Year |
Citation |
Score |
2019 |
Li H, Webster S, Mason N, Kempf KG. Product-Line Pricing Under Discrete Mixed Multinomial Logit Demand Manufacturing & Service Operations Management. 21: 14-28. DOI: 10.1287/Msom.2017.0675 |
0.392 |
|
2019 |
Ayvaz-Cavdaroglu N, Gauri DK, Webster S. Empirical Evidence of Revenue Management in the Cruise Line Industry Journal of Travel Research. 58: 104-120. DOI: 10.1177/0047287517737178 |
0.412 |
|
2017 |
Hekimoğlu MH, Kazaz B, Webster S. Wine analytics: Fine wine pricing and selection under weather and market uncertainty Manufacturing & Service Operations Management. 19: 202-215. DOI: 10.1287/Msom.2016.0602 |
0.362 |
|
2017 |
Park JH, Kazaz B, Webster S. Risk Mitigation of Production Hedging Production and Operations Management. 26: 1299-1314. DOI: 10.1111/Poms.12688 |
0.412 |
|
2017 |
Eftekhar M, Li H, Wassenhove LNV, Webster S. The Role of Media Exposure on Coordination in the Humanitarian Setting Production and Operations Management. 26: 802-816. DOI: 10.1111/Poms.12669 |
0.307 |
|
2017 |
Cole D, Mahapatra S, Webster S. A Comparison of Buyback and Trade-In Policies to Acquire Used Products for Remanufacturing Journal of Business Logistics. 38: 217-232. DOI: 10.1111/Jbl.12159 |
0.376 |
|
2016 |
Park J, Kazaz B, Webster S. Technical Note – Pricing Below Cost Under Exchange‐Rate Risk Production and Operations Management. 25: 153-159. DOI: 10.1111/Poms.12405 |
0.38 |
|
2015 |
Kazaz B, Webster S. Technical Note—Price-Setting Newsvendor Problems with Uncertain Supply and Risk Aversion Operations Research. 63: 807-811. DOI: 10.1287/Opre.2015.1366 |
0.356 |
|
2015 |
Noparumpa T, Kazaz B, Webster S. Wine Futures and Advance Selling Under Quality Uncertainty Manufacturing & Service Operations Management. 17: 411-426. DOI: 10.1287/Msom.2015.0529 |
0.374 |
|
2015 |
Cole D, Kazaz B, Webster S. Final purchase and trade-in decisions in response to a component phase-out announcement: a deterministic analysis International Journal of Production Research. DOI: 10.1080/00207543.2015.1061225 |
0.376 |
|
2014 |
Bernegger PM, Webster S. Fixed-Cycle Smoothed Production Improves Lean Performance for Make-to-Stock Manufacturing Interfaces. 44: 411-427. DOI: 10.1287/Inte.2014.0750 |
0.375 |
|
2014 |
Wang CX, Webster S, Zhang S. Robust price-setting newsvendor model with interval market size and consumer willingness-to-pay International Journal of Production Economics. 154: 100-112. DOI: 10.1016/J.Ijpe.2014.04.006 |
0.388 |
|
2012 |
Wu Z, Kazaz B, Webster S, Yang KK. Ordering, Pricing, and Lead-Time Quotation under Lead-Time and Demand Uncertainty Production and Operations Management. 21: 576-589. DOI: 10.1111/J.1937-5956.2011.01289.X |
0.438 |
|
2012 |
Webster S, Ruben RA, Yang KK. Impact of Storage Assignment Decisions on a Bucket Brigade Order Picking Line Production and Operations Management. 21: 276-290. DOI: 10.1111/J.1937-5956.2011.01267.X |
0.308 |
|
2011 |
Kazaz B, Webster S. The Impact of Yield-Dependent Trading Costs on Pricing and Production Planning Under Supply Uncertainty Manufacturing & Service Operations Management. 13: 404-417. DOI: 10.1287/Msom.1110.0335 |
0.384 |
|
2011 |
Wang CX, Webster S, Zhang S. A comparison of two sourcing tactics for a new component European Journal of Operational Research. 211: 310-317. DOI: 10.1016/J.Ejor.2010.12.009 |
0.38 |
|
2010 |
Özlen M, Webster S. Minimising total flow-time on two parallel machines with planned downtimes and resumable jobs International Journal of Production Research. 48: 201-226. DOI: 10.1080/00207540802446795 |
0.379 |
|
2009 |
Mckay K, Pinedo M, Webster S. Practice-Focused Research Issues For Scheduling Systems Production and Operations Management. 11: 249-258. DOI: 10.1111/J.1937-5956.2002.Tb00494.X |
0.303 |
|
2009 |
Wang CX, Webster S. Markdown money contracts for perishable goods with clearance pricing European Journal of Operational Research. 196: 1113-1122. DOI: 10.1016/J.Ejor.2008.04.024 |
0.369 |
|
2009 |
Wang CX, Webster S, Suresh NC. Would a risk-averse newsvendor order less at a higher selling price? European Journal of Operational Research. 196: 544-553. DOI: 10.1016/J.Ejor.2008.04.002 |
0.347 |
|
2008 |
Webster S, Weng ZK. Ordering and pricing policies in a manufacturing and distribution supply chain for fashion products International Journal of Production Economics. 114: 476-486. DOI: 10.1016/J.Ijpe.2007.06.010 |
0.373 |
|
2008 |
Mitra S, Webster S. Competition in remanufacturing and the effects of government subsidies International Journal of Production Economics. 111: 287-298. DOI: 10.1016/J.Ijpe.2007.02.042 |
0.4 |
|
2007 |
Wang CX, Webster S. Channel Coordination for a Supply Chain with a Risk‐Neutral Manufacturer and a Loss‐Averse Retailer* Decision Sciences. 38: 361-389. DOI: 10.1111/J.1540-5915.2007.00163.X |
0.34 |
|
2007 |
Webster S, Mitra S. Competitive strategy in remanufacturing and the impact of take-back laws Journal of Operations Management. 25: 1123-1140. DOI: 10.1016/J.Jom.2007.01.014 |
0.407 |
|
2003 |
Yang KK, Webster S, Ruben R. Exploratory analysis of flexible workday policies in a job shop International Journal of Production Research. 41: 1721-1737. DOI: 10.1080/1352816031000074946 |
0.349 |
|
2003 |
Azizoglu M, Webster S. Scheduling parallel machines to minimize weighted flowtime with family set-up times International Journal of Production Research. 41: 1199-1215. DOI: 10.1080/0020754021000042959 |
0.388 |
|
2003 |
Gupta JND, Ruiz-Torres AJ, Webster S. Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time Journal of the Operational Research Society. 54: 1263-1274. DOI: 10.1057/Palgrave.Jors.2601638 |
0.419 |
|
2002 |
Webster S. Dynamic Pricing and Lead‐Time Policies for Make‐to‐Order Systems* Decision Sciences. 33: 579-600. DOI: 10.1111/J.1540-5915.2002.Tb01657.X |
0.384 |
|
2002 |
Yang KK, Webster S, Ruben RA. An Evaluation of Flexible Workday Policies in Job Shops Decision Sciences. 33: 223-250. DOI: 10.1111/J.1540-5915.2002.Tb01643.X |
0.415 |
|
2001 |
Webster S, Weng ZK. Improving Repetitive Manufacturing Systems: Model and Insights Operations Research. 49: 99-106. DOI: 10.1287/Opre.49.1.99.11194 |
0.37 |
|
2001 |
Azizoglu M, Webster S. Scheduling a batch processing machine with incompatible job families Computers and Industrial Engineering. 39: 325-335. DOI: 10.1016/S0360-8352(01)00009-2 |
0.402 |
|
2000 |
Webster S, Weng ZK. A Risk-free Perishable Item Returns Policy Manufacturing & Service Operations Management. 2: 100-106. DOI: 10.1287/Msom.2.1.100.23270 |
0.401 |
|
2000 |
Azizoglu M, Webster S. Scheduling a batch processing machine with non-identical job sizes International Journal of Production Research. 38: 2173-2184. DOI: 10.1080/00207540050028034 |
0.414 |
|
2000 |
Gupta JND, Ho JC, Webster S. Bicriteria optimisation of the makespan and mean flowtime on two identical parallel machines Journal of the Operational Research Society. 51: 1330-1339. DOI: 10.1057/Palgrave.Jors.2601016 |
0.387 |
|
2000 |
Webster S, Azizoglu M. Dynamic programming algorithms for scheduling parallel machines with family setup times Computers and Operations Research. 28: 127-137. DOI: 10.1016/S0305-0548(99)00094-5 |
0.379 |
|
1999 |
Hsu A, Bassok Y, Bollen NPB, Qi L, Webster S, Howard JV. Rendezvous Search on the Interval and the Circle Operations Research. 47: 550-558. DOI: 10.1287/Opre.47.4.550 |
0.354 |
|
1999 |
Hsu A, Bassok Y, Bollen NPB, Qi L, Webster S. Remarks On: Some Extenstions of the Discrete Lotsizing and Scheduling Problem Management Science. 45: 768-769. DOI: 10.1287/Mnsc.45.5.768 |
0.346 |
|
1999 |
Daniels RL, Hua SY, Webster S. Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment Computers and Operations Research. 26: 143-155. DOI: 10.1016/S0305-0548(98)00054-9 |
0.401 |
|
1998 |
Brinkley PA, Stepto D, Haag KR, Folger J, Wang K, Liou K, Carr WD, Moxnes E, Webster S. Note on Parallel Machine Scheduling with Batch Setup Times Operations Research. 46: 423-423. DOI: 10.1287/Opre.46.3.423 |
0.363 |
|
1998 |
Webster S, Jog PD, Gupta A. A Genetic Algorithm For Scheduling Job Families On A Single Machine With Arbitrary Earliness/Tardiness Penalties And An Unrestricted Common Due Date International Journal of Production Research. 36: 2543-2551. DOI: 10.1080/002075498192689 |
0.352 |
|
1997 |
Azizoglu M, Webster S. Scheduling about an unrestricted common due window with arbitrary earliness/tardiness penalty rates Iie Transactions. 29: 1001-1006. DOI: 10.1080/07408179708966418 |
0.414 |
|
1997 |
Azizoglu M, Webster S. Scheduling job families about an unrestricted common due date on a single machine International Journal of Production Research. 35: 1321-1330. DOI: 10.1080/002075497195344 |
0.414 |
|
1996 |
Webster S. A general lower bound for the makespan problem European Journal of Operational Research. 89: 516-524. DOI: 10.1016/0377-2217(94)00333-5 |
0.365 |
|
1995 |
Webster S, Baker KR. Scheduling groups of jobs on a single machine Operations Research. 43: 692-703. DOI: 10.1287/Opre.43.4.692 |
0.376 |
|
1995 |
Webster S, Gupta A. The general optimal market area model with uncertain and nonstationary demand Location Science. 3: 25-38. DOI: 10.1016/0966-8349(95)00002-Y |
0.377 |
|
1995 |
Webster S. Weighted flow time bounds for scheduling identical processors European Journal of Operational Research. 80: 103-111. DOI: 10.1016/0377-2217(93)E0142-K |
0.333 |
|
1994 |
Webster S. A note on “Schedule of n jobs on two identical machines to minimize weighted mean flow time” Computers & Industrial Engineering. 26: 795-796. DOI: 10.1016/0360-8352(94)90014-0 |
0.373 |
|
1992 |
Webster S. New bounds for the identical parallel processor weighted flow time problem Management Science. 38: 124-136. DOI: 10.1287/Mnsc.38.1.124 |
0.358 |
|
Show low-probability matches. |