Year |
Citation |
Score |
2020 |
Huang J, Pan K, Guan Y. Multistage Stochastic Power Generation Scheduling Co-Optimizing Energy and Ancillary Services Informs Journal On Computing. DOI: 10.1287/Ijoc.2019.0933 |
0.35 |
|
2020 |
Yu Y, Guan Y, Chen Y. An Extended Integral Unit Commitment Formulation and an Iterative Algorithm for Convex Hull Pricing Ieee Transactions On Power Systems. 1-1. DOI: 10.1109/Tpwrs.2020.2993027 |
0.375 |
|
2019 |
Zhang T, Uryasev S, Guan Y. Derivatives and subderivatives of buffered probability of exceedance Operations Research Letters. 47: 130-132. DOI: 10.1016/J.Orl.2019.02.002 |
0.329 |
|
2019 |
Fan L, Pan K, Guan Y. A strengthened mixed-integer linear programming formulation for combined-cycle units European Journal of Operational Research. 275: 865-881. DOI: 10.1016/J.Ejor.2018.12.020 |
0.43 |
|
2018 |
Jiang R, Guan Y. Risk-Averse Two-Stage Stochastic Program with Distributional Ambiguity Operations Research. 66: 1390-1405. DOI: 10.1287/Opre.2018.1729 |
0.689 |
|
2018 |
Guan Y, Fan L, Yu Y. Unified Formulations for Combined-Cycle Units Ieee Transactions On Power Systems. 33: 7288-7291. DOI: 10.1109/Tpwrs.2018.2862157 |
0.384 |
|
2018 |
Zhao C, Guan Y. Data-driven risk-averse stochastic optimization with Wasserstein metric Operations Research Letters. 46: 262-267. DOI: 10.1016/J.Orl.2018.01.011 |
0.449 |
|
2017 |
Pan K, Guan Y. Data-Driven Risk-Averse Stochastic Self-Scheduling for Combined-Cycle Units Ieee Transactions On Industrial Informatics. 13: 3058-3069. DOI: 10.1109/Tii.2017.2710357 |
0.439 |
|
2016 |
Pan K, Guan Y. Strong Formulations for Multistage Stochastic Self-Scheduling Unit Commitment Operations Research. 64: 1482-1498. DOI: 10.1287/Opre.2016.1520 |
0.509 |
|
2016 |
Jiang R, Guan Y, Watson JP. Risk-averse stochastic unit commitment with incomplete information Iie Transactions (Institute of Industrial Engineers). 48: 838-854. DOI: 10.1080/0740817X.2016.1167287 |
0.679 |
|
2016 |
Jiang R, Guan Y, Watson JP. Cutting planes for the multistage stochastic unit commitment problem Mathematical Programming. 157: 121-151. DOI: 10.1007/S10107-015-0971-5 |
0.724 |
|
2016 |
Arslan AN, Richard JP, Guan Y. On the polyhedral structure of two‐level lot‐sizing problems with supplier selection Naval Research Logistics. 63: 647-666. DOI: 10.1002/Nav.21725 |
0.396 |
|
2015 |
Zhao C, Guan Y. Data-Driven Stochastic Unit Commitment for Integrating Wind Generation Ieee Transactions On Power Systems. DOI: 10.1109/Tpwrs.2015.2477311 |
0.531 |
|
2015 |
Fan L, Guan Y. An Edge-Based Formulation for Combined-Cycle Units Ieee Transactions On Power Systems. DOI: 10.1109/Tpwrs.2015.2443036 |
0.418 |
|
2015 |
Pan K, Guan Y, Watson JP, Wang J. Strengthened MILP Formulation for Certain Gas Turbine Unit Commitment Problems Ieee Transactions On Power Systems. DOI: 10.1109/Tpwrs.2015.2426139 |
0.436 |
|
2015 |
Jiang R, Guan Y. Data-driven chance constrained stochastic program Mathematical Programming. DOI: 10.1007/S10107-015-0929-7 |
0.689 |
|
2014 |
Wei L, Guan Y. Optimal Control of Plug-In Hybrid Electric Vehicles with Market Impact and Risk Attitude Transportation Science. 48: 467-482. DOI: 10.1287/Trsc.2014.0532 |
0.344 |
|
2014 |
Zhao C, Wang Q, Wang J, Guan Y. Expected Value and Chance Constrained Stochastic Unit Commitment Ensuring Wind Power Utilization Ieee Transactions On Power Systems. 29: 2696-2705. DOI: 10.1109/Tpwrs.2014.2319260 |
0.494 |
|
2014 |
Fan L, Wang J, Jiang R, Guan Y. Min-Max Regret Bidding Strategy for Thermal Generator Considering Price Uncertainty Ieee Transactions On Power Systems. 29: 2169-2179. DOI: 10.1109/Tpwrs.2014.2308477 |
0.683 |
|
2014 |
Guan Y, Wang J. Uncertainty Sets for Robust Unit Commitment Ieee Transactions On Power Systems. 29: 1439-1440. DOI: 10.1109/Tpwrs.2013.2288017 |
0.415 |
|
2014 |
Zhao C, Guan Y. Extended formulations for stochastic lot-sizing problems Operations Research Letters. 42: 278-283. DOI: 10.1016/J.Orl.2014.04.003 |
0.441 |
|
2014 |
Jiang R, Zhang M, Li G, Guan Y. Two-stage network constrained robust unit commitment problem European Journal of Operational Research. 234: 751-762. DOI: 10.1016/J.Ejor.2013.09.028 |
0.708 |
|
2013 |
Guan Y, Fu Y, Liu C, Powell W, Ryan S, Watson J, Wu L. Guest Editorial: Introduction to the special section on optimization methods and algorithms applied to smart grid Ieee Transactions On Smart Grid. 4: 2121-2121. DOI: 10.1109/Tsg.2013.2291698 |
0.333 |
|
2013 |
Zhao C, Guan Y. Unified Stochastic and Robust Unit Commitment Ieee Transactions On Power Systems. 28: 3353-3361. DOI: 10.1109/Tpwrs.2013.2251916 |
0.514 |
|
2013 |
Jiang R, Wang J, Zhang M, Guan Y. Two-Stage Minimax Regret Robust Unit Commitment Ieee Transactions On Power Systems. 28: 2271-2282. DOI: 10.1109/Tpwrs.2013.2250530 |
0.706 |
|
2013 |
Wang Q, Watson J, Guan Y. Two-stage robust optimization for N-k contingency-constrained unit commitment Ieee Transactions On Power Systems. 28: 2366-2375. DOI: 10.1109/Tpwrs.2013.2244619 |
0.503 |
|
2013 |
Zhao C, Wang J, Watson J, Guan Y. Multi-Stage Robust Unit Commitment Considering Wind and Demand Response Uncertainties Ieee Transactions On Power Systems. 28: 2708-2717. DOI: 10.1109/Tpwrs.2013.2244231 |
0.458 |
|
2013 |
Wang Q, Wang J, Guan Y. Price-Based Unit Commitment With Wind Power Utilization Constraints Ieee Transactions On Power Systems. 28: 2718-2726. DOI: 10.1109/Tpwrs.2012.2231968 |
0.45 |
|
2013 |
Wang Q, Wang J, Guan Y. Stochastic Unit Commitment With Uncertain Demand Response Ieee Transactions On Power Systems. 28: 562-563. DOI: 10.1109/Tpwrs.2012.2202201 |
0.453 |
|
2013 |
He F, Wu D, Yin Y, Guan Y. Optimal deployment of public charging stations for plug-in hybrid electric vehicles Transportation Research Part B-Methodological. 47: 87-101. DOI: 10.1016/J.Trb.2012.09.007 |
0.373 |
|
2013 |
Zhou Z, Guan Y. Two-stage stochastic lot-sizing problem under cost uncertainty Annals of Operations Research. 209: 207-230. DOI: 10.1007/S10479-013-1333-4 |
0.458 |
|
2013 |
Zheng QP, Wang J, Pardalos PM, Guan Y. A decomposition approach to the two-stage stochastic unit commitment problem Annals of Operations Research. 210: 387-410. DOI: 10.1007/S10479-012-1092-7 |
0.524 |
|
2013 |
Guan Y, Yang K, Zhou Z. The crane scheduling problem: models and solution approaches Annals of Operations Research. 203: 119-139. DOI: 10.1007/S10479-010-0765-3 |
0.445 |
|
2012 |
Jiang R, Wang J, Guan Y. Robust Unit Commitment With Wind Power and Pumped Storage Hydro Ieee Transactions On Power Systems. 27: 800-810. DOI: 10.1109/Tpwrs.2011.2169817 |
0.681 |
|
2012 |
Wang Q, Guan Y, Wang J. A Chance-Constrained Two-Stage Stochastic Program for Unit Commitment With Uncertain Wind Power Output Ieee Transactions On Power Systems. 27: 206-215. DOI: 10.1109/Tpwrs.2011.2159522 |
0.514 |
|
2011 |
Jiang R, Guan Y. An O(N2)-time algorithm for the stochastic uncapacitated lot-sizing problem with random lead times Operations Research Letters. 39: 74-77. DOI: 10.1016/J.Orl.2010.10.004 |
0.648 |
|
2011 |
Hu Y, Guan Y, Liu T. Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games European Journal of Operational Research. 210: 231-240. DOI: 10.1016/J.Ejor.2010.09.001 |
0.336 |
|
2011 |
Guan Y. Stochastic lot-sizing with backlogging: Computational complexity analysis Journal of Global Optimization. 49: 651-678. DOI: 10.1007/S10898-010-9555-3 |
0.5 |
|
2010 |
Guan Y, Yang KH. Analysis of berth allocation and inspection operations in a container terminal Maritime Economics and Logistics. 12: 347-369. DOI: 10.1057/Mel.2010.12 |
0.309 |
|
2010 |
Zhou Z, Guan Y. Stochastic lot-sizing problem with deterministic demands and Wagner-Whitin costs Operations Research Letters. 38: 414-419. DOI: 10.1016/J.Orl.2010.05.007 |
0.426 |
|
2010 |
Guan Y, Liu T. Stochastic lot-sizing problem with inventory-bounds and constant order-capacities European Journal of Operational Research. 207: 1398-1409. DOI: 10.1016/J.Ejor.2010.07.003 |
0.492 |
|
2009 |
Guan Y, Ahmed S, Nemhauser GL. Cutting planes for multistage stochastic integer programs Operations Research. 57: 287-298. DOI: 10.1287/Opre.1080.0535 |
0.607 |
|
2008 |
Guan Y, Miller AJ. Polynomial-Time Algorithms for Stochastic Uncapacitated Lot-Sizing Problems Operations Research. 56: 1172-1183. DOI: 10.1287/Opre.1070.0479 |
0.518 |
|
2008 |
Guan Y, Yang W, Owen H, Blough DM. A pricing approach for bandwidth allocation in differentiated service networks Computers and Operations Research. 35: 3769-3786. DOI: 10.1016/J.Cor.2007.02.003 |
0.393 |
|
2007 |
Guan Y, Ahmed S, Nemhauser GL. Sequential pairing of mixed integer inequalities Discrete Optimization. 4: 21-39. DOI: 10.1016/J.Disopt.2006.10.003 |
0.547 |
|
2007 |
Cheung RK, Xu D, Guan Y. A Solution Method for a Two-dispatch Delivery Problem with Stochastic Customers Journal of Mathematical Modelling and Algorithms. 6: 87-107. DOI: 10.1007/S10852-006-9051-4 |
0.491 |
|
2006 |
Guan Y, Ahmed S, Miller AJ, Nemhauser GL. On formulations of the stochastic uncapacitated lot-sizing problem Operations Research Letters. 34: 241-250. DOI: 10.1016/J.Orl.2005.05.004 |
0.561 |
|
2006 |
Guan Y, Ahmed S, Nemhauser GL, Miller AJ. A branch-and-cut algorithm for the stochastic uncapacitated lot-sizing problem Mathematical Programming. 105: 55-84. DOI: 10.1007/S10107-005-0572-9 |
0.603 |
|
2005 |
Ahmed S, Guan Y. The inverse optimal value problem Mathematical Programming. 102: 91-110. DOI: 10.1007/S10107-004-0515-X |
0.604 |
|
2004 |
Guan Y, Cheung RK. The berth allocation problem: models and solution methods Or Spectrum. 26: 75-92. DOI: 10.1007/3-540-26686-0_6 |
0.41 |
|
2002 |
Guan Y, Xiao W, Cheung RK, Li C. A multiprocessor task scheduling model for berth allocation: heuristic and worst-case analysis Operations Research Letters. 30: 343-350. DOI: 10.1016/S0167-6377(02)00147-5 |
0.375 |
|
Show low-probability matches. |