Year |
Citation |
Score |
2020 |
Liu Z, Lu L, Qi X. The showrooming effect on integrated dual channels Journal of the Operational Research Society. 71: 1347-1356. DOI: 10.1080/01605682.2019.1605470 |
0.306 |
|
2020 |
Liu Z, Lu L, Qi X. Price quotation for orders with different due dates International Journal of Production Economics. 220: 107448. DOI: 10.1016/J.Ijpe.2019.07.021 |
0.463 |
|
2019 |
Li X, Qi X. On pricing and quality decisions with risk aversion Omega-International Journal of Management Science. 102118. DOI: 10.1016/J.Omega.2019.102118 |
0.327 |
|
2019 |
Zhang A, Qi X, Li G. Machine scheduling with soft precedence constraints European Journal of Operational Research. 282: 491-505. DOI: 10.1016/J.Ejor.2019.09.041 |
0.496 |
|
2018 |
Liu Z, Lu L, Qi X. Cost allocation in rescheduling with machine unavailable period European Journal of Operational Research. 266: 16-28. DOI: 10.1016/J.Ejor.2017.09.015 |
0.477 |
|
2017 |
Xiao T, Qi X. Product Line Design and Outsourcing Strategies in Dyadic Supply Chains Ieee Transactions On Engineering Management. 64: 316-326. DOI: 10.1109/Tem.2017.2665702 |
0.385 |
|
2017 |
Wang Y, Qi X. Evasion policies for a vessel being chased by pirate skiffs Naval Research Logistics. 64: 453-475. DOI: 10.1002/Nav.21766 |
0.397 |
|
2016 |
Jarrah AI, Qi X, Bard JF. The Destination-Loader-Door Assignment Problem for Automated Package Sorting Centers Transportation Science. 50: 1314-1336. DOI: 10.1287/Trsc.2014.0521 |
0.427 |
|
2016 |
Liu L, Qi X, Xu Z. Computing Near-Optimal Stable Cost Allocations for Cooperative Games by Lagrangian Relaxation Informs Journal On Computing. 28: 687-702. DOI: 10.1287/Ijoc.2016.0707 |
0.449 |
|
2016 |
Li C, Qi X, Song D. Real-time schedule recovery in liner shipping service with regular uncertainties and disruption events Transportation Research Part B-Methodological. 93: 762-788. DOI: 10.1016/J.Trb.2015.10.004 |
0.44 |
|
2016 |
Li Y, Zhen X, Qi X, Cai GG. Penalty and financial assistance in a supply chain with supply disruption Omega (United Kingdom). 61: 167-181. DOI: 10.1016/J.Omega.2015.12.011 |
0.394 |
|
2016 |
Ou J, Zhong X, Qi X. Scheduling parallel machines with inclusive processing set restrictions and job rejection: Scheduling Parallel Machines Naval Research Logistics. 63: 667-681. DOI: 10.1002/Nav.21728 |
0.327 |
|
2015 |
Li C, Qi X, Lee C. Disruption Recovery for a Vessel in Liner Shipping Transportation Science. 49: 900-921. DOI: 10.1287/Trsc.2015.0589 |
0.43 |
|
2015 |
Zhao Y, Qi X, Li M. On scheduling with non-increasing time slot cost to minimize total weighted completion time Journal of Scheduling. 1-9. DOI: 10.1007/S10951-015-0462-9 |
0.448 |
|
2014 |
Bard JF, Shao Y, Qi X, Jarrah AI. The traveling therapist scheduling problem Iie Transactions (Institute of Industrial Engineers). 46: 683-706. DOI: 10.1080/0740817X.2013.851434 |
0.464 |
|
2014 |
Yu M, Qi X. A vehicle routing problem with multiple overlapped batches Transportation Research Part E-Logistics and Transportation Review. 61: 40-55. DOI: 10.1016/J.Tre.2013.10.004 |
0.462 |
|
2014 |
Lu L, Qi X, Liu Z. On the cooperation of recycling operations European Journal of Operational Research. 233: 349-358. DOI: 10.1016/J.Ejor.2013.04.022 |
0.401 |
|
2014 |
Yang J, Xia Y, Qi X, Liu Y. A nonatomic‐game model for timing clearance sales under competition Naval Research Logistics. 61: 365-385. DOI: 10.1002/Nav.21589 |
0.339 |
|
2013 |
Lu L, Liu Z, Qi X. Coordinated price quotation and production scheduling for uncertain order inquiries Iie Transactions. 45: 1293-1308. DOI: 10.1080/0740817X.2012.748993 |
0.5 |
|
2013 |
Yu M, Qi X. Storage space allocation models for inbound containers in an automatic container terminal European Journal of Operational Research. 226: 32-45. DOI: 10.1016/J.Ejor.2012.10.045 |
0.417 |
|
2013 |
Chen Z, Wang H, Qi X. Pricing and Water Resource Allocation Scheme for the South-to-North Water Diversion Project in China Water Resources Management. 27: 1457-1472. DOI: 10.1007/S11269-012-0248-1 |
0.316 |
|
2012 |
Liu Z, Lu L, Qi X. Simultaneous and sequential price quotations for uncertain order inquiries with production scheduling cost Iie Transactions. 44: 820-833. DOI: 10.1080/0740817X.2011.649389 |
0.506 |
|
2012 |
Qi X, Song D. Minimizing fuel emissions by optimizing vessel schedules in liner shipping with uncertain port times Transportation Research Part E-Logistics and Transportation Review. 48: 863-880. DOI: 10.1016/J.Tre.2012.02.001 |
0.426 |
|
2012 |
Qi X. Production scheduling with subcontracting: The subcontractor's pricing game Journal of Scheduling. 15: 773-781. DOI: 10.1007/S10951-012-0273-1 |
0.49 |
|
2012 |
Xiao T, Qi X. A two-stage supply chain with demand sensitive to price, delivery time, and reliability of delivery Annals of Operations Research. 1-22. DOI: 10.1007/S10479-012-1085-6 |
0.441 |
|
2011 |
Qi X. Outsourcing and production scheduling for a two-stage flow shop International Journal of Production Economics. 129: 43-50. DOI: 10.1016/J.Ijpe.2010.08.011 |
0.46 |
|
2011 |
Lu L, Qi X. Dynamic lot sizing for multiple products with a new joint replenishment model European Journal of Operational Research. 212: 74-80. DOI: 10.1016/J.Ejor.2011.01.031 |
0.496 |
|
2010 |
Xiao T, Qi X. Strategic wholesale pricing in a supply chain with a potential entrant European Journal of Operational Research. 202: 444-455. DOI: 10.1016/J.Ejor.2009.05.023 |
0.436 |
|
2010 |
Ou J, Qi X, Lee CY. Parallel machine scheduling with multiple unloading servers Journal of Scheduling. 13: 213-226. DOI: 10.1007/S10951-009-0104-1 |
0.426 |
|
2010 |
Wan G, Qi X. Scheduling with variable time slot costs Naval Research Logistics. 57: 159-171. DOI: 10.1002/Nav.20393 |
0.443 |
|
2009 |
Yang J, Qi X. Managing partially controllable raw material acquisition and outsourcing in production planning Iie Transactions. 42: 188-202. DOI: 10.1080/07408170903232555 |
0.445 |
|
2009 |
Lee C, Qi X. Vehicle scheduling with combinable delivery and pickup operations Operations Research Letters. 37: 399-404. DOI: 10.1016/J.Orl.2009.06.002 |
0.409 |
|
2009 |
Yang J, Qi X. On the design of coordinating contracts International Journal of Production Economics. 122: 581-594. DOI: 10.1016/J.Ijpe.2009.06.002 |
0.341 |
|
2009 |
Qi X. Two-stage production scheduling with an option of outsourcing from a remote supplier Journal of Systems Science and Systems Engineering. 18: 1-15. DOI: 10.1007/S11518-009-5094-1 |
0.483 |
|
2008 |
Qi X. Coordinated logistics scheduling for in-house production and outsourcing Ieee Transactions On Automation Science and Engineering. 5: 188-192. DOI: 10.1109/Tase.2006.887159 |
0.466 |
|
2008 |
Xiao T, Qi X. Price competition, cost and demand disruptions and coordination of a supply chain with one manufacturer and two competing retailers Omega. 36: 741-753. DOI: 10.1016/J.Omega.2006.02.008 |
0.437 |
|
2007 |
Xiao T, Qi X, Yu G. Coordination of supply chain after demand disruptions when retailers compete International Journal of Production Economics. 109: 162-179. DOI: 10.1016/J.Ijpe.2006.11.013 |
0.456 |
|
2007 |
Qi X. Order splitting with multiple capacitated suppliers European Journal of Operational Research. 178: 421-432. DOI: 10.1016/J.Ejor.2006.02.004 |
0.484 |
|
2007 |
Qi X. A note on worst-case performance of heuristics for maintenance scheduling problems Discrete Applied Mathematics. 155: 416-422. DOI: 10.1016/J.Dam.2006.06.005 |
0.425 |
|
2007 |
Dai T, Qi X. An acquisition policy for a multi-supplier system with a finite-time horizon Computers and Operations Research. 34: 2758-2773. DOI: 10.1016/J.Cor.2005.10.011 |
0.682 |
|
2006 |
Wang J, Qi X, Chen B. Wavelength assignment for multicast in all-optical WDM networks with splitting constraints Ieee Acm Transactions On Networking. 14: 169-182. DOI: 10.1109/Tnet.2005.863481 |
0.373 |
|
2006 |
Qi X. A logistics scheduling model: Scheduling and transshipment for two processing centers Iie Transactions (Institute of Industrial Engineers). 38: 537-546. DOI: 10.1080/074081791009022 |
0.469 |
|
2006 |
Xu M, Qi X, Yu G, Zhang H. Coordinating dyadic supply chains when production costs are disrupted Iie Transactions. 38: 765-775. DOI: 10.1080/07408170600575447 |
0.44 |
|
2006 |
Qi X, Bard JF, Yu G. Disruption management for machine scheduling: The case of SPT schedules International Journal of Production Economics. 103: 166-184. DOI: 10.1016/J.Ijpe.2005.05.021 |
0.465 |
|
2006 |
Yang J, Qi X, Xia Y, Yu G. Inventory control with Markovian capacity and the option of order rejection European Journal of Operational Research. 174: 622-645. DOI: 10.1016/J.Ejor.2004.12.016 |
0.377 |
|
2006 |
Qi X, Bard JF. Generating labor requirements and rosters for mail handlers using simulation and optimization Computers & Operations Research. 33: 2645-2666. DOI: 10.1016/J.Cor.2005.02.022 |
0.399 |
|
2005 |
Yang J, Qi X, Xia Y. A Production-Inventory System with Markovian Capacity and Outsourcing Option Operations Research. 53: 328-349. DOI: 10.1287/Opre.1040.0165 |
0.411 |
|
2005 |
Yang J, Qi X, Yu G. Disruption management in production planning Naval Research Logistics. 52: 420-442. DOI: 10.1002/Nav.20087 |
0.463 |
|
2005 |
Qi X. A logistics scheduling model: Inventory cost reduction by batching Naval Research Logistics. 52: 312-320. DOI: 10.1002/Nav.20078 |
0.495 |
|
2004 |
Qi X, Bard JF, Yu G. Class Scheduling for Pilot Training Operations Research. 52: 148-162. DOI: 10.1287/Opre.1030.0076 |
0.423 |
|
2004 |
Qi X, Bard JF, Yu G. Supply chain coordination with demand disruptions Omega-International Journal of Management Science. 32: 301-312. DOI: 10.1016/J.Omega.2003.12.002 |
0.405 |
|
2003 |
Xu M, Qi X, Yu G, Zhang H, Gao C. The demand disruption management problem for a supply chain system with nonlinear demand functions Journal of Systems Science and Systems Engineering. 12: 82-97. DOI: 10.1007/S11518-006-0122-X |
0.445 |
|
2002 |
Qi X, Yu G, Bard JF. Single machine scheduling with assignable due dates Discrete Applied Mathematics. 122: 211-233. DOI: 10.1016/S0166-218X(01)00316-X |
0.442 |
|
1999 |
Qi X, Chen T, Tu F. Scheduling the maintenance on a single machine Journal of the Operational Research Society. 50: 1071-1078. DOI: 10.1057/Palgrave.Jors.2600791 |
0.441 |
|
1999 |
Qi X, Tu F. Earliness and tardiness scheduling problems on a batch processor Discrete Applied Mathematics. 98: 131-145. DOI: 10.1016/S0166-218X(99)00113-4 |
0.446 |
|
1998 |
Qi X, Tu F. Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method European Journal of Operational Research. 105: 502-508. DOI: 10.1016/S0377-2217(97)00075-1 |
0.42 |
|
Show low-probability matches. |