar ME, Molenaar KR. Contract Administration Tools for Design-Build and Construction Manager/General Contractor Highway Projects Journal of Management in Engineering. 35: 4019028. DOI: 10.1061/(Asce)Me.1943-5479.0000718 |
0.458 |
|
2019 |
Yussef A, Gibson GE, Asmar ME, Ramsey D. Quantifying FEED Maturity and Its Impact on Project Performance in Large Industrial Projects Journal of Management in Engineering. 35: 4019021. DOI: 10.1061/(Asce)Me.1943-5479.0000702 |
0.624 |
|
2019 |
Sullivan JJ, Asmar ME, Sullivan KT. Consensus-Building Workshops to Uncover New Market Entry Decision Factors for the Sheet Metal Engineering and Construction Industry Journal of Management in Engineering. 35: 4019001. DOI: 10.1061/(Asce)Me.1943-5479.0000679 |
0.314 |
|
2019 |
Bingham E, Gibson GE, Asmar ME. Identifying Team Selection and Alignment Factors by Delivery Method for Transportation Projects Journal of Construction Engineering and Management-Asce. 145: 4019061. DOI: 10.1061/(Asce)Co.1943-7862.0001704 |
0.703 |
|
2018 |
Bingham E, Gibson GE, Asmar ME. Best Practices in Preconstruction Services for Transportation Projects Volume!. 8: 1-12. DOI: 10.25219/Epoj.2018.00100 |
0.679 |
|
2018 |
Burke RD, Parrish K, Asmar ME. Environmental Product Declarations: Use in the Architectural and Engineering Design Process to Support Sustainable Construction Journal of Construction Engineering and Management-Asce. 144: 4018026. DOI: 10.1061/(Asce)Co.1943-7862.0001481 |
0.317 |
|
2018 |
Bingham E, Gibson GE, Asmar ME. Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests Journal of Construction Engineering and Management-Asce. 144: 4018033. DOI: 10.1061/(Asce)Co.1943-7862.0001469 |
0.699 |
|
2017 |
Abkarian H, Asmar ME, Underwood S. Impact of Alternative Project Delivery Systems on the International Roughness Index: Case Studies of Transportation Projects in the Western United States Transportation Research Record. 2630: 76-84. DOI: 10.3141/2630-10 |
0.662 |
|
2017 |
Alleman D, Papajohn D, Gransberg DD, Asmar ME, Molenaar KR. Exploration of Early Work Packaging in Construction Manager–General Contractor Highway Projects Transportation Research Record. 2630: 68-75. DOI: 10.3141/2630-09 |
0.6 |
|
2017 |
Chokor A, Asmar ME, Paladugu BS. Quantifying the impact of cost-based incentives on the performance of building projects in the United States Practice Periodical On Structural Design and Construction. 22: 4016024. DOI: 10.1061/(Asce)Sc.1943-5576.0000312 |
0.481 |
|
2017 |
Francom T, Asmar ME, Ariaratnam ST. Longitudinal Study of Construction Manager at Risk for Pipeline Rehabilitation Journal of Pipeline Systems Engineering and Practice. 8: 4017001. DOI: 10.1061/(Asce)Ps.1949-1204.0000258 |
0.335 |
|
2017 |
Papajohn D, Brinker C, Asmar ME. MARS: Metaframework for Assessing Ratings of Sustainability for Buildings and Infrastructure Journal of Management in Engineering. 33: 4016026. DOI: 10.1061/(Asce)Me.1943-5479.0000478 |
0.333 |
|
2017 |
Asmar ME, Assainar R. Breaking with Tradition: Quantifying the Performance Impact of Nontraditional Stakeholder Involvement Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 9: 4517001. DOI: 10.1061/(Asce)La.1943-4170.0000211 |
0.506 |
|
2017 |
Sullivan J, Asmar ME, Chalhoub J, Obeid H. Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality Journal of Construction Engineering and Management-Asce. 143: 4017009. DOI: 10.1061/(Asce)Co.1943-7862.0001282 |
0.438 |
|
2016 |
Francom T, Ariaratnam ST, Asmar ME. Cost Performance of Job Order Contracting (JOC) Applied to Wastewater Pipeline Engineering and Construction Projects Pipelines 2016: Out of Sight, Out of Mind, Not Out of Risk - Proceedings of the Pipelines 2016 Conference. 64-70. DOI: 10.1061/9780784479957.007 |
0.512 |
|
2016 |
Bingham E, Asmar ME, Gibson GE. Project Delivery Method Selection: Analysis of User Perceptions on Transportation Projects Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, Crc 2016. 2110-2118. DOI: 10.1061/9780784479827.210 |
0.636 |
|
2016 |
Francom T, Asmar ME, Ariaratnam ST. Schedule Performance of Construction Manager at Risk (CMAR) Delivery on Pipeline Engineering and Construction Projects Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, Crc 2016. 569-578. DOI: 10.1061/9780784479827.058 |
0.509 |
|
2016 |
Ramsey D, Asmar ME. Analysis of Funding Sources for Design-Build-Finance (DBF) Public-Private Partnership (PPP) Projects in the U.S. Transportation Sector: An Ongoing National Study Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, Crc 2016. 331-340. DOI: 10.1061/9780784479827.034 |
0.502 |
|
2016 |
Ramsey D, Asmar ME, Gibson GE. Quantitative Performance Assessment of Single-Step versus Two-Step Design-Build Procurement Journal of Construction Engineering and Management-Asce. 142: 4016033-4016033. DOI: 10.1061/(Asce)Co.1943-7862.0001145 |
0.552 |
|
2016 |
Asmar ME, Hanna AS, Loh WY. Evaluating integrated project delivery using the project quarterback rating Journal of Construction Engineering and Management-Asce. 142: 4015046. DOI: 10.1061/(Asce)Co.1943-7862.0001015 |
0.625 |
|
2016 |
Chokor A, Asmar ME, Tilton C, Srour I. Dual Assessment Framework to Evaluate LEED-Certified Facilities’ Occupant Satisfaction and Energy Performance: Macro and Micro Approaches Journal of Architectural Engineering. 22. DOI: 10.1061/(Asce)Ae.1943-5568.0000186 |
0.326 |
|
2015 |
Ramsey DW, Asmar ME. Cost and Schedule Performance Benchmarks of U.S. Transportation Public–Private Partnership Projects: Preliminary Results Transportation Research Record. 2504: 58-65. DOI: 10.3141/2504-07 |
0.584 |
|
2015 |
Asmar ME, Tilton C. Student Housing Energy Consumption: A Comparison of Chilled Water, Heating, and Electricity Use Procedia Engineering. 118: 1038-1043. DOI: 10.1016/J.Proeng.2015.08.546 |
0.302 |
|
2014 |
Francom T, Asmar ME, Ariaratnam ST. Using alternative project delivery methods to enhance the cost performance of trenchless construction projects Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. 1219-1228. DOI: 10.1061/9780784413517.0125 |
0.564 |
|
2014 |
Cacamis ME, Asmar ME. Improving Project Performance through Partnering and Emotional Intelligence Practice Periodical On Structural Design and Construction. 19: 50-56. DOI: 10.1061/(Asce)Sc.1943-5576.0000180 |
0.558 |
|
2014 |
Hanna AS, Lotfallah W, Aoun DG, Asmar ME. Mathematical formulation of the project quarterback rating: New framework to assess construction project performance Journal of Construction Engineering and Management. 140. DOI: 10.1061/(Asce)Co.1943-7862.0000871 |
0.608 |
|
2014 |
Asmar ME, Chokor A, Srour I. Are building occupants satisfied with indoor environmental quality of higher education facilities Energy Procedia. 50: 751-760. DOI: 10.1016/J.Egypro.2014.06.093 |
0.305 |
|
2013 |
Hanna A, Boodai F, Asmar ME. State of Practice of Building Information Modeling in Mechanical and Electrical Construction Industries Journal of Construction Engineering and Management-Asce. 139: 4013009. DOI: 10.1061/(Asce)Co.1943-7862.0000747 |
0.389 |
|
2013 |
Asmar ME, Hanna AS, Loh WY. Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems Journal of Construction Engineering and Management-Asce. 139: 4013012. DOI: 10.1061/(Asce)Co.1943-7862.0000744 |
0.622 |
|
2012 |
Asmar ME, Lotfallah WB, Loh WY, Hanna AS. Uncertainty Reduction in Multi-Evaluator Decision Making Journal of Computing in Civil Engineering. 26: 105-112. DOI: 10.1061/(Asce)Cp.1943-5487.0000119 |
0.348 |
|
2012 |
Menassa C, Mangasarian S, Asmar ME, Kirar C. Energy Consumption Evaluation of U.S. Navy LEED-Certified Buildings Journal of Performance of Constructed Facilities. 26: 46-53. DOI: 10.1061/(Asce)Cf.1943-5509.0000218 |
0.326 |
|
2011 |
Asmar ME, Hanna AS, Whited GC. New approach to developing conceptual cost estimates for highway projects Journal of Construction Engineering and Management. 137: 942-949. DOI: 10.1061/(Asce)Co.1943-7862.0000355 |
0.421 |
|
2010 |
Asmar ME, Lotfallah W, Whited G, Hanna AS. Quantitative Methods for Design-Build Team Selection Journal of Construction Engineering and Management-Asce. 136: 904-912. DOI: 10.1061/(Asce)Co.1943-7862.0000194 |
0.489 |
|
2009 |
Asmar ME, Hanna AS, Chang CK. Monte Carlo Simulation Approach to Support Alliance Team Selection Journal of Construction Engineering and Management-Asce. 135: 1087-1095. DOI: 10.1061/(Asce)Co.1943-7862.0000074 |
0.607 |
|