Year |
Citation |
Score |
2020 |
Li Z, Tang L, Liu J. A Memetic Algorithm Based on Probability Learning for Solving the Multidimensional Knapsack Problem. Ieee Transactions On Cybernetics. PMID 32673199 DOI: 10.1109/Tcyb.2020.3002495 |
0.47 |
|
2020 |
Zhao G, Liu J, Tang L, Zhao R, Dong Y. Model and Heuristic Solutions for the Multiple Double-Load Crane Scheduling Problem in Slab Yards Ieee Transactions On Automation Science and Engineering. 17: 1307-1319. DOI: 10.1109/Tase.2019.2946196 |
0.576 |
|
2020 |
Liu C, Tang L, Liu J. A Stacked Autoencoder With Sparse Bayesian Regression for End-Point Prediction Problems in Steelmaking Process Ieee Transactions On Automation Science and Engineering. 17: 550-561. DOI: 10.1109/Tase.2019.2935314 |
0.398 |
|
2020 |
Guo Q, Tang L, Liu J, Zhao S. Continuous-time formulation and differential evolution algorithm for an integrated batching and scheduling problem in aluminium industry International Journal of Production Research. 1-16. DOI: 10.1080/00207543.2020.1747656 |
0.528 |
|
2020 |
Ge P, Meng Y, Liu J, Tang L, Zhao R. Logistics optimisation of slab pre-marshalling problem in steel industry International Journal of Production Research. 58: 4050-4070. DOI: 10.1080/00207543.2019.1641238 |
0.421 |
|
2020 |
Zhao G, Liu J, Dong Y. Scheduling the operations of a double-load crane in slab yards International Journal of Production Research. 58: 2647-2657. DOI: 10.1080/00207543.2019.1629666 |
0.416 |
|
2019 |
Liu C, Tang L, Liu J, Tang Z. A Dynamic Analytics Method Based on Multistage Modeling for a BOF Steelmaking Process Ieee Transactions On Automation Science and Engineering. 16: 1097-1109. DOI: 10.1109/Tase.2018.2865414 |
0.443 |
|
2019 |
Tang L, Tang L, Liu J, Cheng C. Global method for a class of operation optimization problem in steel rolling systems Industrial & Engineering Chemistry Research. 58: 5552-5566. DOI: 10.1021/Acs.Iecr.8B05022 |
0.373 |
|
2019 |
Liu C, Tang L, Liu J. Least squares support vector machine with self-organizing multiple kernel learning and sparsity Neurocomputing. 331: 493-504. DOI: 10.1016/J.Neucom.2018.11.067 |
0.395 |
|
2017 |
Luo J, Liu J, Hu Y. An MILP model and a hybrid evolutionary algorithm for integrated operation optimisation of multi-head surface mounting machines in PCB assembly International Journal of Production Research. 55: 145-160. DOI: 10.1080/00207543.2016.1200154 |
0.517 |
|
2017 |
Tang L, Zhao X, Liu J, Leung JY. Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine European Journal of Operational Research. 263: 401-411. DOI: 10.1016/J.Ejor.2017.05.019 |
0.466 |
|
2016 |
Tang L, Meng Y, Chen ZL, Liu J. Coil batching to improve productivity and energy utilization in steel production Manufacturing and Service Operations Management. 18: 262-279. DOI: 10.1287/Msom.2015.0558 |
0.556 |
|
2016 |
Tang L, Sun D, Liu J. Integrated storage space allocation and ship scheduling problem in bulk cargo terminals Iie Transactions (Institute of Industrial Engineers). 48: 428-439. DOI: 10.1080/0740817X.2015.1063791 |
0.481 |
|
2016 |
Liu S, Chen W, Liu J. Robust assignment of airport gates with operational safety constraints International Journal of Automation and Computing. 13: 31-41. DOI: 10.1007/S11633-015-0914-X |
0.509 |
|
2015 |
Tang L, Dong Y, Liu J. Differential Evolution with an Individual-Dependent Mechanism Ieee Transactions On Evolutionary Computation. 19: 560-574. DOI: 10.1109/Tevc.2014.2360890 |
0.333 |
|
2015 |
Tang L, Jiang W, Liu J, Dong Y. Research into container reshuffling and stacking problems in container terminal yards Iie Transactions. 47: 751-766. DOI: 10.1080/0740817X.2014.971201 |
0.537 |
|
2015 |
Tang L, Liu J, Yang F, Li F, Li K. Modeling and solution for the ship stowage planning problem of coils in the steel industry Naval Research Logistics. DOI: 10.1002/Nav.21664 |
0.57 |
|
2015 |
Tang L, Li F, Liu J. Integrated scheduling of loading and transportation with tractors and semitrailers separated Naval Research Logistics. 62: 416-433. DOI: 10.1002/Nav.21639 |
0.502 |
|
2014 |
Tang L, Meng Y, Wang G, Chen Z, Liu J, Hu G, Chen L, Zhang B. Operations Research Transforms Baosteel’s Operations Interfaces. 44: 22-38. DOI: 10.1287/Inte.2013.0719 |
0.323 |
|
2014 |
Tang L, Zhao Y, Liu J. An Improved Differential Evolution Algorithm for Practical Dynamic Scheduling in Steelmaking-Continuous Casting Production Ieee Transactions On Evolutionary Computation. 18: 209-225. DOI: 10.1109/Tevc.2013.2250977 |
0.522 |
|
2014 |
Pang KW, Liu J. An integrated model for ship routing with transshipment and berth allocation Iie Transactions (Institute of Industrial Engineers). 46: 1357-1370. DOI: 10.1080/0740817X.2014.889334 |
0.502 |
|
2014 |
Tang L, Xie X, Liu J. Crane scheduling in a warehouse storing steel coils Iie Transactions. 46: 267-282. DOI: 10.1080/0740817X.2013.802841 |
0.528 |
|
2014 |
Jiang Y, Liu J. A new model and an efficient branch-and-bound solution for cyclic multi-hoist scheduling Iie Transactions. 46: 249-262. DOI: 10.1080/0740817X.2012.762485 |
0.546 |
|
2014 |
Luo J, Liu J. An MILP model and clustering heuristics for LED assembly optimisation on high-speed hybrid pick-and-place machines International Journal of Production Research. 52: 1016-1031. DOI: 10.1080/00207543.2013.828173 |
0.468 |
|
2014 |
Tang L, Zhao J, Liu J. Modeling and solution of the joint quay crane and truck scheduling problem European Journal of Operational Research. 236: 978-990. DOI: 10.1016/J.Ejor.2013.08.050 |
0.551 |
|
2014 |
Tang L, Gong H, Liu J, Li F. Bicriteria scheduling on a single batching machine with job transportation and deterioration considerations Naval Research Logistics. 61: 269-285. DOI: 10.1002/Nav.21582 |
0.498 |
|
2013 |
Jiu S, Zhou Z, Liu J. The equipment maintenance scheduling problem in a coal production system International Journal of Production Research. 51: 5309-5336. DOI: 10.1080/00207543.2013.808773 |
0.508 |
|
2013 |
Tang L, Luo J, Liu J. Modelling and a tabu search solution for the slab reallocation problem in the steel industry International Journal of Production Research. 51: 4405-4420. DOI: 10.1080/00207543.2013.788796 |
0.554 |
|
2012 |
Tang L, Yang Y, Liu J. Modeling and Solution for the Coil Sequencing Problem in Steel Color-Coating Production Ieee Transactions On Control Systems Technology. 20: 1409-1420. DOI: 10.1109/Tcst.2011.2170196 |
0.564 |
|
2012 |
Tang L, Che P, Liu J. A stochastic production planning problem with nonlinear cost Computers and Operations Research. 39: 1977-1987. DOI: 10.1016/J.Cor.2011.09.007 |
0.495 |
|
2012 |
Tang L, Zhao R, Liu J. Models and algorithms for shuffling problems in steel plants Naval Research Logistics. 59: 502-524. DOI: 10.1002/Nav.21503 |
0.576 |
|
2011 |
Tang L, Meng Y, Liu J. An improved Lagrangean relaxation algorithm for the dynamic batching decision problem International Journal of Production Research. 49: 2501-2517. DOI: 10.1080/00207543.2010.532915 |
0.551 |
|
2011 |
Tang L, Wang G, Liu J, Liu J. A combination of Lagrangian relaxation and column generation for order batching in steelmaking and continuous‐casting production Naval Research Logistics. 58: 370-388. DOI: 10.1002/Nav.20452 |
0.561 |
|
2010 |
Tang L, Jiang S, Liu J. Rolling horizon approach for dynamic parallel machine scheduling problem with release times Industrial and Engineering Chemistry Research. 49: 381-389. DOI: 10.1021/Ie900206M |
0.514 |
|
2010 |
Zhang Y, Zhou Z, Liu J. The production scheduling problem in a multi-page invoice printing system Computers & Operations Research. 37: 1814-1821. DOI: 10.1016/J.Cor.2010.01.014 |
0.528 |
|
2010 |
Tang L, Yang Y, Liu J. An efficient optimal solution to the coil sequencing problem in electro-galvanizing line Computers & Operations Research. 37: 1780-1796. DOI: 10.1016/J.Cor.2010.01.009 |
0.501 |
|
2009 |
Tang L, Li S, Liu J. Dynamically scheduling ships to multiple continuous berth spaces in an iron and steel complex International Transactions in Operational Research. 16: 87-107. DOI: 10.1111/J.1475-3995.2009.00662.X |
0.552 |
|
2009 |
Tang L, Xie X, Liu J. Scheduling of a single crane in batch annealing process Computers & Operations Research. 36: 2853-2865. DOI: 10.1016/J.Cor.2008.12.014 |
0.555 |
|
2009 |
Wan Y, Liu J, Tsai P. The assignment of storage locations to containers for a container stack Naval Research Logistics. 56: 699-713. DOI: 10.1002/Nav.20373 |
0.52 |
|
2008 |
Liu J, Wu L, Zhou Z. A time-varying lot size method for the economic lot scheduling problem with shelf life considerations European Journal of Industrial Engineering. 2: 337-355. DOI: 10.1504/Ejie.2008.017689 |
0.455 |
|
2008 |
Tang L, Wang X, Liu J. Color-Coating Production Scheduling for Coils in Inventory in Steel Industry Ieee Transactions On Automation Science and Engineering. 5: 544-549. DOI: 10.1109/Tase.2008.918126 |
0.479 |
|
2008 |
Zhou Z, Liu J. A heuristic algorithm for the two-hoist cyclic scheduling problem with overlapping hoist coverage ranges Iie Transactions. 40: 782-794. DOI: 10.1080/07408170701748729 |
0.54 |
|
2008 |
Tang L, Liu G, Liu J. Raw material inventory solution in iron and steel industry using Lagrangian relaxation Journal of the Operational Research Society. 59: 44-53. DOI: 10.1057/Palgrave.Jors.2602335 |
0.436 |
|
2008 |
Liu J. Single-job lot streaming in m - 1 two-stage hybrid flowshops European Journal of Operational Research. 187: 1171-1183. DOI: 10.1016/J.Ejor.2006.06.066 |
0.506 |
|
2007 |
Jiang Y, Liu J. Multihoist Cyclic Scheduling With Fixed Processing and Transfer Times Ieee Transactions On Automation Science and Engineering. 4: 435-450. DOI: 10.1109/Tase.2006.884057 |
0.569 |
|
2007 |
Tang L, Wang G, Liu J. A branch-and-price algorithm to solve the molten iron allocation problem in iron and steel industry Computers & Operations Research. 34: 3001-3015. DOI: 10.1016/J.Cor.2005.11.010 |
0.514 |
|
2007 |
Tang L, Xuan H, Liu J. Hybrid backward and forward dynamic programming based Lagrangian relaxation for single machine scheduling Computers and Operations Research. 34: 2625-2636. DOI: 10.1016/J.Cor.2005.10.006 |
0.516 |
|
2006 |
Tang L, Xuan H, Liu J. A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time Computers and Operations Research. 33: 3344-3359. DOI: 10.1016/J.Cor.2005.03.028 |
0.568 |
|
2006 |
Liu J, Wan Y, Wang L. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures Naval Research Logistics. 53: 60-74. DOI: 10.1002/Nav.20108 |
0.5 |
|
2005 |
Liu J, Jiang Y. An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem Operations Research. 53: 313-327. DOI: 10.1287/Opre.1040.0167 |
0.548 |
|
2005 |
Murty KG, Wan YW, Liu J, Tseng MM, Leung E, Lai KK, Chiu HWC. Hongkong international terminals gains elastic capacity using a data-intensive decision-support system Interfaces. 35: 61-75. DOI: 10.1287/Inte.1040.0120 |
0.356 |
|
2005 |
Zhang W, Yin C, Liu J, Linn RJ. Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops International Journal of Production Economics. 96: 189-200. DOI: 10.1016/J.Ijpe.2004.04.005 |
0.493 |
|
2005 |
Tang L, Liu W, Liu J. A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment Journal of Intelligent Manufacturing. 16: 361-370. DOI: 10.1007/S10845-005-7029-0 |
0.395 |
|
2003 |
Liu J, Li C, Chan C. Mixed truck delivery systems with both hub-and-spoke and direct shipment Transportation Research Part E-Logistics and Transportation Review. 39: 325-339. DOI: 10.1016/S1366-5545(03)00005-X |
0.341 |
|
2003 |
Linn R, Liu JY, Wan YW, Zhang C, Murty KG. Rubber tired gantry crane deployment for container yard operation Computers and Industrial Engineering. 45: 429-442. DOI: 10.1016/S0360-8352(03)00046-9 |
0.491 |
|
2003 |
Zhang C, Liu J, Wan YW, Murty KG, Linn RJ. Storage space allocation in container terminals Transportation Research Part B: Methodological. 37: 883-903. DOI: 10.1016/S0191-2615(02)00089-9 |
0.557 |
|
2002 |
Tang L, Liu J, Rong A, Yang Z. Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules International Journal of Production Research. 40: 1583-1595. DOI: 10.1080/00207540110110118424 |
0.482 |
|
2002 |
Tang L, Luh PB, Liu J, Fang L. Steel-making process scheduling using Lagrangian relaxation International Journal of Production Research. 40: 55-70. DOI: 10.1080/00207540110073000 |
0.519 |
|
2002 |
Liu J, Jiang Y, Zhou Z. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution Iie Transactions. 34: 905-914. DOI: 10.1023/A:1015788912613 |
0.51 |
|
2002 |
Tang L, Liu J. A modified genetic algorithm for the flow shop sequencing problem to minimize mean flow time Journal of Intelligent Manufacturing. 13: 61-67. DOI: 10.1023/A:1013681029869 |
0.453 |
|
2002 |
Zhang C, Wan Y, Liu J, Linn RJ. Dynamic crane deployment in container storage yards Transportation Research Part B-Methodological. 36: 537-555. DOI: 10.1016/S0191-2615(01)00017-0 |
0.591 |
|
2001 |
Tang L, Liu J, Rong A, Yang Z. An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling Journal of the Operational Research Society. 52: 1091-1097. DOI: 10.1057/Palgrave.Jors.2601143 |
0.488 |
|
2001 |
Tang L, Liu J, Rong A, Yang Z. A review of planning and scheduling systems and methods for integrated steel production European Journal of Operational Research. 133: 1-20. DOI: 10.1016/S0377-2217(00)00240-X |
0.369 |
|
2001 |
Liu J, Reeves CR. Constructive and composite heuristic solutions to the P//∑Ci scheduling problem European Journal of Operational Research. 132: 439-452. DOI: 10.1016/S0377-2217(00)00137-5 |
0.514 |
|
2000 |
Tang L, Liu J, Rong A, Yang Z. A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex European Journal of Operational Research. 124: 267-282. DOI: 10.1016/S0377-2217(99)00380-X |
0.487 |
|
2000 |
Tang L, Liu J, Rong A, Yang Z. A mathematical programming model for scheduling steelmaking-continuous casting production European Journal of Operational Research. 120: 423-435. DOI: 10.1016/S0377-2217(99)00041-7 |
0.45 |
|
1999 |
Liu J, Maccarthy BL. General heuristic procedures and solution strategies for FMS scheduling International Journal of Production Research. 37: 3305-3333. DOI: 10.1080/002075499190301 |
0.485 |
|
1998 |
Linn RJ, Liu J, Kowe PSH. Efficient Heuristics For Drilling Route Optimization In Printed Circuit Board Manufacturing Journal of Electronics Manufacturing. 8: 127-138. DOI: 10.1142/S0960313198000124 |
0.422 |
|
1998 |
Wan Y, Cheung RK, Liu J, Tong JH. Warehouse location problems for air freight forwarders: a challenge created by the airport relocation Journal of Air Transport Management. 4: 201-207. DOI: 10.1016/S0969-6997(98)00024-6 |
0.41 |
|
1997 |
Liu J, MacCarthy BL. A global MILP model for FMS scheduling European Journal of Operational Research. 100: 441-453. DOI: 10.1016/S0377-2217(96)00055-0 |
0.516 |
|
1996 |
Liu J, MacCARTHY BL. The classification of FMS scheduling problems International Journal of Production Research. 34: 647-656. DOI: 10.1080/00207549608904925 |
0.492 |
|
1993 |
Maccarthy BL, Liu J. A new classification scheme for flexible manufacturing systems International Journal of Production Research. 31: 299-309. DOI: 10.1080/00207549308956726 |
0.308 |
|
1993 |
Maccarthy BL, Liu J. Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling International Journal of Production Research. 31: 59-79. DOI: 10.1080/00207549308956713 |
0.366 |
|
1991 |
Liu J, MacCARTHY BL. Effective heuristics for the single machine sequencing problem with ready times International Journal of Production Research. 29: 1521-1533. DOI: 10.1080/00207549108948029 |
0.488 |
|
Show low-probability matches. |