Year |
Citation |
Score |
2020 |
Calmon AP, Graves SC, Lemmens S. Warranty Matching in a Consumer Electronics Closed-Loop Supply Chain Manufacturing & Service Operations Management. DOI: 10.1287/Msom.2020.0889 |
0.361 |
|
2020 |
Chen AI, Graves SC. Item Aggregation and Column Generation for Online-Retail Inventory Placement Manufacturing & Service Operations Management. DOI: 10.1287/Msom.2020.0867 |
0.309 |
|
2019 |
Yuan R, Graves SC, Cezik T. Velocity‐Based Storage Assignment in Semi‐Automated Storage Systems Production and Operations Management. 28: 354-373. DOI: 10.1111/Poms.12925 |
0.354 |
|
2019 |
Chang JC, Graves SC, Kirchain RE, Olivetti EA. Integrated planning for design and production in two-stage recycling operations European Journal of Operational Research. 273: 535-547. DOI: 10.1016/J.Ejor.2018.08.022 |
0.352 |
|
2018 |
Yuan R, Cezik T, Graves SC. Stowage decisions in multi-zone storage systems International Journal of Production Research. 56: 333-343. DOI: 10.1080/00207543.2017.1398428 |
0.302 |
|
2017 |
Calmon AP, Graves SC. Inventory Management in a Consumer Electronics Closed-Loop Supply Chain Manufacturing & Service Operations Management. 19: 568-585. DOI: 10.2139/Ssrn.2622405 |
0.423 |
|
2017 |
Acimovic JA, Graves SC. Mitigating Spillover in Online Retailing via Replenishment Manufacturing & Service Operations Management. 19: 419-436. DOI: 10.2139/Ssrn.2459097 |
0.472 |
|
2017 |
Nguyen TBT, Sivakumar AI, Graves SC. Capacity planning with demand uncertainty for outpatient clinics European Journal of Operational Research. 267: 338-348. DOI: 10.1016/J.Ejor.2017.11.038 |
0.312 |
|
2016 |
Nguyen TT, Sivakumar AI, Graves SC. Scheduling rules to achieve lead-time targets in outpatient appointment systems. Health Care Management Science. PMID 27502955 DOI: 10.1007/S10729-016-9374-2 |
0.347 |
|
2016 |
Graves SC, Schoenmeyr TI. Strategic Safety-Stock Placement in Supply Chains with Capacity Constraints Manufacturing & Service Operations Management. 18: 445-460. DOI: 10.1287/Msom.2016.0577 |
0.439 |
|
2015 |
Nguyen TB, Sivakumar AI, Graves SC. A network flow approach for tactical resource planning in outpatient clinics. Health Care Management Science. 18: 124-36. PMID 24879403 DOI: 10.1007/S10729-014-9284-0 |
0.337 |
|
2015 |
Acimovic JA, Graves SC. Making Better Fulfillment Decisions on the Fly in an Online Retail Environment Manufacturing & Service Operations Management. 17: 34-51. DOI: 10.1287/Msom.2014.0505 |
0.378 |
|
2015 |
Yuan R, Graves SC. Setting optimal production lot sizes and planned lead times in a job shop International Journal of Production Research. DOI: 10.1080/00207543.2015.1073859 |
0.43 |
|
2014 |
Li H, Graves SC, Huh WT. Optimal Capacity Conversion for Product Transitions Under High Service Requirements Manufacturing & Service Operations Management. 16: 46-60. DOI: 10.1287/Msom.2013.0445 |
0.408 |
|
2014 |
Al-Nory MT, Brodsky A, Bozkaya B, Graves SC. Desalination supply chain decision analysis and optimization Desalination. 347: 144-157. DOI: 10.1016/J.Desal.2014.05.037 |
0.375 |
|
2013 |
Al-Nory MT, Graves SC. Water desalination supply chain modeling and optimization: case of Saudi Arabia Ida Journal of Desalination and Water Reuse. 5: 64-74. DOI: 10.1179/2051645213Y.0000000008 |
0.405 |
|
2013 |
Al-Nory MT, Graves SC. Water desalination supply chain modelling and optimization Proceedings - International Conference On Data Engineering. 173-180. DOI: 10.1109/ICDEW.2013.6547447 |
0.308 |
|
2013 |
Chhaochhria P, Graves SC. A forecast-driven tactical planning model for a serial manufacturing system International Journal of Production Research. 51: 6860-6879. DOI: 10.1080/00207543.2013.852266 |
0.434 |
|
2012 |
Teo C, Bhatnagar R, Graves SC. An Application of Master Schedule Smoothing and Planned Lead Time Control Production and Operations Management. 21: 211-223. DOI: 10.1111/J.1937-5956.2011.01263.X |
0.403 |
|
2012 |
Li H, Graves SC. Pricing Decisions During Inter-Generational Product Transition Production and Operations Management. 21: 14-28. DOI: 10.1111/J.1937-5956.2010.01216.X |
0.395 |
|
2012 |
Wen N, Graves SC, Justin Ren Z. Ship-pack optimization in a two-echelon distribution system European Journal of Operational Research. 220: 777-785. DOI: 10.1016/J.Ejor.2012.02.003 |
0.348 |
|
2011 |
Fearing D, Acimovic JA, Graves SC. How to Catch a Tiger: Understanding Putting Performance on the PGA Tour Journal of Quantitative Analysis in Sports. 7: 5. DOI: 10.2202/1559-0410.1268 |
0.322 |
|
2011 |
Teo C, Bhatnagar R, Graves SC. Setting planned lead times for a make-to-order production system with master schedule smoothing Iie Transactions. 43: 399-414. DOI: 10.1080/0740817X.2010.523765 |
0.36 |
|
2010 |
Li H, Graves SC, Rosenfield DB. Optimal Planning Quantities for Product Transition Production and Operations Management. 19: 142-155. DOI: 10.1111/J.1937-5956.2009.01091.X |
0.407 |
|
2009 |
Graves SC. A letter from the editor Manufacturing and Service Operations Management. 11: 1-3. DOI: 10.1287/Msom.1080.0253 |
0.304 |
|
2009 |
Schoenmeyr T, Graves SC. Strategic Safety Stocks in Supply Chains with Evolving Forecasts Manufacturing & Service Operations Management. 11: 657-673. DOI: 10.1287/Msom.1080.0245 |
0.426 |
|
2009 |
Xu PJ, Allgor R, Graves SC. Benefits of Reevaluating Real-Time Order Fulfillment Decisions Manufacturing & Service Operations Management. 11: 340-355. DOI: 10.1287/Msom.1080.0222 |
0.379 |
|
2009 |
Chao JS, Graves SC. Reducing Flow Time In Aircraft Manufacturing Production and Operations Management. 7: 38-52. DOI: 10.1111/J.1937-5956.1998.Tb00437.X |
0.338 |
|
2008 |
Graves SC, Willems SP. Strategic Inventory Placement in Supply Chains: Nonstationary Demand Manufacturing & Service Operations Management. 10: 278-287. DOI: 10.1287/Msom.1070.0175 |
0.737 |
|
2007 |
Cheong MLF, Bhatnagar R, Graves SC. Logistics Network Design With Supplier Consolidation Hubs And Multiple Shipment Options Journal of Industrial and Management Optimization. 3: 51-69. DOI: 10.3934/Jimo.2007.3.51 |
0.404 |
|
2007 |
Arslan H, Graves SC, Roemer TA. A Single-Product Inventory Model for Multiple Demand Classes Management Science. 53: 1486-1500. DOI: 10.1287/Mnsc.1070.0701 |
0.441 |
|
2005 |
Graves SC, Willems SP. Optimizing the Supply Chain Configuration for New Products Management Science. 51: 1165-1180. DOI: 10.1287/Mnsc.1050.0367 |
0.731 |
|
2003 |
Graves SC, Willems SP. Correspondence: Erratum: Optimizing Strategic Safety Stock Placement in Supply Chains Manufacturing & Service Operations Management. 5: 176-177. DOI: 10.1287/Msom.5.2.176.16074 |
0.708 |
|
2003 |
Graves SC, Tomlin BT. Process Flexibility in Supply Chains Management Science. 49: 907-919. DOI: 10.1287/Mnsc.49.7.907.16381 |
0.414 |
|
2001 |
Abhyankar HS, Graves SC. Creating an Inventory Hedge for Markov-Modulated Poisson Demand: An Application and Model Manufacturing & Service Operations Management. 3: 306-320. DOI: 10.1287/Msom.3.4.306.9970 |
0.475 |
|
2001 |
Dickinson MW, Thornton AC, Graves S. Technology portfolio management: optimizing interdependent projects over multiple time periods Ieee Transactions On Engineering Management. 48: 518-527. DOI: 10.1109/17.969428 |
0.326 |
|
2000 |
Graves SC, Willems SP. Optimizing Strategic Safety Stock Placement in Supply Chains Manufacturing & Service Operations Management. 2: 68-83. DOI: 10.1287/Msom.2.1.68.23267 |
0.745 |
|
2000 |
Labe RP, Graves SC. Franz Edelman Award for Management Science Achievement Interfaces. 31: 1-6. DOI: 10.1287/Inte.30.1.1.11618 |
0.306 |
|
1999 |
Chen Y, Hess JD, Wilcox RT, Zhang ZJ, Graves SC. Addendum to A Single-Item Inventory Model for a Nonstationary Demand Process Manufacturing & Service Operations Management. 1: 174-174. DOI: 10.1287/Msom.1.2.174 |
0.371 |
|
1999 |
Alrefaei MH, Andradóttir S, Graves SC. A Single-Item Inventory Model for a Nonstationary Demand Process Manufacturing & Service Operations Management. 1: 50-61. DOI: 10.1287/Msom.1.1.50 |
0.42 |
|
1998 |
Graves SC, Kletter DB, Hetzel WB. A Dynamic Model for Requirements Planning with Application to Supply Chain Optimization Operations Research. 46: 35-49. DOI: 10.1287/Opre.46.3.S35 |
0.406 |
|
1997 |
Zhang H, Graves SC. Cyclic Scheduling in a Stochastic Environment Operations Research. 45: 894-903. DOI: 10.1287/Opre.45.6.894 |
0.336 |
|
1997 |
McKay KN, Kletter DB, Graves SC. OMAC: An environment for modeling and analysis Annals of Operations Research. 72: 241-264. DOI: 10.1023/A:1018900421933 |
0.32 |
|
1996 |
Graves SC. A multiechelon inventory model with fixed replenishment intervals Management Science. 42: 1-18. DOI: 10.1287/Mnsc.42.1.1 |
0.428 |
|
1995 |
Jordan WC, Graves SC. Principles on the benefits of manufacturing process flexibility Management Science. 41: 577-594. DOI: 10.1287/Mnsc.41.4.577 |
0.349 |
|
1989 |
Balakrishnan A, Graves SC. A composite algorithm for a concave‐cost network flow problem Networks. 19: 175-202. DOI: 10.1002/Net.3230190202 |
0.335 |
|
1988 |
Graves SC, Holmes CA. Equipment selection and task assignment for multiproduct assembly system design International Journal of Flexible Manufacturing Systems. 1: 31-50. DOI: 10.1007/Bf00713158 |
0.349 |
|
1986 |
Graves SC. A Tactical Planning Model for a Job Shop Operations Research. 34: 522-533. DOI: 10.1287/Opre.34.4.522 |
0.381 |
|
1986 |
Graves SC, Kostreva MM. Overlapping operations in material requirements planning Journal of Operations Management. 6: 283-294. DOI: 10.1016/0272-6963(86)90004-5 |
0.415 |
|
1985 |
Graves SC. A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment Management Science. 31: 1247-1256. DOI: 10.1287/Mnsc.31.10.1247 |
0.328 |
|
1985 |
Graves SC, Orlin JB. A minimum concave‐cost dynamic network flow problem with an application to lot‐sizing Networks. 15: 59-71. DOI: 10.1002/Net.3230150107 |
0.326 |
|
1984 |
Graves SC, Horwitch M, Bowman EH. Deep-draft dredging of U.S. coal ports: A cost-benefit analysis Policy Sciences. 17: 153-178. DOI: 10.1007/Bf00146926 |
0.303 |
|
1983 |
Graves SC, Keilson J. System balance for extended logistic systems Operations Research. 31: 234-252. DOI: 10.1287/Opre.31.2.234 |
0.336 |
|
1983 |
Graves SC, Meal HC, Stefek D, Zeghmi AH. Scheduling of re-entrant flow shops Journal of Operations Management. 3: 197-207. DOI: 10.1016/0272-6963(83)90004-9 |
0.363 |
|
1982 |
Graves SC. The Application of Queueing Theory to Continuous Perishable Inventory Systems Management Science. 28: 400-406. DOI: 10.1287/Mnsc.28.4.400 |
0.387 |
|
1982 |
Graves SC. Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems Management Science. 28: 260-275. DOI: 10.1287/Mnsc.28.3.260 |
0.365 |
|
1982 |
Graves SC. Note-A Multiple-Item Inventory Model with a Job Completion Criterion Management Science. 28: 1334-1337. DOI: 10.1287/Mnsc.28.11.1334 |
0.339 |
|
1981 |
Graves SC. A Review of Production Scheduling Operations Research. 29: 646-675. DOI: 10.1287/Opre.29.4.646 |
0.342 |
|
1981 |
Graves SC, Keilson J. The Compensation Method Applied to a One-Product Production/Inventory Problem Mathematics of Operations Research. 6: 246-262. DOI: 10.1287/Moor.6.2.246 |
0.402 |
|
1981 |
Gavish B, Graves SC. Production/inventory systems with a stochastic production rate under a continuous review policy Computers & Operations Research. 8: 169-183. DOI: 10.1016/0305-0548(81)90006-X |
0.426 |
|
1980 |
Gavish B, Graves SC. Technical Note—A One-Product Production/Inventory Problem under Continuous Review Policy Operations Research. 28: 1228-1236. DOI: 10.1287/Opre.28.5.1228 |
0.419 |
|
1980 |
Graves SC. The multi-product production cycling problem Aiie Transactions. 12: 233-240. DOI: 10.1080/05695558008974511 |
0.359 |
|
1979 |
Graves SC. Note---On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem Management Science. 25: 276-280. DOI: 10.1287/Mnsc.25.3.276 |
0.334 |
|
1978 |
Graves SC, Schwarz LB. Reply---On Stationarity and Optimality in Arborescent Production/Inventory Systems Management Science. 24: 1768-1769. DOI: 10.1287/Mnsc.24.16.1768 |
0.361 |
|
1978 |
Graves SC, Haessler RW. Note---On “Production Runs for Multiple Products: The Two-Product Heuristic” Management Science. 24: 1194-1198. DOI: 10.1287/Mnsc.24.11.1194 |
0.357 |
|
1978 |
Schwarz LB, Graves SC, Hausman WH. Scheduling policies for automatic warehousing systems: Simulation results Aiie Transactions. 10: 260-270. DOI: 10.1080/05695557808975213 |
0.656 |
|
1977 |
Graves SC, Hausman WH, Schwarz LB. Storage-Retrieval Interleaving in Automatic Warehousing Systems Management Science. 23: 935-945. DOI: 10.1287/Mnsc.23.9.935 |
0.673 |
|
1977 |
Graves SC, Schwarz LB. Single Cycle Continuous Review Policies for Arborescent Production/Inventory Systems Management Science. 23: 529-540. DOI: 10.1287/Mnsc.23.5.529 |
0.4 |
|
1977 |
Graves SC. Note---A Note on “Critical Ratio Scheduling: An Experimental Analysis” Management Science. 23: 1358-1359. DOI: 10.1287/Mnsc.23.12.1358 |
0.334 |
|
1976 |
Hausman WH, Schwarz LB, Graves SC. Optimal Storage Assignment in Automatic Warehousing Systems Management Science. 22: 629-638. DOI: 10.1287/Mnsc.22.6.629 |
0.67 |
|
Show low-probability matches. |